2012-7130. Drawbridge Operation Regulations; Pequonnock River, Bridgeport, CT, Maintenance  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Metro North (Peck) Bridge across the Pequonnock River, mile 0.3, at Bridgeport, Connecticut. The deviation allows the bridge to remain in the closed position to facilitate miter rail repair.

    DATES:

    This deviation is effective from April 15, 2012 through June 30, 2012.

    Start Printed Page 17333

    ADDRESSES:

    Documents mentioned in this preamble as being available in the docket are part of docket USCG-2012-0153 and are available online at www.regulations.gov,, inserting USCG-2012-0153 in the “Keyword” and then clicking “Search”. They are also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this rule, call or email Ms. Judy Leung-Yee, Project Officer, First Coast Guard District, telephone (212) 668-7165, email judy.k.leung-yee@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Metro North (Peck) Bridge, across the Pequonnock River, mile 0.3, at Bridgeport, Connecticut, has a vertical clearance in the closed position of 26 feet at mean high water and 32 feet at mean low water. The drawbridge operation regulations are listed at 33 CFR 117.219(b).

    The operator of the bridge, Metro North Railroad, requested a temporary deviation from the regulations to facilitate scheduled bridge maintenance, miter rail repair, at the bridge.

    The waterway users are recreational vessels and commercial lobster boats. The Metro North (Peck) Bridge rarely opens for vessel traffic. The bridge has received no requests to open during the past three years except for bridge testing and repairs.

    Under this temporary deviation the Metro North (Peck) Bridge may remain in the closed position from April 15, 2012 through June 30, 2012. Vessels that can pass under the bridge in the closed position may do so at all times.

    The waterway users were advised of the requested bridge closure and offered no objection.

    In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: March 1, 2012.

    Gary Kassof,

    Bridge Program Manager, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2012-7130 Filed 3-23-12; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
4/15/2012
Published:
03/26/2012
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
2012-7130
Dates:
This deviation is effective from April 15, 2012 through June 30, 2012.
Pages:
17332-17333 (2 pages)
Docket Numbers:
Docket No. USCG-2012-0153
PDF File:
2012-7130.pdf
CFR: (1)
33 CFR 117