99-7129. Texas Eastern Transmission Corporation; Notice of Request Under Blanket Authorization
[Federal Register Volume 64, Number 56 (Wednesday, March 24, 1999)]
[Notices]
[Page 14227]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-7129]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-253-000]
Texas Eastern Transmission Corporation; Notice of Request Under
Blanket Authorization
March 18, 1999.
Take notice that on March 12, 1999, Texas Eastern Transmission
Corporation (Texas Eastern), 5400 Westheimer Court, Houston, Texas
77056-5310, filed in Docket No. CP99-253-000 a request pursuant to
Sections 157.205 and 157.211 of the Commission's Regulations under the
Natural Gas Act (18 CFR 157.205 and 157.211) for authorization to
construct and operate a delivery point in Monroe County, Mississippi so
that Texas Eastern may provide natural gas deliveries to the town of
Shannon, Mississippi under Texas Eastern's blanket certificate issued
in Docket No. CP82-535-000 pursuant to Section 7 of the Natural Gas
Act, all as more fully set forth in the request that is on file with
the Commission and open to public inspection. This filing may be viewed
on the web at http://www.ferc.fed.us/online/rims.htm (call 202-208-2222
for assistance).
Texas Eastern proposes to construct and install a single 2-inch tap
valve, a 2-inch check valve and a 2-inch insulating flange on Texas
Eastern's existing 6-inch Line No. 25-B, at approximately Mile Post
0.02, in Monroe County, Mississippi. Texas Eastern states that the town
of Shannon will install or cause to be installed dual 2-inch turbine
meter runs and associated piping and valves (meter station),
approximately 25 feet of 2-inch pipeline which will extend from the
meter station to the tap and gas measurement equipment. Texas Eastern
states that the Town of Shannon will reimburse Texas Eastern 100% of
the coast and expenses incurred to install the tap.
Texas Eastern states that its existing tariff does not prohibit the
addition of this facility, the delivery point will have no effect on
Texas Eastern's peak day or annual deliveries, and its proposal will be
accomplished without detriment or disadvantage to Texas Eastern's other
customers.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-7129 Filed 3-23-99; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 03/24/1999
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 99-7129
- Pages:
- 14227-14227 (1 pages)
- Docket Numbers:
- Docket No. CP99-253-000
- PDF File:
-
99-7129.pdf