97-7420. Sabine Pipe Line Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 62, Number 57 (Tuesday, March 25, 1997)]
[Notices]
[Page 14134]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-7420]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP97-290-000]
Sabine Pipe Line Company; Notice of Request Under Blanket
Authorization
March 19, 1997.
Take notice that on March 14, 1997, Sabine Pipe Line Company
(Sabine), P.O. Box 4781, Houston, Texas 77210-4781 filed in Docket No.
CP97-290-000 a request pursuant to Sections 157.205, and 157.211 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and
157.211) for approval and permission to use an existing receipt tap to
deliver natural gas to Tejas Gas Pipeline Company (Tejas) located in
Jefferson County, Texas, under the blanket certificate issued in Docket
No. CP83-199-000, pursuant to Section 7(c) of the Natural Gas Act
(NGA), all as more fully set forth in request which is on file with the
Commission and open to public inspection.
Sabine states that it proposes to operate the interconnection as
both a receipt tap to receive natural gas supplies for Sabine's
shippers and as a sales tap to deliver natural gas to Tejas or its
shippers. Sabine asserts that the maximum quantity of natural gas that
will be delivered through the interconnection is 100,000 MMcf per day,
subject to prevailing operating conditions. Sabine also asserts that
the delivery point will be available to all existing and potential
shippers receiving service under Sabine's FT-1 and IT-1 Rate Schedule
Schedules set forth in Sabine's FERC Gas Tariff.
Any person or the Commission's Staff may, within 45 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Rules of Practice and procedure (18 CFR
385.214), a motion to intervene or notice of intervention and pursuant
to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR
157.205), a protest to the request. If no protest is filed within the
time allowed therefor, the proposed activities shall be deemed to be
authorized effective the day after the time allowed for filing a
protest. If a protest is filed and notwithdrawn 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to Section 7 of the Natural
Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 97-7420 Filed 3-24-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 03/25/1997
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 97-7420
- Pages:
- 14134-14134 (1 pages)
- Docket Numbers:
- Docket No. CP97-290-000
- PDF File:
-
97-7420.pdf