99-7024. St. George Field Office Approved Resource Management Plan and Record of Decision  

  • [Federal Register Volume 64, Number 55 (Tuesday, March 23, 1999)]
    [Notices]
    [Pages 14009-14010]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-7024]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF THE INTERIOR
    
    Bureau of Land Management
    [UT-040-99-1150-00]
    
    
    St. George Field Office Approved Resource Management Plan and 
    Record of Decision
    
    AGENCY: Bureau of Land Management, Interior.
    
    ACTION: Notice of availability.
    
    -----------------------------------------------------------------------
    
    SUMMARY: In accordance with the National Environmental Policy Act of 
    1969 (40 CFR 1550.2), and the Federal Land Policy and Management Act of 
    1976, the Department of the Interior, Bureau of Land Management (BLM), 
    St. George Field Office provides notice of the availability of the 
    approved Resource Management Plan (RMP) and Record of Decision (ROD) 
    for the St. George Field Office. The approved RMP/ROD was signed by the 
    Utah State Director on March 15, 1999. This approved RMP/ROD supersedes 
    the existing Virgin River Management Framework Plan and other related 
    documents for managing BLM-administered lands, with exception to some 
    off-highway vehicle, mountain bike, and other restrictions/closures 
    carried forth from past Federal Register notices. The St. George Field 
    Office is responsible for management of BLM-administered lands and 
    minerals in all of Washington County, Utah. This county encompasses the 
    southwestern corner of Utah. The St. George Field Office is 
    administratively responsible for 671,545 acres of surface and 
    subsurface lands.
    
    ADDRESSES: Copies of the approved RMP/ROD will be available upon 
    request at the end of April when they are delivered by the printing 
    contractor to the St. George Field Office. You may contact Lauren 
    Mermejo at the St. George Field Office if you would like a copy of this 
    document at: 345 East Riverside Drive, St. George, Utah, 84790. The 
    telephone number is (435) 688-3216.
    
    FOR FURTHER INFORMATION CONTACT: Jim Crisp, St. George Field Office 
    Manager, at the above address. He can be reached by telephone at (435) 
    688-3201.
    
    SUPPLEMENTARY INFORMATION: The St. George Field Office approved RMP/ROD 
    is essentially the same as the Dixie Proposed Resource Management Plan 
    and Final Environmental Impact Statement (PRMP/FEIS) that was completed 
    in September, 1995. (The name of the field office was changed from the 
    Dixie Resource Area to the St. George Field Office in early 1999; 
    however, the administrative boundaries remain the same.) The Federal 
    Register notice for the PRMP/DEIS was dated September 17, 1998, Volume 
    63, Number 180, Pages 49711-49712. No changes to the proposed decisions 
    have been made. However, some clarifying language has been included as 
    a result of the protest letters received on the PRMP/FEIS, as well as 
    internal corrections. Two new decisions that were added to the approved 
    RMP/ROD include (1) a decision to conduct activities within desert 
    tortoise habitat in accordance with the terms and conditions described 
    in the U. S. Fish and Wildlife Service Biological Opinion for the 
    Mojave desert tortoise (ES/6-UT-98-F-005, August 12, 1998), and (2) a 
    decision to continue to allow for low-impact motorcycle trials events 
    in the Pahcoon Gulch area, with specific constraints. The Director's 
    office has issued final decisions, dismissing or resolving, each of the 
    nineteen protests received, thus allowing for immediate implementation 
    of the approved RMP.
    
    Wild and Scenic Rivers
    
        Through this planning effort parts or all of the following five 
    river segments are recommended as suitable for congressional 
    designation: Deep Creek/Crystal Creek, North Fork of the Virgin River 
    above Zion National Park, Oak Creek/Kolob Creek, that portion of 
    LaVerkin Creek/Smith Creek from above Zion National Park to the north 
    boundary of the private parcel of Section 18, T. 40 S., R. 12 W., and 
    that portion of the Virgin River contained
    
    [[Page 14010]]
    
    wholly within the Beaver Dam Mountains Wilderness Area.
    
    Areas of Critical Environmental Concern (ACEC)
    
        The plan designates the following ten areas as ACECs: Red Bluff 
    (6,168 acres), Warner Ridge/Fort Pearce (4,281 acres), Santa Clara/
    Gunlock (1,998 acres), Santa Clara/Land Hill (1,645 acres), Lower 
    Virgin River (1,822 acres), Little Creek Mountain (19,302 acres), 
    Canaan Mountain (31,355 acres), Red Mountain (4,854 acres), Beaver Dam 
    Slope (48,519 acres), Upper Beaver Dam Wash (33,063 acres).
    
    Off-Highway Vehicle Designations
    
        The plan designates 91,704 acres closed to off-highway vehicle 
    (OHV) use; 448,066 acres as open for use by OHVs on existing or 
    designated roads and trails; and 89,235 acres as open for use by OHVs.
    Linda Colville,
    Acting State Director, Utah.
    [FR Doc. 99-7024 Filed 3-22-99; 8:45 am]
    BILLING CODE 4310-DQ-P
    
    
    

Document Information

Published:
03/23/1999
Department:
Land Management Bureau
Entry Type:
Notice
Action:
Notice of availability.
Document Number:
99-7024
Pages:
14009-14010 (2 pages)
Docket Numbers:
UT-040-99-1150-00
PDF File:
99-7024.pdf