95-7247. NorAm Gas Transmission Co.; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 57 (Friday, March 24, 1995)]
[Notices]
[Page 15558]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-7247]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-258-000]
NorAm Gas Transmission Co.; Notice of Request Under Blanket
Authorization
March 20, 1995.
Take notice that on March 13, 1995, NorAm Gas Transmission Company
(NGT), 1600 Smith Street, Houston, Texas 77002, filed in Docket No.
CP95-258-000 a request pursuant to Sections 157.205 and 157.211 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and
157.211) under its blanket certificate issued in Docket Nos. CP82-384-
000 and CP82-384-001 to abandon certain facilities and construct
facilities in Louisiana, all as more fully set forth in the request
which is on file with the Commission and open to public inspection.
Specifically, NGT proposes to upgrade a meter station and regulator
on Line FM-43 in Lincoln Parish, Louisiana delivering gas to Arkla, a
Division of NorAm Energy Corporation (Arkla). NGT states that it
proposes to abandon an above-ground 1-inch meter station and regulator
and install a 2-inch L-Shape meter station and regulator at the request
of Arkla to increase deliveries to Arkla's Rural Extension No. 947 in
Ruston, Louisiana. NGT states that it will deliver approximately
281,200 MMBtu annually and 864 MMBtu per day on a peak day to Arkla.
NGT estimates that the cost of the construction of the facilities will
be $24,768. NGT states that Arkla has agreed to reimburse NGT for the
cost of this project.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214) a motion to intervene or notice of intervention and pursuant
to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR
157.205) a protest to the request. If no protest is filed within the
time allowed therefor, the proposed activity is deemed to be authorized
effective on the day after the time allowed for filing a protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to Section 7 of the Natural
Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-7247 Filed 3-23-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 03/24/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-7247
- Pages:
- 15558-15558 (1 pages)
- Docket Numbers:
- Docket No. CP95-258-000
- PDF File:
-
95-7247.pdf