97-7170. Duke Power Company, et al. Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 62, Number 55 (Friday, March 21, 1997)]
    [Notices]
    [Pages 13605-13609]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-7170]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. ER96-110-004, et al.]
    
    
    Duke Power Company, et al. Electric Rate and Corporate Regulation 
    Filings
    
    March 14, 1997.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Duke Power Company
    
    [Docket No. ER96-110-004]
    
        Take notice that on December 20, 1996, Duke Power Company tendered 
    for filing a Notification of Change in Status relating to the proposed 
    combination of Duke Power Company and PanEnergy Corp.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    2. National Power Management Company, Kohler Company, Dupont Power 
    Marketing, Inc., Energy Choice, L.L.C., SuperSystems, Inc., EMC Gas 
    Transmission Company, Cumberland Power, Inc.
    
    [Docket No. ER95-192-009, Docket No. ER95-1018-002, Docket No. ER95-
    1441-006, Docket No. ER96-827-004, Docket No. ER96-906-003, Docket No. 
    ER96-2320-002, Docket No. ER96-2624-001, (not consolidated)]
    
        Take notice that the following informational filings have been made 
    with the Commission and are on file and available for inspection and 
    copying in the Commission's Public Reference Room:
        On March 4, 1997, National Power Management Company filed certain 
    information as required by the Commission's January 4, 1995, order in 
    Docket No. ER95-192-000.
        On January 22, 1997, Kohler Company filed certain information as 
    required by the Commission's August 4, 1995, order in Docket No. ER95-
    1018-000.
        On February 24, 1997, Dupont Power Marketing, Inc. filed certain 
    information as required by the Commission's August 30, 1995, order in 
    Docket No. ER95-1441-000.
        On March 4, 1997, Energy Choice, L.L.C. filed certain information 
    as required by the Commission's March 21, 1996, order in Docket No. 
    ER96-827-000.
        On March 3, 1997, SuperSystems, Inc. filed certain information as 
    required by the Commission's March 27, 1996, order in Docket No. ER96-
    906-000.
        On March 3, 1997, EMC Gas Transmission Company filed certain 
    information as required by the Commission's September 3, 1996, order in 
    Docket No. ER96-2320-000.
        On March 3, 1997, Cumberland Power, Inc. filed certain information 
    as required by the Commission's September 25, 1996, order in Docket No. 
    ER96-2624-000.
    
    3. PanEnergy Lake Charles Generation, Inc.
    
    [Docket No. ER96-1335-001]
    
        Take notice that on December 20, 1996, PanEnergy Lake Charles 
    Generation, Inc. tendered for filing a Notification of Change in 
    Status.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    4. Enova Energy Inc.
    
    [Docket No. ER96-2372-005]
    
        Take notice that on February 7, 1997, Enova Energy Inc. tendered 
    for filing its informational report concerning interlocking 
    directorates within its affiliated corporate structure.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    5. Public Service Company of New Mexico
    
    [Docket No. ER96-3117-000]
    
        Take notice that on February 24, 1997, Public Service Company of 
    New Mexico tendered for filing an amendment in the above-referenced 
    docket.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    6. H.Q. Energy Services (U.S.) Inc.
    
    [Docket No. ER97-851-000]
    
        Take notice that on March 11, 1997, H.Q. Energy Services, (U.S.) 
    Inc. tendered for filing an amendment in the above-referenced docket.
        Comment date: March 27, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Public Service Company of New Mexico
    
    [Docket No. ER97-1761-000]
    
        Take notice that on February 18, 1997, Public Service Company of 
    New Mexico (PNM) filed as an amendment to the San Juan Project 
    Operating Agreement (Operating Agreement) an Interim Invoicing 
    Agreement with respect to invoicing for coal deliveries from San Juan 
    Coal Company among PNM, Tucson Power Company (TEP) and the other owners 
    of interests in the San Juan Generating Station. This interim agreement 
    effectively modifies Modification 8 to the Operating Agreement for an 
    interim period from January 1, 1997 through December 31, 1997.
        PNM requests waiver of the Commission's notice requirements in 
    order to allow the Interim Invoicing Agreement to be effective as of 
    January 1, 1997.
        Copies of this filing have been served upon the New Mexico Public 
    Utility Commission, TEP and each of the owners of an interest in the 
    San Juan Generating Station.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. NICOR Energy Management Services Company
    
    [Docket No. ER97-1816-000]
    
        Take notice that on February 25, 1997, NICOR Energy Management 
    Services Company (NEMS) tendered for filing a petition for an order (1) 
    accepting NEMS' Rate Schedule FERC No. 1; granting certain blanket 
    approvals, including the authority to sell electricity
    
    [[Page 13606]]
    
    at market-based rates; and (3) waiving certain requirements of the 
    Commission's Regulations.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. Louisville Gas and Electric Company
    
    [Docket No. ER97-1887-000]
    
        Take notice that on February 26, 1997, Louisville Gas and Electric 
    Company (LG&E) tendered for filing an executed Non-Firm Point-to-Point 
    Transmission Service Agreement between LG&E and American Energy 
    Solutions under LG&E's Open Access Transmission Tariff.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    10. Louisville Gas and Electric Company
    
    [Docket No. ER97-1888-000]
    
        Take notice that on February 26, 1997, Louisville Gas and Electric 
    Company (LG&E) tendered for filing an executed Service Agreement 
    between LG&E and WPS Energy Service, Inc. under LG&E's Rate Schedule 
    GSS.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    11. Louisville Gas and Electric Company
    
    [Docket No. ER97-1889-000]
    
        Take notice that on February 26, 1997, Louisville Gas and Electric 
    Company (LG&E) tendered for filing an executed Service Agreement 
    between LG&E and MidCon Power Services Corp. under LG&E's Rate Schedule 
    GSS.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    12. Northern States Power Company (Minnesota)
    
    [Docket No. ER97-1913-000]
    
        Take notice that on February 28, 1997, Northern States Power 
    Company (Minnesota) (NSP), tendered for filing a Network Integration 
    Transmission Service Agreement and a Network Operating Agreement 
    between NSP and United Power Association.
        NSP requests that the Commission accept the agreement effective 
    February 1, 1997, and requests waiver of the Commission's notice 
    requirements in order for the agreement to be accepted for filing on 
    the date requested.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    13. Northern States Power Company (Minnesota)
    
    [Docket No. ER97-1914-000]
    
        Take notice that on February 28, 1996, Northern States Power 
    Company (NSP), tendered Amendment No. 1 and its unbundled power sale 
    rate information for the Municipal Interconnection and Interchange 
    Agreement with Madelia Municipal Light & Power Plant. NSP requests an 
    effective date of March 1, 1997.
        A copy of the filing was served upon each of the parties named in 
    the Service List.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    14. Duquesne Light Company
    
    [Docket No. ER97-1915-000]
    
        Take notice that on February 24, 1997, Duquesne Light Company (DLC) 
    filed a Service Agreement dated February 19, 1997, with Southern Energy 
    Trading and Marketing, Inc. under DLC's Open Access Transmission Tariff 
    (Tariff). The Service Agreement adds Southern Energy Trading and 
    Marketing, Inc. as a customer under the Tariff. DLC requests an 
    effective date of February 19, 1997, for the Service Agreement.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    15. Rochester Gas and Electric Corporation
    
    [Docket No. ER97-1916-000]
    
        Take notice that on February 28, 1997, Rochester Gas and Electric 
    Corporation (RG&E), filed a Service Agreement between RG&E and the 
    Heartland Energy Services, Inc. (Customer). This Service Agreement 
    specifies that the Customer has agreed to the rates, terms and 
    conditions of the RG&E open access transmission tariff filed on July 9, 
    1996 in Docket No. OA96-141-000.
        RG&E requests waiver of the Commission's sixty (60) day notice 
    requirements and an effective date of February 14, 1997, for the 
    Heartland Energy Services, Inc. Service Agreement. RG&E has served 
    copies of the filing on the New York State Public Service Commission 
    and on the Customer.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    16. Duquesne Light Company
    
    [Docket No. ER97-1917-000]
    
        Take notice that on February 24, 1997, Duquesne Light Company 
    (DLC), filed a Service Agreement dated February 19, 1997 with Minnesota 
    Power under DLC's Open Access Transmission Tariff (Tariff). The Service 
    Agreement adds Minnesota Power as a customer under the Tariff. DLC 
    requests an effective date of February 19, 1997 for the Service 
    Agreement.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    17. Ohio Edison Company Pennsylvania Power Company
    
    [Docket No. ER97-1918-000]
    
        Take notice that on February 28, 1997, Ohio Edison Company and 
    Pennsylvania Power Company (Ohio Edison), tendered for filing a Service 
    Agreement with Minnesota Power & Light Company pursuant to Ohio 
    Edison's Power Sales Tariff. This Service Agreement will enable Ohio 
    Edison and Pennsylvania Power Company to sell capacity and energy in 
    accordance with the terms of the Tariff.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    18. Florida Power Corporation
    
    [Docket No. ER97-1919-000]
    
        Take notice that on February 28, 1997, Florida Power Corporation 
    (Florida Power), tendered for filing a service agreement providing 
    service to Coral Power, L.L.C. (Coral) pursuant to its open access 
    transmission tariff (the T-6 Tariff). Florida Power requests that the 
    Commission waive its notice of filing requirements and allow the 
    agreement to become effective on March 3, 1997.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    19. Southern California Edison Co.
    
    [Docket No. ER97-1920-000]
    
        Take notice that on March 3, 1997, Southern California Edison 
    Company (Edison), tendered for filing a letter dated February 28, 1997 
    (Letter), to the Southern California Water Company. The Letter modifies 
    the terms under which FERC Rate Schedule No. 33.31 shall terminate.
        Edison requests waiver of the Commission's 60-day notice 
    requirement and an effective date of March 4, 1997.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    [[Page 13607]]
    
    20. Southwestern Electric Power Company
    
    [Docket No. ER97-1921-000]
    
        Take notice that on March 3, 1997, Southwestern Electric Power 
    Company (SWEPCO), tendered for filing the final return on common equity 
    (Final ROE) to be used in redetermining or ``truing-up'' cost-of-
    service formula rates for wholesale service in 1996 to Northeast Texas 
    Electric Cooperative, Inc., the City of Bentonville, Arkansas, the City 
    of Hope, Arkansas, Rayburn Country Electric Cooperative, Inc., Cajun 
    Electric Power Cooperative, Inc., Tex-La Electric Cooperative of Texas, 
    Inc. and East Texas Electric Cooperative, Inc. SWEPCO provides service 
    to these Customers under contracts which provide for periodic changes 
    in rates and charges determined in accordance with cost-of-service 
    formulas, including a formulaic determination of the return on common 
    equity.
        Copies of the filing were served upon the affected wholesale 
    Customers, the Public Utility Commission of Texas, the Louisiana Public 
    Service Commission and the Arkansas Public Service Commission.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    21. Southern California Edison Co.
    
    [Docket No. ER97-1922-000]
    
        Take notice that on March 3, 1997, Southern California Edison 
    Company (Edison), tendered for filing Service Agreements (Service 
    Agreements) with the City of Vernon for Firm Point-To-Point 
    Transmission Service under Edison's Open Access Transmission Tariff 
    (Tariff) filed in compliance with FERC Order No. 888.
        Edison filed the executed Service Agreements with the Commission in 
    compliance with applicable Commission Regulations. Edison also 
    submitted a revised Sheet No. 152 (Attachment E) to the Tariff, which 
    is an updated list of all current subscribers. Edison requests waiver 
    of the Commission's notice requirement to permit an effective date of 
    March 4, 1997 for Attachment E, and to allow the Service Agreements to 
    become effective according to their terms.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    22. Louisville Gas and Electric Co.
    
    [Docket No. ER97-1923-000]
    
        Take notice that on March 3, 1997, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Service Agreement 
    between LG&E and American Energy Solutions, Inc. under LG&E's Rate 
    Schedule GSS.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    23. Louisville Gas and Electric Co.
    
    [Docket No. ER97-1924-000]
    
        Take notice that on March 3, 1997, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Non-Firm Point-to-Point 
    Transmission Service Agreement between LG&E and Ohio Valley Electric 
    Corporation (OVEC) under LG&E's Open Access Transmission Tariff.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    24. Wisconsin Public Service Corporation
    
    [Docket No. ER97-1925-000]
    
        Take notice that on March 3, 1997, Wisconsin Public Service 
    Corporation (WPSC), tendered for filing an executed Transmission 
    Service Agreement between WPSC and Northern Indiana Public Service Co. 
    The Agreement provides for transmission service under the Open Access 
    Transmission Service Tariff, FERC Original Volume No. 11.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    25. Wisconsin Public Service Corporation
    
    [Docket No. ER97-1926-000]
    
        Take notice that on March 3, 1997, Wisconsin Public Service 
    Corporation, tendered for filing an executed service agreement with 
    Northern Indiana Public Service Company under its CS-1 Coordination 
    Sales Tariff.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    26. Rochester Gas and Electric Corporation
    
    [Docket No. ER97-1927-000]
    
        Take notice that on March 3, 1997, Rochester Gas and Electric 
    Corporation (RG&E), filed a Service Agreement between RG&E and the Plum 
    Street Energy Marketing (Customer). This Service Agreement specifies 
    that the Customer has agreed to the rates, terms and conditions of 
    RG&E's FERC Electric Rate Schedule, Original Volume 1 (Power Sales 
    Tariff) accepted by the Commission in Docket No. ER94-1279-000, as 
    amended by RG&E's December 31, 1996, filing in Docket No. OA97-243-000.
        RG&E requests waiver of the Commission's sixty (60) day notice 
    requirements and an effective date of February 14, 1997, for the Plum 
    Street Energy Marketing Service Agreement. RG&E has served copies of 
    the filing on the New York State Public Service Commission and on the 
    Customer.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    27. Allegheny Power Service Corporation, on behalf of Monongahela Power 
    Company, The Potomac Edison Company, and West Penn Power Company 
    (Allegheny Power)
    
    [Docket No. ER97-1928-000]
    
        Take notice that on February 21, 1997, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power), filed Supplement 
    No. 12 to add EnerZ Corporation, Minnesota Power & Light Company, and 
    TransCanada Energy Ltd. to Allegheny Power's Open Access Transmission 
    Service Tariff which has been submitted for filing by the Federal 
    Energy Regulatory Commission in Docket No. OA96-18-000. The proposed 
    effective date under the Service Agreements is February 20, 1997.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the West Virginia Public Service 
    Commission.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    28. Delmarva Power & Light Company
    
    [Docket No. ER97-1929-000]
    
        Take notice that on February 28, 1997, Delmarva Power & Light 
    Company (Delmarva), tendered for filing a First Revised Leaf No. 2 of 
    its Market Rate Sales Tariff. The amendment changes the definition of 
    Transmission Tariff to substitute the transmission tariff of the 
    Pennsylvania-New Jersey-Maryland Interconnection Association, or 
    successor organization, (PJM) for the transmission tariff of Delmarva. 
    The purpose of the change is to conform the Market Rate Sales Tariff to 
    the transition from Delmarva's tariff to the PJM Tariff when the 
    Commission allows it to become effective. Delmarva requests
    
    [[Page 13608]]
    
    waiver of the prior notice period to allow the amendment to become 
    effective on March 1, 1997, or as soon thereafter as the Commission 
    allows the PJM Tariff to become effective.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    29. Vermont Electric Power Company, Inc.
    
    [Docket No. ER97-1930-000]
    
        Take notice that on February 28, 1997, Vermont Electric Power 
    Company, Inc. (VELCO), tendered for filing a revised open access 
    transmission tariff (Tariff). On October 11, 1996, VELCO originally 
    filed its Tariff pursuant to Order No. 888 and the September 11, 1996, 
    Order on Requests by Public Utilities for Waivers of Orders Nos. 888 
    and 889. VELCO's February 28, 1997, filing revises the Tariff to enable 
    it to operate in conjunction with the open access transmission tariff 
    filed by the New England Power Pool (NEPOOL) on December 31, 1996. 
    VELCO requests that the tariff become effective on the effective date 
    of the NEPOOL tariff.
        VELCO states that it has served a copy of its filing on each of the 
    Vermont distribution utilities served by VELCO, the Vermont Department 
    of Public Service, the Vermont Public Utility Board, all intervenors in 
    this proceeding and all Eligible Customers that have requested a copy 
    of the filing.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    30. Northeast Utilities Service Co.
    
    [Docket No. ER97-1931-000]
    
        Take notice that on February 28, 1997, Northeast Utilities Service 
    Company (NUSCO), on behalf of The Connecticut Light and Power Company, 
    Western Massachusetts Electric Company, Holyoke Water Power Company 
    (including Holyoke Power and Electric Company) and Public Service 
    Company of New Hampshire, tendered for filing pursuant to Section 205 
    of the Federal Power Act and Section 35.13 of the Commission's 
    Regulations, a rate schedule change for sales of electric energy to 
    Middleton Municipal Electric Department.
        NUSCO states that a copy of this filing has been mailed to 
    Middleton Municipal Electric Department.
        NUSCO requests that the rate schedule change become effective on 
    May 1, 1997.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    31. Competitive Utility Services Corp.
    
    [Docket No. ER97-1932-000]
    
        Take notice that on February 27, 1997, Competitive Utility Services 
    Corp. (CUSCo), filed a petition for authority to sell power at market-
    based rates and for waiver of certain Commission Regulations. A copy of 
    the filing was served upon the Pennsylvania Public Utility Commission.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    32. The Dayton Power and Light Company
    
    [Docket No. ER97-1933-000]
    
        Take notice that on March 3, 1997, The Dayton Power and Light 
    Company (Dayton), submitted service agreements establishing Wabash 
    Valley Power Association, Inc., Illinois Power Company, Equitable Power 
    Services Company and American Energy Solutions, Inc. as customers under 
    the terms of Dayton's Open Access Transmission Tariff.
        Dayton requests an effective date of one day subsequent to this 
    filing for the service agreements. Accordingly, Dayton requests waiver 
    of the Commission's notice requirements. Copies of this filing were 
    served upon Wabash Valley Power Association, Inc., Illinois Power 
    Company, Equitable Power Services Company, American Energy Solutions, 
    Inc. and the Public Utilities Commission of Ohio.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    33. The Dayton Power and Light Company
    
    [Docket No. ER97-1934-000]
    
        Take notice that on March 3, 1997, The Dayton Power and Light 
    Company (Dayton), submitted service agreements establishing Wasbash 
    Valley Power Association, Inc., Equitable Power Services Company, 
    Duquesne Light Company, Illinois Power Company, and NIPSCO Energy 
    Services, Inc. as a customer under the terms of Dayton's Market-Based 
    Sales Tariff.
        Dayton requests an effective date of one day subsequent to this 
    filing for the service agreements. Accordingly, Dayton requests waiver 
    of the Commission's notice requirements. Copies of this filing were 
    served upon Wasbash Valley Power Association, Inc., Equitable Power 
    Services Company, Duquesne Light Company, Illinois Power Company, and 
    NIPSCO Energy Services, Inc. and the Public Utilities Commission of 
    Ohio.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    34. Florida Power & Light Company
    
    [Docket No. ER97-1935-000]
    
        Take notice that on March 3, 1997, Florida Power & Light Company 
    (FPL), tendered for filing a proposed Exhibit A to the Aggregate 
    Billing Partial Requirements Service Agreement Between Florida Power & 
    Light Company and Seminole Electric Cooperative, Inc. (ABPRSA).
        FPL requests that the proposed Exhibit A be permitted to become 
    effective on March 1, 1997.
        FPL states that this filing is in accordance with Part 35 of the 
    Commission's Regulations.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    35. Louisville Gas & Electric Co.
    
    [Docket No. ER97-1945-000]
    
        Take notice that on February 26, 1997, Louisville Gas & Electric 
    Company (LG&E) tendered for filing an Executed Service Agreement 
    between LG&E and PanEnergy Trading and Market Services, L.L.C. under 
    LG&E's Rate Schedule GSS.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    36. Louisville Gas & Electric Company
    
    [Docket No. ER97-1946-000]
    
        Take notice that on February 26, 1997, Louisville Gas & Electric 
    Company (LG&E) tendered for filing an Executed Service Agreement 
    between LG&E and Federal Energy Sales, Inc. under LG&E's Rate Schedule 
    GSS.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    37. Louisville Gas & Electric
    
    [Docket No. ER97-1960-000]
    
        Take notice that on February 26, 1997, Louisville Gas & Electric 
    Company (LG&E) tendered for filing an Executed Service Agreement 
    between LG&E and Ohio Valley Electric Corporation (OVEC) under LG&E's 
    Rate Schedule GSS.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    38. Arizona Public Service Company
    
    [Docket Nos. OA96-153-003 and ER96-2401-002]
    
        Take notice that on February 28, 1997, Arizona Public Service 
    Company tendered for filing Amendments to its Open Access Transmission 
    Tariff in
    
    [[Page 13609]]
    
    compliance with Commission Orders dated January 29, 1997 and January 
    30, 1997 in the above referenced docket numbers.
        A copy of this filing has been served on all parties on the 
    official service list.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    39. Orange and Rockland Utilities, Inc.
    
    [Docket No. OA97-121-000]
    
        Take notice that on February 24, 1997, Orange and Rockland 
    Utilities, Inc. acting on behalf of itself and its wholly owned 
    subsidiaries, Rockland Electric Company and Pike County Light & Power 
    Company (collectively referred to as the Company), in compliance with 
    the Commission's Order No. 889 issued April 24, 1996 in Docket No. 
    RM95-9-000, tendered for filing its revised Standards of Conduct for 
    the separation of transmission operation functions and generation 
    marketing functions.
        Comment date: March 28, 1997, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 97-7170 Filed 3-20-97; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
03/21/1997
Department:
Energy Department
Entry Type:
Notice
Document Number:
97-7170
Dates:
March 28, 1997, in accordance with Standard Paragraph E at the end of this notice.
Pages:
13605-13609 (5 pages)
Docket Numbers:
Docket No. ER96-110-004, et al.
PDF File:
97-7170.pdf