E7-5622. Proposed Agency Information Collection Activities; Comment Request  

  • Start Preamble

    AGENCY:

    Federal Railroad Administration, DOT.

    ACTION:

    Notice and request for comments.

    SUMMARY:

    In compliance with the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.), this notice announces that the Information Collection Requirements (ICRs) abstracted below have been forwarded to the Office of Management and Budget (OMB) for review and comment. The ICRs describes the nature of the information collections and their Start Printed Page 14639expected burdens. The Federal Register notice with a 60-day comment period soliciting comments on the following collections of information was published on January 17, 2007 (72 FR 2084).

    DATES:

    Comments must be submitted on or before April 27, 2007.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Robert Brogan, Office of Planning and Evaluation Division, RRS-21, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 25, Washington, DC 20590 (telephone: (202) 493-6292), or Ms. Gina Christodoulou, Office of Support Systems Staff, RAD-20, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 43, Washington, DC 20590 (telephone: (202) 493-6139). (These telephone numbers are not toll-free.)

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Paperwork Reduction Act of 1995 (PRA), Pub. L. No. 104-13, § 2, 109 Stat. 163 (1995) (codified as revised at 44 U.S.C. 3501-3520), and its implementing regulations, 5 CFR part 1320, require Federal agencies to issue two notices seeking public comment on information collection activities before OMB may approve paperwork packages. 44 U.S.C. 3506, 3507; 5 CFR 1320.5, 1320.8(d)(1), 1320.12. On January 17, 2007, FRA published a 60-day notice in the Federal Register soliciting comment on ICRs that the agency was seeking OMB approval. 72 FR 2084. FRA received no comments after issuing this notice. Accordingly, DOT announces that these information collection activities have been re-evaluated and certified under 5 CFR 1320.5(a) and forwarded to OMB for review and approval pursuant to 5 CFR 1320.12(c).

    Before OMB decides whether to approve these proposed collections of information, it must provide 30 days for public comment. 44 U.S.C. 3507(b); 5 CFR 1320.12(d). Federal law requires OMB to approve or disapprove paperwork packages between 30 and 60 days after the 30 day notice is published. 44 U.S.C. 3507(b)-(c); 5 CFR 1320.12(d); see also 60 FR 44978, 44983, Aug. 29, 1995. OMB believes that the 30 day notice informs the regulated community to file relevant comments and affords the agency adequate time to digest public comments before it renders a decision. 60 FR 44983, Aug. 29, 1995. Therefore, respondents should submit their respective comments to OMB within 30 days of publication to best ensure having their full effect. 5 CFR 1320.12(c); see also 60 FR 44983, Aug. 29, 1995.

    The summaries below describe the nature of the information collection requirements (ICRs) and the expected burden. The revised requirements are being submitted for clearance by OMB as required by the PRA.

    Title: Passenger Train Emergency Preparedness.

    OMB Control Number: 2130-0545.

    Type of Request: Extension of a currently approved collection.

    Affected Public: Railroads.

    Form(s): None.

    Abstract: The collection of information is due to the passenger train emergency regulations set forth in 49 CFR parts 223 and 239 which require railroads to meet minimum Federal standards for the preparation, adoption, and implementation of emergency preparedness plans connected with the operation of passenger trains, including freight railroads hosting operations of rail passenger service. The regulations require luminescent or lighted emergency markings so that passengers and emergency responders can readily determine where the closest and most accessible exit routes are located and how the emergency exit mechanisms are operated. Windows and doors intended for emergency access by responders for extrication of passengers must be marked with retro-reflective material so that emergency responders, particularly in conditions of poor visibility, can easily distinguish them from the less accessible doors and windows. Records of the inspection, maintenance, and repair of emergency windows and door exits, as well as records of operational efficiency tests, will be used to ensure compliance with the regulations.

    Annual Estimated Burden: 10,910 hours.

    Title: Designation of Qualified Persons.

    OMB Control Number: 2130-0511.

    Type of Request: Extension of a currently approved collection.

    Affected Public: Railroads.

    Form(s): None.

    Abstract: The collection of information is used to prevent the unsafe movement of defective freight cars. Railroads are required to inspect freight cars for compliance and to determine restrictions on the movements of defective cars. The collection of information is used by FRA to ensure that all freight car inspections are conducted by qualified persons who have demonstrated to their employing railroads a knowledge and ability to inspect freight cars for compliance with this Part, 49 CFR part 215.

    Annual Estimated Burden: 40 hours.

    Addressee: Send comments regarding these information collections to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 Seventeenth Street, NW., Washington, DC 20503, Attention: FRA Desk Officer.

    Comments are invited on the following: Whether the proposed collections of information are necessary for the proper performance of the functions of the Department, including whether the information will have practical utility; the accuracy of the Department's estimates of the burden of the proposed information collections; ways to enhance the quality, utility, and clarity of the information to be collected; and ways to minimize the burden of the collections of information on respondents, including the use of automated collection techniques or other forms of information technology.

    A comment to OMB is best assured of having its full effect if OMB receives it within 30 days of publication of this notice in the Federal Register.

    Start Authority

    Authority: 44 U.S.C. 3501-3520.

    End Authority Start Signature

    Issued in Washington, DC on March 22, 2007.

    D.J. Stadtler,

    Director, Office of Budget, Federal Railroad Administration.

    End Signature End Supplemental Information

    [FR Doc. E7-5622 Filed 3-27-07; 8:45 am]

    BILLING CODE 4910-06-P

Document Information

Published:
03/28/2007
Department:
Federal Railroad Administration
Entry Type:
Notice
Action:
Notice and request for comments.
Document Number:
E7-5622
Dates:
Comments must be submitted on or before April 27, 2007.
Pages:
14638-14639 (2 pages)
PDF File:
e7-5622.pdf