2015-06531. New Hampshire Hydro Associates; Rivermill Hydroelectric, Inc.; Notice of Transfer of Exemption  

  • Start Preamble

    1. By letter filed March 10, 2015, New Hampshire Hydro Associates informed the Commission that the exemption from licensing for the HDI Mascoma Dam Project, FERC No. 9403, originally issued September 21, 1988,[1] has been transferred to Rivermill Hydroelectric, Inc. The project is located on the Mascoma River in Grafton County, New Hampshire. The transfer of an exemption does not require Commission approval.

    2. Rivermill Hydroelectric, Inc. is now the exemptee of the HDI Mascoma Dam Project, FERC No. 9403. All correspondence should be forwarded to: Michael Hansen, Rivermill Hydroelectric, Inc., 44 Deer Ridge Drive, Barrington, NH 03825.

    Start Signature
    Start Printed Page 15199

    Dated: March 16, 2015.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    Footnotes

    1.  44 FERC ¶ 62,273, Order Granting Exemption from Licensing (5 MW or Less) (1988).

    Back to Citation

    [FR Doc. 2015-06531 Filed 3-20-15; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
03/23/2015
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2015-06531
Pages:
15198-15199 (2 pages)
Docket Numbers:
Project No. 9403-008
PDF File:
2015-06531.pdf