Start Preamble
Take notice that on March 8, 2013, Gulf South Pipeline Company, LP (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, and Petal Gas Storage, L.L.C. (Petal), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, (collectively, the Applicants) jointly filed an application pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA) for authorization for: (i) Gulf South to construct approximately 70 miles of new natural gas pipeline in Mississippi and Alabama; (ii) Gulf South to construct 34,215 horsepower of compression in Mississippi; (iii) Petal to abandon capacity by lease to Gulf South; and (iv) Gulf South to acquire that lease capacity (Southeast Market Expansion Project). The Applicants state that the Southeast Market Expansion Project will provide 510,500 dekatherms per day of firm transportation capacity. The Applicants estimate the total cost of the Southeast Market Expansion Project to be approximately $283,846,000, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application may be directed to J. Kyle Stephens, Vice President of Regulatory Affairs, Boardwalk Pipeline Partners, LP, 9 Greenway Plaza, Houston, Texas 77046, by facsimile at (713) 479-1846, or by email at kyle.stephens@bwpmlp.com.
On September 17, 2012, the Commission staff granted the Applicants' request to utilize the Pre-Filing Process and assigned Docket No. PF12-21-000 to staff activities involving the Southeast Market Expansion Project. Now as of the filing the March 8, 2013 application, the Pre-Filing Process for this project has ended. From this time forward, this proceeding will be conducted in Docket No. CP13-96-000, as noted in the caption of this Notice.
There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.
However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.
Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors Start Printed Page 18330will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and five copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.
This filing is accessible on-line at http://www.ferc.gov, using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: April 10, 2013.
Start SignatureDated: March 20, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-06834 Filed 3-25-13; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Effective Date:
- 4/10/2013
- Published:
- 03/26/2013
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2013-06834
- Dates:
- April 10, 2013.
- Pages:
- 18329-18330 (2 pages)
- Docket Numbers:
- Docket Nos. CP13-96-000, PF12-21-000
- PDF File:
- 2013-06834.pdf