95-7247. NorAm Gas Transmission Co.; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 60, Number 57 (Friday, March 24, 1995)]
    [Notices]
    [Page 15558]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-7247]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP95-258-000]
    
    
    NorAm Gas Transmission Co.; Notice of Request Under Blanket 
    Authorization
    
    March 20, 1995.
        Take notice that on March 13, 1995, NorAm Gas Transmission Company 
    (NGT), 1600 Smith Street, Houston, Texas 77002, filed in Docket No. 
    CP95-258-000 a request pursuant to Sections 157.205 and 157.211 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 
    157.211) under its blanket certificate issued in Docket Nos. CP82-384-
    000 and CP82-384-001 to abandon certain facilities and construct 
    facilities in Louisiana, all as more fully set forth in the request 
    which is on file with the Commission and open to public inspection.
        Specifically, NGT proposes to upgrade a meter station and regulator 
    on Line FM-43 in Lincoln Parish, Louisiana delivering gas to Arkla, a 
    Division of NorAm Energy Corporation (Arkla). NGT states that it 
    proposes to abandon an above-ground 1-inch meter station and regulator 
    and install a 2-inch L-Shape meter station and regulator at the request 
    of Arkla to increase deliveries to Arkla's Rural Extension No. 947 in 
    Ruston, Louisiana. NGT states that it will deliver approximately 
    281,200 MMBtu annually and 864 MMBtu per day on a peak day to Arkla. 
    NGT estimates that the cost of the construction of the facilities will 
    be $24,768. NGT states that Arkla has agreed to reimburse NGT for the 
    cost of this project.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.214) a motion to intervene or notice of intervention and pursuant 
    to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 
    157.205) a protest to the request. If no protest is filed within the 
    time allowed therefor, the proposed activity is deemed to be authorized 
    effective on the day after the time allowed for filing a protest. If a 
    protest is filed and not withdrawn within 30 days after the time 
    allowed for filing a protest, the instant request shall be treated as 
    an application for authorization pursuant to Section 7 of the Natural 
    Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-7247 Filed 3-23-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
03/24/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-7247
Pages:
15558-15558 (1 pages)
Docket Numbers:
Docket No. CP95-258-000
PDF File:
95-7247.pdf