E9-6666. Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, Eighth Coast Guard District has issued a temporary deviation from the regulation governing the operations of the Rock Island Railroad and Highway Drawbridge, Mile 482.9, Rock Island, Illinois across the Upper Mississippi River. This deviation allows the bridge to remain in the closed to navigation position from 7:30 a.m. until 11:30 a.m., September 27, 2009. The deviation is necessary as the drawbridge is part of the annual route for the Quad City Marathon.

    DATES:

    This temporary deviation is effective from 7:30 a.m. until 11:30 a.m., September 27, 2009.

    Documents indicated in this preamble as being available in the docket are part of docket USCG-2009-0157 and are available online at http://www.regulations.gov. They are also available for inspection or copying at two locations: the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays, and Commander, Eighth Coast Guard District, Room 2.107F in the Robert A. Young Federal Building, 1222 Spruce Street, St. Louis, MO 63103-2832, between 8 a.m. and 4 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Roger K. Wiebusch, Bridge Administrator, (314) 269-2378.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The U.S. Army Rock Island Arsenal requested a temporary deviation for the Rock Island Railroad and Highway Drawbridge, mile 482.9, at Rock Island, Illinois across the Upper Mississippi to remain in the closed to navigation position as the drawbridge is part of the Annual Quad City Marathon route. The Rock Island Railroad and Highway Drawbridge currently operates in accordance with 33 CFR 117.5, which states the general requirement that drawbridges shall open promptly and fully for the passage of vessels when a request to open is given in accordance with the subpart. In order to facilitate the annual event, the drawbridge must be kept in the closed-to-navigation position. This deviation allows the bridge to remain in the closed-to-navigation position for four hours from 7:30 a.m. until 11:30 a.m., September 27, 2009.

    There are no alternate routes for vessels transiting this section of the Upper Mississippi River.

    The Rock Island Railroad and Highway Drawbridge, in the closed-to-navigation position, provides a vertical clearance of 23.8 feet above normal pool. Navigation on the waterway consists primarily of commercial tows and recreational watercraft. This temporary deviation has been coordinated with waterway users. No objections were received.

    In accordance with 33 CFR 117.35(e), the drawbridge shall return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: March 10, 2009.

    Roger K. Wiebusch,

    Bridge Administrator.

    End Signature End Supplemental Information

    [FR Doc. E9-6666 Filed 3-24-09; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
9/27/2009
Published:
03/25/2009
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
E9-6666
Dates:
This temporary deviation is effective from 7:30 a.m. until 11:30 a.m., September 27, 2009.
Pages:
12553-12553 (1 pages)
Docket Numbers:
Docket No. USCG-2009-0156
RINs:
1625-AA09: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
PDF File:
e9-6666.pdf
CFR: (1)
33 CFR 117