94-6676. Orlando CoGen Limited, L.P.; Notice of Filing of Coal Capability; Powerplant and Industrial Fuel Use Act  

  • [Federal Register Volume 59, Number 55 (Tuesday, March 22, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-6676]
    
    
    [[Page Unknown]]
    
    [Federal Register: March 22, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Office of Fossil Energy
    [Docket No. FE C&E 94-3--Certification Notice--130]
    
     
    
    Orlando CoGen Limited, L.P.; Notice of Filing of Coal Capability; 
    Powerplant and Industrial Fuel Use Act
    
    AGENCY: Office of Fossil Energy, Department of Energy.
    
    ACTION: Notice of filing.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Orlando CoGen Limited, L.P. has submitted a coal capability 
    self-certification pursuant to section 201 of the Powerplant and 
    Industrial Fuel Use Act of 1978, as amended.
    
    ADDRESSES: Copies of self-certification filings are available for 
    public inspection, upon request, in the Office of Fuels Programs, 
    Fossil Energy, Room 3F-056, FE-52, Forrestal Building, 1000 
    Independence Avenue SW., Washington, DC 20585.
    
    FOR FURTHER INFORMATION CONTACT: Ellen Russell at (202) 586-9624.
    
    SUPPLEMENTARY INFORMATION: Title II of the Powerplant and Industrial 
    Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8301 et seq.), 
    provides that no new baseload electric powerplant may be constructed or 
    operated without the capability to use coal or another alternate fuel 
    as a primary energy source. In order to meet the requirement of coal 
    capability, the owner or operator of such facilities proposing to use 
    natural gas or petroleum as its primary energy source shall certify, 
    pursuant to FUA section 201(d), to the Secretary of Energy prior to 
    construction, or prior to operation as a base load powerplant, that 
    such powerplant has the capability to use coal or another alternate 
    fuel. Such certification establishes compliance with section 201(a) on 
    the day it is filed with the Secretary. The Secretary is required to 
    publish a notice in the Federal Register that a certification has been 
    filed. The following owner/operator of a proposed new baseload 
    powerplant has filed a self-certification in accordance with section 
    201(d).
    
    Owner: Orlando CoGen Limited, L.P.
    Operator: Air Products and Chemicals, Inc.
    Location: 8275 Exchange Drive, Orlando, Florida 32809
    Plant Configuration: Combined-cycle cogeneration
    Capacity: 122.7 megawatts
    Fuel: Natural gas
    Purchasing Utilities: Reedy Creek Utility District and Florida Power 
    Corporation
    In-service Date: *September 25, 1993
    
        *This self-certification was filed after the powerplant was 
    placed in service. The delay in filing arose entirely out of 
    inadvertence by the owner.
    
        Issued in Washington, DC, March 17, 1994.
    Anthony J. Como,
    Director, Office of Coal & Electricity, Office of Fuels Programs, 
    Office of Fossil Energy.
    [FR Doc. 94-6676 Filed 3-21-94; 8:45 am]
    BILLING CODE 6450-01-P
    
    
    

Document Information

Published:
03/22/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Action:
Notice of filing.
Document Number:
94-6676
Dates:
*September 25, 1993
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: March 22, 1994, Docket No. FE C&E 94-3--Certification Notice--130