96-7085. Georgia Power Company; Notice of Availability of Final Environmental Assessment
[Federal Register Volume 61, Number 58 (Monday, March 25, 1996)]
[Notices]
[Page 12071]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-7085]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Project No. 1951-037]
Georgia Power Company; Notice of Availability of Final
Environmental Assessment
March 19, 1996.
By letter to the Commission dated November 19, 1993, Georgia Power
Company proposed to prepare and file an environmental assessment with
their license application for the Sinclair Hydroelectric Project, as
provided for by the Energy Policy Act of 1992.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office
of Hydropower Licensing has reviewed the applicant prepared
environmental assessment and application for major license for the
existing Sinclair Hydroelectric Project, located on the Oconee River,
Baldwin County, Georgia, and has prepared a Final Environmental
Assessment (FEA) for the project. In the FEA, the Commission's staff
has analyzed the potential environmental impacts of the existing
project and has concluded that approval of the project, with
appropriate mitigation measures, would not constitute a major federal
action significantly affecting the quality of the human environment.
Copies of the FEA are available for review in the Public Reference
Branch, Room 2-A, of the Commission's offices at 888 First Street NE.,
Washington, DC 20426.
Lois D. Cashell,
Secretary.
[FR Doc. 96-7085 Filed 3-22-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 03/25/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-7085
- Pages:
- 12071-12071 (1 pages)
- Docket Numbers:
- Project No. 1951-037
- PDF File:
-
96-7085.pdf