E9-6171. Waterbury-Oxford Airport, Oxford, CT; FAA Approval of Noise Compatibility Program  

  • Start Preamble

    AGENCY:

    Federal Aviation Administration, DOT.

    ACTION:

    Notice.

    SUMMARY:

    The Federal Aviation Administration (FAA) announces its findings on the noise compatibility program submitted by the Connecticut Department of Transportation under the provisions of Title I of the Aviation Safety and Noise Abatement Act of 1979 (Pub. L. 96-193) and 14 CFR Part 150. These findings are made in recognition of the description of Federal and non-federal responsibilities in Senate Report No. 96-52 (1980). On November 6, 2008, the FAA determined that the noise exposure maps submitted by the Connecticut Department of Transportation under Part 150 were in compliance with applicable requirements. On January 14, 2009, the Manager, Airports Division, New England Region, approved the Waterbury-Oxford Airport noise compatibility program. All 12 of the proposed program elements were approved.

    DATES:

    Effective Date: The effective date of the FAA's approval of the Waterbury-Oxford Airport noise compatibility program is January 14, 2009.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Bryon Rakoff, Federal Aviation Administration, New England Region, Airports Division, 12 New England Executive Park, Burlington, Massachusetts 01803, Telephone (781) 238-7610.

    Documents reflecting this FAA action may be obtained from the same individual.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    This notice announces that the FAA has given its overall approval to the Waterbury-Oxford Airport noise compatibility program, effective January 14, 2009.

    Under Section 104(a) of the Aviation Safety and Noise Abatement Act of 1979 (hereinafter the Act), an airport operator who has previously submitted a noise exposure map may submit to the FAA a noise compatibility program which sets forth the measures taken or proposed by the airport operator for the reduction of existing non-compatible land uses and prevention of additional non-compatible land uses within the area covered by the noise exposure maps.

    The Act requires such programs to be developed in consultation with interested and affected parties including local communities, government agencies, airport users, and FAA personnel.

    Each airport noise compatibility program developed in accordance with Federal Aviation Regulation (FAR), Part 150 is a local program, not a federal program. The FAA does not substitute its judgment for that of the airport proprietor with respect to which measures should be recommended for action. The FAA's approval or disapproval of FAR Part 150 program recommendations is measured according to the standards expressed in Part 150 and the Act, and is limited to the following determinations:

    (a) The noise compatibility program was developed in accordance with the provisions and procedures of FAR Part 150;

    (b) Program measures are reasonably consistent with achieving the goals of reducing existing non-compatible land uses around the airport and preventing the introduction of additional non-compatible land uses;

    (c) Program measures would not create an undue burden on interstate or foreign commerce, unjustly discriminate against types or classes of aeronautical uses, violate the terms of airport grant agreements, or intrude into areas preempted by the federal government; and

    (d) Program measures relating to the use of flight procedures can be implemented within the period covered by the program without derogating safety, adversely affecting the efficient use and management of the navigable airspace and air traffic control systems, or adversely affecting other powers and responsibilities of the Administrator as prescribed by law.

    Specific limitations with respect to FAA's approval of an airport noise compatibility program are delineated in FAR Part 150, Section 150.5. Approval is not a determination concerning the acceptability of land uses under Federal, state, or local law. Approval does not by itself constitute a FAA implementing action. A request for Federal action or approval to implement specific noise compatibility measures may be required, and an FAA decision on the request may require an environmental assessment of the proposed action.

    Approval does not constitute a commitment by the FAA to financially assist in the implementation of the program nor a determination that all measures covered by the program are eligible for grant-in-aid funding from the FAA under the Airport and Airway Improvement Act of 1982. Where Federal funding is sought, requests for project grants must be submitted to the FAA Regional Office in Burlington, Massachusetts.

    The Connecticut Department of Transportation submitted to the FAA, on October 9, 2008, noise exposure maps, descriptions, and other documentation produced during the noise compatibility planning study conducted from September 2004 to October 2008. The Waterbury-Oxford Airport noise exposure maps were determined by FAA to be in compliance with applicable requirements on November 6, 2008. Notice of this determination was published in the Federal Register on December 1, 2008.

    The Waterbury-Oxford Airport study contains a proposed noise compatibility program comprised of actions designed for implementation by airport management and adjacent jurisdictions from the date of study completion to beyond the year 2012. The Connecticut Department of Transportation requested that the FAA evaluate and approve this material as a noise compatibility program as described in Section 104(b) of the Act.

    The FAA began its review of the program on November 6, 2008, and was required by a provision of the Act to approve or disapprove the program within 180 days (other than the use of Start Printed Page 12175new flight procedures for noise control). Failure to approve or disapprove such a program within the 180-day period shall be deemed to be an approval of such a program.

    The submitted program contained 12 proposed actions for noise mitigation on and off the airport. The FAA completed its review and determined that the procedural and substantive requirements of the Act and FAR Part 150 have been satisfied. The overall program, therefore, was approved by the Manager, Airports Division, New England Region effective January 14, 2009.

    All 12 of the proposed program elements were approved. The 12 program elements include noise abatement departure flight tracks, noise abatement departure profile, preferential runway use, coordination of proposed zoning changes, fair disclosure of real estate transactions, noise related subdivision regulatory review, voluntary residential property acquisition, voluntary sound insulation, establishment of a Noise Abatement Committee, development of a Web site for public outreach, publication of operational noise abatement measures in pilot guides, and provision for updates to the noise compatibility program measures and noise contours.

    FAA's determinations are set forth in detail in a Record of Approval signed by the Manager, Airports Division, New England Region on January 14, 2009. The Record of Approval, as well as other evaluation materials and the documents comprising the submittal, are available for review at the FAA office listed above and at the administrative offices of Waterbury-Oxford Airport, Oxford, CT.

    Start Signature

    Issued in Burlington, Massachusetts, on January 14, 2009.

    LaVerne F. Reid,

    Manager, Airports Division, New England Region.

    End Signature End Supplemental Information

    [FR Doc. E9-6171 Filed 3-20-09; 8:45 am]

    BILLING CODE 4910-13-P

Document Information

Published: