95-7250. Notice of Application
[Federal Register Volume 60, Number 57 (Friday, March 24, 1995)]
[Notices]
[Pages 15556-15557]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-7250]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Project No. 11291-000]
Notice of Application
March 20, 1995.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
Notice of Application Tendered for Filing With the Commission
a. Type of Application: Minor License.
b. Project No.: 11291-001.
c. Date Filed: March 6, 1995.
d. Applicant: Star Mill, Inc.
e. Name of Project: Star Milling Project.
f. Location: On the Fawn River in Lima Township, LaGrange County,
Indiana.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Secs. 791(a)-
825(r).
h. Applicant Contact: Mr. Richard K. Muntz, 109 South Detroit
Street, LaGrange, Indiana 46761, (219) 463-2151.
i. FERC Contact: Charles T. Raabe (dt) (202) 219-2811.
j. Comment Date: Within 35 days of the date filed shown in paragraph
(c).
k. Description of Project: The existing operating project consists
of: (1) A 4-foot-high concrete and earthen dam; (2) a reservoir; (3)
a powerhouse containing a 187 KVa generating unit and a 125 KVa
generating unit; (4) a tailrace; and (5) appurtenant facilities.
1. With this notice, we are initiating consultation with the
STATE HISTORIC PRESERVATION OFFICER (SHPO), as required by Sec. 106,
National Historic Preservation Act, and the regulations of the
Advisory Council on Historic Preservation, 36 CFR 800.4.
m. Pursuant to Section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, SHPO, Indian Tribe, or person
believes that an additional scientific study should be conducted in
order to form an adequate factual basis for a complete analysis of
the application on its merits, the resource agency, SHPO, Indian
Tribe, or person must file a request for a study with the
Commission. We are waiving the Section 4.32(b)(7) required time to
respond to this notice and request that any request for studies be
provided no later than 35 days [[Page 15557]] from the filing date
and serve a copy of the request on the applicant.
Lois D. Cashell,
Secretary.
[FR Doc. 95-7250 Filed 3-23-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 03/24/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-7250
- Dates:
- Within 35 days of the date filed shown in paragraph (c). k. Description of Project: The existing operating project consists of: (1) A 4-foot-high concrete and earthen dam; (2) a reservoir; (3) a powerhouse containing a 187 KVa generating unit and a 125 KVa generating unit; (4) a tailrace; and (5) appurtenant facilities.
- Pages:
- 15556-15557 (2 pages)
- Docket Numbers:
- Project No. 11291-000
- PDF File:
-
95-7250.pdf