95-6004. Approval and Promulgation of Implementation Plans; Illinois  

  • [Federal Register Volume 60, Number 54 (Tuesday, March 21, 1995)]
    [Proposed Rules]
    [Pages 14920-14921]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-6004]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    40 CFR Part 52
    
    [IL79-2-6616B; FRL-5167-8]
    
    
    Approval and Promulgation of Implementation Plans; Illinois
    
    AGENCY: Environmental Protection Agency (USEPA).
    
    ACTION: Proposed rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The USEPA proposes to approve requested revisions to the 
    Chicago ozone Federal Implementation Plan as it pertains to the 
    following sources: General Motors Corporation, [[Page 14921]] Minnesota 
    Mining and Manufacturing Corporation; Replogle Globes, Inc., Candle 
    Corporation of America, Nalco Chemical Company, Parisian Novelty 
    Company, Meyercord Corporation, Wallace Computer Services, Inc. and 
    General Packaging Products, Inc. This action lists the FIP revisions 
    USEPA is proposing to approve and provides an opportunity to request a 
    public hearing. A detailed rationale for approving these requests is 
    presented in the final rules section of this Federal Register, where 
    USEPA is approving the revision requests as a direct final rule without 
    prior proposal because USEPA views these as noncontroversial revisions 
    and anticipates no adverse comments. If no adverse comments or requests 
    for a public hearing are received in response to that direct final 
    rule, no further activity is contemplated in relation to this proposed 
    rule. If USEPA receives adverse comments or a public hearing request, 
    the direct final rule will be withdrawn. The USEPA will institute a 
    second comment period on this notice only if a public hearing is 
    requested. Any parties interested in commenting on this notice should 
    do so at this time. If a request for a public hearing is received, 
    USEPA will publish a notice in the Federal Register announcing a public 
    hearing. The final rule on this proposed action will address all 
    comments received.
    
    DATES: Comments on this proposal must be received by April 20, 1995. A 
    public hearing, if requested, will be held in Chicago, Illinois. 
    Requests for a public hearing should be submitted to J. Elmer Bortzer 
    by April 20, 1995.
    
    ADDRESSES: Written comments and requests for a public hearing on this 
    proposed action should be addressed to: J. Elmer Bortzer, Chief, 
    Regulation Development Section (AR-18J), Environmental Protection 
    Agency, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604.
        Comments should be strictly limited to the subject matter of this 
    proposal.
    
    DOCKET: Pursuant to section 307(d)(1)(B) of the Clean Air Act (Act), 42 
    U.S.C. 7607(d)(1)(B), this action is subject to the procedural 
    requirements of section 307(d). Therefore, USEPA has established a 
    public docket for this action, A-94-39, which is available for public 
    inspection and copying between 8 a.m. and 4 p.m., Monday through 
    Friday, at the following addresses. We recommend that you contact 
    Fayette Bright before visiting the Chicago location and Rachel Romine 
    before visiting the Washington, D.C. location. A reasonable fee may be 
    charged for copying.
    
        The United States Environmental Protection Agency, Region 5, 
    Regulation Development Branch, Eighteenth Floor, Southeast, 77 West 
    Jackson Boulevard, Chicago, Illinois, 60604, (312) 886-6069.
        United States Environmental Protection Agency, Docket No. A-94-39, 
    Air Docket (LE-131), Room M1500, Waterside Mall, 401 M Street SW., 
    Washington, D.C. 20460, (202) 245-3639.
    
    FOR FURTHER INFORMATION CONTACT:
    Steven Rosenthal, Regulation Development Branch (AR-18J), U.S. 
    Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, 
    Chicago, Illinois 60604, (312) 886-6052.
    
    SUPPLEMENTARY INFORMATION: For additional information see the direct 
    final rule published in the rules section of this Federal Register.
    
        Dated: February 28, 1995.
    Carol M. Browner,
    Administrator.
    [FR Doc. 95-6004 Filed 3-20-95; 8:45 am]
    BILLING CODE 6560-50-M
    
    

Document Information

Published:
03/21/1995
Department:
Environmental Protection Agency
Entry Type:
Proposed Rule
Action:
Proposed rule.
Document Number:
95-6004
Dates:
Comments on this proposal must be received by April 20, 1995. A public hearing, if requested, will be held in Chicago, Illinois. Requests for a public hearing should be submitted to J. Elmer Bortzer by April 20, 1995.
Pages:
14920-14921 (2 pages)
Docket Numbers:
IL79-2-6616B, FRL-5167-8
PDF File:
95-6004.pdf
Supporting Documents:
» Approval and Promulgation of Implementation Plans; Illinois
» Approval and Promulgation of Implementation Plans; Illinois
CFR: (1)
40 CFR 52