-
Start Preamble
AGENCIES:
Department of Defense (DOD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).
ACTION:
Notice of request for an extension to an existing OMB clearance.
SUMMARY:
Under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the Federal Acquisition Regulation (FAR) Secretariat has submitted to the Office of Management and Budget (OMB) a request to review and approve an extension of a currently approved information collection requirement concerning bid/offer acceptance period. A request for public comments was published in the Federal Register at 67 FR 6234, on February 11, 2002. No comments were received.
Public comments are particularly invited on: Whether this collection of information is necessary for the proper performance of functions of the FAR, and whether it will have practical utility; whether our estimate of the public burden of this collection of information is accurate, and based on valid assumptions and methodology; ways to enhance the quality, utility, and clarity of the information to be collected; and ways in which we can minimize the burden of the collection of information on those who are to respond, through the use of appropriate technological collection techniques or other forms of information technology.
DATES:
Submit comments on or before April 26, 2002.
ADDRESSES:
Submit comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the General Services Start Printed Page 14704Administration, FAR Secretariat (MVP), 1800 F Street, NW., Room 4035, Washington, DC 20405. Please cite OMB Control No. 9000-0044, Bid/Offer Acceptance Period, in all correspondence.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ralph DeStefano, Acquisition Policy Division, GSA (202) 501-1758.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
A. Purpose
Bid acceptance period is the period of time from receipt of bids that is available to the Government to award the contract. This acceptance period is normally established by the Government. However, the bidder may establish a longer acceptance period than the minimum acceptance period set by the Government by providing a period of time in the blank. There are instances when the Government is unable to award a contract within the acceptance period due to unforeseen complications. Rather than incur the costly expense of readvertising, the Government requests the bidders to extend their bids for a longer period of time.
These data are placed with the respective bids and placed in the contract file to become a matter of record.
B. Annual Reporting Burden
Respondents: 308.
Responses Per Respondent: 40.
Annual Responses: 12,320.
Hours Per Response: .017.
Total Burden Hours: 209.
Obtaining Copies of Proposals: Requesters may obtain a copy of the information collection documents from the General Services Administration, FAR Secretariat (MVP), Room 4035, 1800 F Street, NW., Washington, DC 20405, telephone (202) 501-4755. Please cite OMB Control No. 9000-0044, Bid/Offer Acceptance Period, in all correspondence.
Start SignatureDated: March 19, 2002.
Al Matera,
Director, Acquisition Policy Division.
[FR Doc. 02-7337 Filed 3-26-02; 8:45 am]
BILLING CODE 6820-EP-P
Document Information
- Published:
- 03/27/2002
- Department:
- National Aeronautics and Space Administration
- Entry Type:
- Notice
- Action:
- Notice of request for an extension to an existing OMB clearance.
- Document Number:
- 02-7337
- Dates:
- Submit comments on or before April 26, 2002.
- Pages:
- 14703-14704 (2 pages)
- Docket Numbers:
- OMB Control No. 9000-0044
- PDF File:
- 02-7337.pdf