E8-5835. Notice of Public Information Collection(s) Being Reviewed by the Federal Communications Commission, Comments Requested  

  • Start Preamble March 13, 2008.

    SUMMARY:

    The Federal Communications Commission, as part of its continuing effort to reduce paperwork burdens, invites the general public and other Federal agencies to take this opportunity to comment on the following information collection, as required by the Paperwork Reduction Act (PRA) of 1995, Public Law No. 104-13. An agency may not conduct or sponsor a collection of information unless it displays a currently valid control number. Pursuant to the PRA, no person shall be subject to any penalty for failing to comply with a Start Printed Page 15157collection of information that does not display a valid control number. Comments are requested concerning (a) whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; (b) the accuracy of the Commission's burden estimate; (c) ways to enhance the quality, utility, and clarity of the information collected; and (d) ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology.

    DATES:

    Written PRA comments should be submitted on or before May 20, 2008. If you anticipate that you will be submitting comments but find it difficult to do so within the period of time allowed by this notice, you should advise the contact listed below as soon as possible.

    ADDRESSES:

    Interested parties may submit all PRA comments by e-mail or U.S. mail. To submit your comments by e-mail, send them to PRA@fcc.gov. To submit your comments by U.S. mail, mark them to the attention of Cathy Williams, Federal Communications Commission, Room 1-C823, 445 12th Street, SW., Washington, DC 20554.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    For additional information about the information collection, send an e-mail to PRA@fcc.gov or contact Cathy Williams at 202-418-2918.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    OMB Control Number: 3060-0009.

    Title: Application for Consent to Assignment of Broadcast Station Construction Permit or License or Transfer of Control of Corporation Holding Broadcast Station Construction Permit or License.

    Form Number: FCC Form 316.

    Type of Review: Revision of a currently approved collection.

    Respondents: Business or other for-profit entities; Not-for-profit institutions; State, local or tribal government.

    Number of Respondents and Responses: 750 respondents, 750 responses.

    Frequency of Response: On occasion reporting requirement.

    Obligation to Respond: Required to obtain benefits—Statutory authority for this collection of information is contained in Sections 154(i) and 310(d) of the Communications Act of 1934, as amended.

    Estimated Time Per Response: 1-4 hours.

    Total Annual Burden: 855 hours.

    Total Annual Costs: $425,150.

    Confidentiality: No need for confidentiality required.

    Privacy Impact Assessment: No impact(s).

    Needs and Uses: On March 17, 2005, the Commission released a Second Order on Reconsideration and Further Notice of Proposed Rulemaking, Creation of a Low Power Radio Service, MB Docket No. 99-25 (FCC 05-75). The Further Notice of Proposed Rulemaking (“FNPRM”) proposed to permit the assignment or transfer of control of Low Power FM (LPFM) authorizations where there is a change in the governing board of the permittee or licensee or in other situations corresponding to the circumstances described above. This proposed rule was subsequently adopted in a Third Report and Order and Second Further Notice of Proposed Rulemaking, MB Docket No. 99-25 (FCC 07-204) (Third Report and Order), released on December 11, 2007.

    FCC Form 316 has been revised to encompass the assignment and transfer of control of LPFM authorizations, as proposed in the FNPRM and subsequently adopted in the Third Report and Order, and to reflect the ownership and eligibility restrictions applicable to LPFM permittees and licensees.

    Filing of the FCC Form 316 is required when applying for authority for assignment of a broadcast station construction permit or license, or for consent to transfer control of a corporation holding a broadcast station construction permit or license where there is little change in the relative interest or disposition of its interests; where transfer of interest is not a controlling one; there is no substantial change in the beneficial ownership of the corporation; where the assignment is less than a controlling interest in a partnership; where there is an appointment of an entity qualified to succeed to the interest of a deceased or legally incapacitated individual permittee, licensee or controlling stockholder; and, in the case of LPFM stations, where there is a voluntary transfer of a controlling interest in the licensee or permittee entity. In addition, the applicant must notify the Commission when an approved transfer of control of a broadcast station construction permit or license has been consummated.

    OMB Control Number: 3060-0031.

    Title: Application for Consent to Assignment of Broadcast Station Construction Permit or License; Application for Consent to Transfer Control of Entity Holding Broadcast Station Construction Permit or License; Section 73.3580, Local Public Notice of Filing of Broadcast Applications.

    Form Number: FCC Form 314 and FCC Form 315.

    Type of Review: Revision of a currently approved collection.

    Respondents: Business or other for-profit entities; not-for-profit institutions.

    Number of Respondents and Responses: 4,510 respondents; 4,510 responses

    Frequency of Response: On occasion reporting requirement; third party disclosure requirement.

    Obligation to Respond: Required to obtain benefits—Statutory authority for this collection of information is contained in Sections 154(i), 303 and 308 of the Communications Act of 1934, as amended.

    Estimated Time Per Response: 1 hour to 5 hours.

    Total Annual Burden: 15,860 hours.

    Total Annual Costs: $33,343,150.

    Nature of Response: Required to obtain or retain benefits.

    Confidentiality: No need for confidentiality required.

    Privacy Impact Assessment: No impact(s).

    Needs and Uses: The Instructions to Forms 314 and 315 have been revised to reflect the new ownership limits adopted in the Third Report and Order and Second Notice of Proposed Rulemaking, FCC 07-204 (released December 11, 2007), namely, that an entity may own only one LPFM station. By amending the Rules to permanently limit LPFM eligibility, the Commission is protecting the public interest in localism and fostering greater diversity of programming from community sources. Forms 314 and 315 have also been revised to reflect the three-year holding period of an LPFM license, as adopted in the Third Report and Order, during which a licensee cannot transfer or assign a license, and must operate the station. That restriction will prevent entities from using the LPFM assignment and transfer process to undermine the Commission's LPFM policies and will ensure that the benefits to the public which were the basis for the license grant will be realized.

    On December 18, 2007, the Commission adopted a Report and Order and Order on Reconsideration in its 2006 Quadrennial Regulatory Review of the Commission's Broadcast Ownership Rules pursuant to Section 202 of the Telecommunications Act of 1996, MB Docket No. 06-121, FCC 07-216. Section 202 requires the Commission to review its broadcast ownership rules every four years and determine whether any of such rules are Start Printed Page 15158necessary in the public interest. Further, Section 202 requires the Commission to repeal or modify any regulation it determines to be no longer in the public interest.

    Consistent with actions taken by the Commission in the 2006 Quadrennial Regulatory Review, the following changes are made to Forms 314 and 315: The instructions to Forms 314 and 315 have been revised to include a reference to the 2006 Quadrennial Regulatory Review as a source of information regarding the Commission's multiple ownership attribution policies and standards. The language in Section A, IV of Worksheet #3 in Forms 314 and 315 is revised. This worksheet is used in connection with Section III, Item 6b of Form 314 and Section IV, Item 8b of Form 315 to determine the applicant's compliance with the Commission's multiple ownership rules and cross-ownership rules set forth in 47 CFR 73.3555. The revisions to the worksheet account for changes made by the Commission in the 2006 Quadrennial Review to 47 CFR 73.3555(d), the Daily Newspaper Cross-Ownership Rule. The revised rule changes the circumstances under which an entity may own a daily newspaper and a radio station or television station in the same designated market area. In Section B of Worksheet #3 of Form 314, the description of a “Daily Newspaper” is changed to comport to the definition of “Newspaper” contained in 47 CFR 73.3555(c)(3)(iii) that the Commission revised in the 2006 Quadrennial Regulatory Review. In Section B of Worksheet #3 of Form 315, language from 47 CFR 73.3555(d) is added to assist applicants in their determination of compliance with the Daily Newspaper Cross-Ownership Rule.

    FCC Form 314 and the applicable exhibits/explanations are required to be filed when applying for consent for assignment of an AM, FM, LPFM or TV broadcast station construction permit or license. In addition, the applicant must notify the Commission when an approved assignment of a broadcast station construction permit or license has been consummated.

    FCC Form 315 and applicable exhibits/explanations are required to be filed when applying for transfer of control of an entity holding an AM, FM, LPFM or TV broadcast station construction permit or license. In addition, the applicant must notify the Commission when an approved transfer of control of a broadcast station construction permit or license has been consummated. Due to the similarities in the information collected by these two forms, OMB has assigned both forms OMB Control Number 3060-0031.

    47 CFR 73.3580 requires local public notice in a newspaper of general circulation of the filing of all applications for transfer of control of license/permit. This notice must be completed within 30 days of the tendering of the application. This notice must be published at least twice a week for two consecutive weeks in a three-week period. A copy of this notice must be placed in the public inspection file along with the application. Additionally, an applicant for transfer of control of license must broadcast the same notice over the station at least once daily on four days in the second week immediately following the tendering for filing of the application.

    OMB Control: 3060-0110.

    Title: Application for Renewal of Broadcast Station License.

    Form Number: FCC Form 303-S.

    Type of Review: Revision of a currently approved collection.

    Respondents: Business or other for profit entities; Not for profit institutions.

    Number of Respondents and Responses: 3,217 respondents, 3,217 responses.

    Obligation to Respond: Required to obtain benefits—Statutory authority for this collection of information is contained in Sections 154(i), 303, 307 and 308 of the Communications Act of 1934, as amended, and Section 204 of the Telecommunications Act of 1996.

    Estimated Time per Response: 3-12 hours.

    Frequency of Response: Every eighth year reporting requirement; Third party disclosure requirement.

    Total Annual Burden: 6,335 hours.

    Total Annual Costs: $1,730,335.

    Nature of Response: Required to obtain or retain benefits.

    Nature and Extent of Confidentiality: There is no need for confidentiality with this information collection.

    Privacy Act Impact Assessment: No impact(s).

    Needs and Uses: On December 18, 2007, the Commission adopted a Report and Order and Order on Reconsideration in its 2006 Quadrennial Regulatory Review of the Commission's Broadcast Ownership Rules pursuant to Section 202 of the Telecommunications Act of 1996, MB Docket No. 06-121, FCC 07-216. Section 202 requires the Commission to review its broadcast ownership rules every four years and determine whether any of such rules are necessary in the public interest. Further, Section 202 requires the Commission to repeal or modify any regulation it determines to be no longer in the public interest. Consistent with actions taken by the Commission in the 2006 Quadrennial Regulatory Review, changes are made to Form 303-S to account for revisions made to 47 CFR 73.3555(d), the Daily Newspaper Cross-Ownership Rule. The revised rule changes the circumstances under which an entity may own a daily newspaper and a radio station or television station in the same designated market area. In Section III of Form 303-S, a new Question 7 is added which asks the licensee to certify that neither it nor any party to the application has an attributable interest in a newspaper that is within the scope of 47 CFR 73.3555(d). Instructions for this new question are added to Form 303-S, and include a reference to the 2006 Quadrennial Regulatory Review as a source of information regarding the Commission's newspaper/broadcast cross-ownership rule.

    OMB Control Number: 3060-0750.

    Title: 47 CFR Section 73.671 Educational and Informational Programming for Children; 47 CFR Section 73.673, Public Information Initiatives Regarding Educational and Informational Programming for Children.

    Form Number: Not applicable.

    Type of Review: Extension of a currently approved collection.

    Respondents: Business or other for-profit entities.

    Number of Respondents and Responses: 2,323 respondents; 4,266 responses.

    Estimated Time per Response: 1 to 5 minutes.

    Frequency of Response: Third party disclosure requirement.

    Obligation to Respond: Required to obtain or retain benefits. Statutory authority for this collection of information is contained in Sections 154(i) and 303 of the Communications Act of 1934, as amended.

    Total Annual Burden: 26,818.56 hours.

    Total Annual Cost: None.

    Privacy Act Impact Assessment: No impact(s).

    Nature and Extent of Confidentiality: There is no need for confidentiality.

    Needs and Uses: 47 CFR 73.671 C(5) states that a core educational television program must be identified as specifically designed to educate and inform children by the display on the television screen throughout the program of the symbol E/I.

    47 CFR 73.673 states each commercial television broadcast station licensee must provide information identifying programming specifically designed to educate and inform children to publishers of program guides. Such Start Printed Page 15159information must include an indication of the age group for which the program is intended.

    These requirements are intended to provide greater clarity about broadcasters' obligations under the Children's Television Act (CTA) of 1990 to air programming “specifically designed” to serve the educational and informational needs of children and to improve public access to information about the availability of these programs. These requirements provide better information to the public about the shows broadcasters air to satisfy their obligation to provide educational and informational programming under the Children's Television Act.

    OMB Control Number: 3060-0920.

    Title: Application for Construction Permit for a Low Power FM Broadcast Station.

    Form Number: FCC Form 318.

    Type of Review: Revision of a currently approved collection.

    Respondents: Not-for-profit institutions; State, local or tribal government.

    Number of Respondents and Responses: 16,659 respondents, 23,302 responses.

    Frequency of Response: Recordkeeping requirement; On occasion reporting requirement; Third party disclosure requirement.

    Obligation To Respond: Required to obtain benefits—Statutory authority for this collection of information is contained in Sections 154(i), 303, 308 and 325(a) of the Communications Act of 1934, as amended.

    Estimated Time per Response: 15 minutes to 12 hours.

    Total Annual Burden: 34,276 hours.

    Total Annual Costs: $35,850.

    Confidentiality: No need for confidentiality required.

    Privacy Impact Assessment: No impact(s).

    Needs and Uses: On December 11, 2007, the FCC released a Third Report and Order and Second Further Notice of Proposed Rulemaking (“Third Report and Order”) MM Docket No. 99-25, FCC 07-204. In the Third Report and Order, the FCC extended the local standards for rural markets. Under the old Rules, an LPFM applicant was deemed local if it was physically headquartered or had a campus within ten miles of the proposed LPFM transmitter site, or if 75 percent of its board members resided within ten miles of the proposed LPFM transmitter site. The Third Report and Order modified the ten-mile requirement to twenty miles for all LPFM applicants for proposed facilities in other than the top fifty urban markets, for both the distance from transmitter and residence of board member standards. We have revised the Form 318 to reflect this extension of local standards for rural markets. While the overall number of respondents increases because the Rule change expands the universe of eligible applicants, there are no new information collection requirements with respect to completion of the Form 318.

    In the Third Report and Order, the Commission also delegated to the Media Bureau the authority to consider Section 73.807 waiver requests from certain LPFM stations. When implementation of a full-service station community of license modification would result in an increase in interference caused to the LPFM station or its displacement, the LPFM station may seek a second-adjacent channel short spacing waiver in connection with an application proposing operations on a new channel. Such waiver requests would be filed on a Form 318.

    The Third Report and Order also allows LPFM stations to file waiver requests of Section 73.809 of the Rules if: (1) It is at risk of displacement by an encroaching full-service station modification application and no alternative channel is available, and (2) it can demonstrate that it has regularly provided at least eight hours per day of locally originated programming. LPFM stations that wish to make a showing under this waiver standard must file an informal objection to the “encroaching” community of license modification application.

    FCC Form 318 is required: (1) To apply for a construction permit for a new Low Power FM (LPFM) station; (2) to make changes in the existing facilities of such a station; or (3) to amend a pending FCC Form 318 application.

    Start Signature

    Federal Communications Commission.

    Marlene H. Dortch,

    Secretary.

    End Signature End Supplemental Information

    [FR Doc. E8-5835 Filed 3-20-08; 8:45 am]

    BILLING CODE 6712-01-P

Document Information

Published:
03/21/2008
Department:
Federal Communications Commission
Entry Type:
Notice
Document Number:
E8-5835
Dates:
Written PRA comments should be submitted on or before May 20, 2008. If you anticipate that you will be submitting comments but find it difficult to do so within the period of time allowed by this notice, you should advise the contact listed below as soon as possible.
Pages:
15156-15159 (4 pages)
EOCitation:
of 2008-03-13
PDF File:
e8-5835.pdf