98-7992. Supplementary to the Draft Environmental Impact Statement: Crawford and Perry Counties, IN
[Federal Register Volume 63, Number 59 (Friday, March 27, 1998)]
[Notices]
[Pages 14989-14990]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-7992]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Supplementary to the Draft Environmental Impact Statement:
Crawford and Perry Counties, IN
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: The Federal Highway Administration (FHWA) is issuing this
notice to advise the pubic that a Supplementary to the Draft
Environmental Impact Statement will be prepared for the proposed
construction of a new road section of State Road 145 from Interstate 64
near the town of St. Croix northward to the existing intersection of
State Road 145 and State Road 64 for an approximate distance of 8.3 to
9.6 miles depending on the alternate selected. The project is located
in the southern Indiana counties of Crawford and Perry. The Draft
Environmental Impact Statement was accepted by the FHWA on April 1,
1996 and was circulated for comments. The Supplement will better define
the purpose and need of the proposed action. Additionally, another
alternate will be discussed to fully cover the proposed improvement
area.
FOR FURTHER INFORMATION CONTACT: Mr. Douglas N. Head, Program
Operations Engineer, Federal Highway Administration, Federal Office
Building, 575 North Pennsylvania Street, Room 254, Indianapolis,
Indiana, 46204. Telephone (317) 226-5353.
SUPPLEMENTARY INFORMATION: The Federal Highway Administration, in
cooperation with the Indiana Dept of Transportation, will prepare a
supplement to the Draft Environmental Impact Statement on these
additional items covering the proposed State Road 145 and its
alternatives in Crawford and Perry counties. The discussions of
proposed alignments in the Draft Environmental Impact Statement are
still valid. The Supplement will provide a revised purpose and need of
the planned improvement as well as another alternate not discussed in
the Draft Environmental Impact Statement.
Since the additional alternate is being developed to consider all
feasible alternates, additional coordination will be done with
appropriate agencies. No formal scoping meetings are planned for these
alterations to the approved Draft Environmental Impact Statement. An
additional public hearing will be scheduled to discuss the additional
information being developed for the proposed action. The Supplemental
Draft Environmental Impact Statement will be made available for public
and agency review and comment.
To ensure that the full ranges of issues related to the proposed
action are addressed and all significant issues identified, comments
and suggestions are invited from all interested parties. Comments or
questions concerning this proposed action and the Supplemental EIS
should be directed to FHWA at the address provided above.
(Catalog of Federal Domestic Assistance Program No. 20.205, Highway
Research,
[[Page 14990]]
Planning and Construction. The regulations implementing Executive
Order 12372 regarding inter-governmental consultation on Federal
programs and activities apply to the program)
Douglas N. Head,
Program Operations Engineer, Indianapolis, Indiana.
[FR Doc. 98-7992 Filed 3-26-98; 8:45 am]
BILLING CODE 4910-22-M
Document Information
- Published:
- 03/27/1998
- Department:
- Federal Highway Administration
- Entry Type:
- Notice
- Action:
- Notice of intent.
- Document Number:
- 98-7992
- Pages:
- 14989-14990 (2 pages)
- PDF File:
-
98-7992.pdf