96-6839. Floodplain Statement of Findings For West Tributary Surface Water Monitoring Improvements  

  • [Federal Register Volume 61, Number 56 (Thursday, March 21, 1996)]
    [Notices]
    [Page 11622]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-6839]
    
    
    
    -----------------------------------------------------------------------
    
    
    DEPARTMENT OF ENERGY
    
    Floodplain Statement of Findings For West Tributary Surface Water 
    Monitoring Improvements
    
    AGENCY: Office of Environmental Management, Department of Energy (DOE).
    
    ACTION: Floodplain statement of findings.
    
    -----------------------------------------------------------------------
    
    SUMMARY: This Floodplain Statement of Findings for the West Tributary 
    Surface Water Monitoring Improvements Project has been prepared in 
    accordance with 10 CFR Part 1022. DOE proposes to replace an existing 
    V-notched, contracted, weir that is located within the 100-year 
    floodplain of White Oak Creek in Roane County, Tennessee with a 
    complex-shaped critical flow flume. A Floodplain Assessment (available 
    from the Oak Ridge address below) describing the potential effects of 
    the action and alternatives to avoid or minimize potential harm to or 
    within the affected floodplain was prepared. DOE will allow 15 days of 
    public review after publication of this Statement of Findings before 
    implementing the proposed action.
    
    FOR FURTHER INFORMATION CONTACT: Bryan Westich, Waste Management 
    Technology Development Division, U.S. Department of Energy, 3 Main 
    Street, Oak Ridge, Tennessee 37830, Telephone (615) 241-2160, FAX (615) 
    576-5333.
    
    FOR FURTHER INFORMATION ON GENERAL DOE FLOODPLAIN/WETLANDS 
    ENVIRONMENTAL REVIEW REQUIREMENTS CONTACT: Carol M. Borgstrom, 
    Director, Office of NEPA Policy and Assistance, EH-42, U.S. Department 
    of Energy, 1000 Independence Avenue, S.W., Washington, D.C. 20585, 
    (202) 586-4600 or (800) 472-2756.
    
    SUPPLEMENTARY INFORMATION: This is a Floodplain Statement of Findings 
    for the West Tributary Surface Water Monitoring Improvements Project 
    prepared in accordance with 10 CFR Part 1022. A Notice of Involvement 
    for the proposed action was published in the Federal Register on 
    October 4, 1993. This action is part of the Surface Water Monitoring 
    Program at the Oak Ridge National Laboratory (ORNL) to enhance the 
    accuracy of flow measurement and contaminant mass flux monitoring by 
    upgrading or replacing existing flow measurement structures or devices. 
    One such flow measurement structure is located in a tributary (West 
    Tributary) to White Oak Lake. The structure is also located within the 
    100-year floodplain of White Oak Creek. The site is located in an area 
    that is not accessible to the general public.
        DOE is proposing to replace an existing V-notched, contracted, weir 
    with a complex-shaped critical flow flume which will facilitate a 
    larger range of flow measurement. As part of this action it would be 
    necessary to demolish the existing V-notched weir structure and 
    recontour the streams side slopes and bed to accommodate the 
    installation of the new flume. Stream flow would be diverted during 
    demolition and construction activities.
        Three alternatives were considered in addition to the proposed 
    action. The first was the no-action alternative. This alternative would 
    not meet the program objective for enhanced accuracy of stream flow 
    measurement and contaminant mass flux monitoring. The second 
    alternative would be the restoration or upgrading of the existing weir 
    structure. This action would not result in a significant increase in 
    measurable flow range and would not meet the program objectives. The 
    third alternative would be to replace the weir with a commercially 
    available H-flume in lieu of the critical flow flume. The use of an H-
    flume would result in a greater upstream water depth to accommodate the 
    desired flow range. Additional topographic contouring would be required 
    in the area of the H-flume. Therefore the use of the H-flume would be 
    less practical than the use of the critical flow flume. There is no 
    practicable alternative to the location of this action in the 
    floodplain.
        The Floodplain Assessment concluded that the replacement of the V-
    notched weir with the critical flow flume would have no significant 
    effect on the 100-year floodplains of White Oak Creek, White Oak Lake, 
    or the West Tributary. Risks to individuals, property, or the 
    environment will not be increased as a result of this action. DOE will 
    allow 15 days of public review after publication of the Statement of 
    Findings before implementing the proposed action.
    
        Issued in Oak Ridge, Tennessee on March 11, 1996.
    James L. Elmore,
    Alternate NEPA Compliance Officer.
    [FR Doc. 96-6839 Filed 3-20-96; 8:45 am]
    BILLING CODE 6450-01-P
    
    

Document Information

Published:
03/21/1996
Department:
Energy Department
Entry Type:
Notice
Action:
Floodplain statement of findings.
Document Number:
96-6839
Pages:
11622-11622 (1 pages)
PDF File:
96-6839.pdf