98-8009. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 59 (Friday, March 27, 1998)]
    [Notices]
    [Page 14913]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-8009]
    
    
    
    [[Page 14913]]
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-290-000]
    
    
    NorAm Gas Transmission Company; Notice of Request Under Blanket 
    Authorization
    
    March 23, 1998.
        Take notice that on March 19, 1998, NorAm Gas Transmission Company 
    (NGT), 1111 Louisiana Street, Houston, Texas 77002, filed a request 
    with the Commission in Docket No. CP98-290-000, pursuant to Sections 
    157.205 and 157.211 of the Commission's Regulations under the Natural 
    Gas Act (NGA), for authorization to own and operate certain facilities 
    in Arkansas to deliver gas to Arkla, a distribution of NorAm Energy 
    Corporation authorized in blanket certificate issued in Docket Nos. 
    CP82-384-000 and CP82-384-001, all as more fully set forth in the 
    request on file with the Commission and open to public inspection.
        NGT proposes to install a 1-inch delivery tap and meter station on 
    NGT's Line BT-14 in Conway County, Arkansas which would provide service 
    to Arkla's rural distribution system. The estimated volumes to be 
    delivered through the above facilities are 4,320 MMBtu annually and 11 
    MMBtu on a peak day. NGT's construction costs are estimated at $6,523. 
    NGT states that Arkla would reimburse NGT $5,603 of actual construction 
    costs.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-8009 Filed 3-26-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
03/27/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-8009
Pages:
14913-14913 (1 pages)
Docket Numbers:
Docket No. CP98-290-000
PDF File:
98-8009.pdf