2019-05601. Renewable Energy Aggregators; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
-
Start Preamble
On January 10, 2019, Renewable Energy Aggregators filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Big Rock Pumped Storage Hydro Project to be located in Big Rock in Buchanan County, Virginia. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A new upper reservoir with a surface area of 27 acres and a storage capacity of 404.97 acre-feet at a surface elevation of approximately 1,883 feet above mean sea level (msl) created through construction of a new roller-compacted concrete or rock-fill dam; (2) a new lower reservoir with a surface area of 9.13 acres and a storage capacity of 547.76 acre-feet at a surface elevation of 1,241 feet msl; (3) a new 2,053-foot-long, 4-foot-diameter penstock connecting the upper and lower reservoirs; (4) a new 150-foot-long, 50-foot-wide, 25-foot-high powerhouse containing as many as two turbine-generator units with a total rated capacity of 20 megawatts; (5) a new transmission line connecting the powerhouse to a nearby electric grid interconnection point with options to evaluate multiple grid interconnection locations; and (6) appurtenant facilities. The proposed project would have an annual generation of 86,449.37 megawatt-hours.Start Printed Page 11083
Applicant Contact: Adam Rousselle II, Renewable Energy Aggregators, 5710 Oak Crest Drive, Doylestown, PA 18902; phone: 215-485-1708.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P-14960-000.
More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of the Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-14960) in the docket number field to access the document. For assistance, contact FERC Online Support.
Start SignatureDated: March 19, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-05601 Filed 3-22-19; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 03/25/2019
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2019-05601
- Pages:
- 11082-11083 (2 pages)
- Docket Numbers:
- Project No. 14960-000
- PDF File:
- 2019-05601.pdf