98-7397. Notice of surrender of Exemption (Conduit)  

  • [Federal Register Volume 63, Number 55 (Monday, March 23, 1998)]
    [Notices]
    [Pages 13848-13849]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-7397]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of surrender of Exemption (Conduit)
    
    March 17, 1998.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: Surrender of Exemption (Conduit).
        b. Project No: 5890-003.
        c. Date Filed: January 22, 1998.
        d. Applicant: Whale Rock Commission.
        e. Name of Project: Whale Rock.
        f. Location: On Old Creek, in San Luis Obispo County, California.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Sec. 791(a)-
    825(r).
        h. Applicant Contact:
    
    Bob Hamilton,
    Water Supply Supervisor, Whale
    Rock Division,
    City of San Luis Obispo,
    955 Morro Street,
    San Luis Obispo, CA 93401,
    (805) 995-3701.
    
        i. FERC Contact: Regina Saizan, (202) 219-2673.
        j. Comment Date: April 27, 1998.
        k. Description of Proposed Action: The exemptee is requesting 
    surrender because the design of the facility has been changed to allow 
    power generation only infrequently and the project has not operated for 
    the past six years. The exemptee proposes to remove the six-inch supply 
    conduit and regulating valve, and install a blind flange on the supply 
    tap.
        l. This notice also consists of the following standard paragraphs: 
    B, C1, and D2.
        B. Comments, Protests, or Motions to Intervene--Anyone may submit 
    comments, a protest, or a motion to intervene in accordance with the 
    requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
    .214. In determining the appropriate action to take, the Commission 
    will consider all protests or other comments filed, but only those who 
    file a motion to intervene in accordance with the Commission's Rules 
    may become a party to the proceeding. Any comments, protests, or 
    motions to intervene must be received on or before the specified 
    comment date for the particular application.
        C1. Filing and Service of Responsive documents--Any filings must 
    bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
    FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as 
    applicable, and the Project Number of the particular application to 
    which the filing refers. Any of the above-named documents must be filed 
    by providing the original and the number of copies provided by the 
    Commission's regulations to: The Secretary, Federal Energy Regulatory 
    Commission, 888 First Street, N.E., Washington, D.C. 20426. A copy of 
    any motion to intervene must also be served upon each representative of 
    the Applicant specified in the particular application.
        D2. Agency Comments--Federal, state, and local agencies are invited 
    to file comments on the described application. A copy of the 
    application my be obtained by agencies directly from the Applicant. If 
    an agency does
    
    [[Page 13849]]
    
    not file comments within the time specified for filing comments, it 
    will be presumed to have no comments. One copy of an agency's comments 
    must also be sent to the Applicant's representatives.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-7397 Filed 3-20-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Effective Date:
4/27/1998
Published:
03/23/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
The exemptee is requesting surrender because the design of the facility has been changed to allow power generation only infrequently and the project has not operated for the past six years. The exemptee proposes to remove the six-inch supply conduit and regulating valve, and install a blind flange on the supply tap.
Document Number:
98-7397
Dates:
April 27, 1998.
Pages:
13848-13849 (2 pages)
PDF File:
98-7397.pdf