DEPARTMENT OF ENERGY
[Project No. 2117-001 South Carolina]
South Carolina Public Service Authority; Availability of
Environmental Assessment
March 15, 1994.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380 (Order No. 486, 52 FR 47910), the Office of Hydropower Licensing
(OHL) has reviewed the application for replacing an existing
transmission line for the Clark Hill-Aiken Transmission Line Project.
The transmission line is 27.6 miles long, originating at the switchyard
of the Clark Hill Dam on the Savannah River and terminating at Santee-
Coopers's Aiken No. 1 substation. The proposed new line parallels the
existing line.
The staff of OHL's Division of Project Compliance and
Administration has prepared an Environmental Assessment (EA) for the
proposed action. In the EA, the staff concludes that the licensee's
proposals would not constitute a major federal action significantly
affecting the quality of the human environment.
Copies of the EA are available for review in the Reference and
Information Center, room 3308, of the Commission's Offices at 941 North
Capitol Street, NE., Washington, DC 20426.
Lois D. Cashell,
Secretary.
[FR Doc. 94-6468 Filed 3-18-94; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 03/21/1994
- Department:
- Energy Department
- Entry Type:
- Uncategorized Document
- Document Number:
- 94-6468
- Pages:
- 0-0 (1 pages)
- Docket Numbers:
- Federal Register: March 21, 1994, Project No. 2117-001 South Carolina