98-8009. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 59 (Friday, March 27, 1998)]
[Notices]
[Page 14913]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-8009]
[[Page 14913]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-290-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
March 23, 1998.
Take notice that on March 19, 1998, NorAm Gas Transmission Company
(NGT), 1111 Louisiana Street, Houston, Texas 77002, filed a request
with the Commission in Docket No. CP98-290-000, pursuant to Sections
157.205 and 157.211 of the Commission's Regulations under the Natural
Gas Act (NGA), for authorization to own and operate certain facilities
in Arkansas to deliver gas to Arkla, a distribution of NorAm Energy
Corporation authorized in blanket certificate issued in Docket Nos.
CP82-384-000 and CP82-384-001, all as more fully set forth in the
request on file with the Commission and open to public inspection.
NGT proposes to install a 1-inch delivery tap and meter station on
NGT's Line BT-14 in Conway County, Arkansas which would provide service
to Arkla's rural distribution system. The estimated volumes to be
delivered through the above facilities are 4,320 MMBtu annually and 11
MMBtu on a peak day. NGT's construction costs are estimated at $6,523.
NGT states that Arkla would reimburse NGT $5,603 of actual construction
costs.
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Section 157.205 of the
Regulations under the NGA (18 CFR 157.205) a protest to the request. If
no protest is filed within the allowed time, the proposed activity
shall be deemed to be authorized effective the day after the time
allowed for filing a protest. If a protest is filed and not withdrawn
within 30 days after the time allowed for filing a protest, the instant
request shall be treated as an application for authorization pursuant
to Section 7 of the NGA.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-8009 Filed 3-26-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 03/27/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-8009
- Pages:
- 14913-14913 (1 pages)
- Docket Numbers:
- Docket No. CP98-290-000
- PDF File:
-
98-8009.pdf