94-7327. Meeting With Industry on In-Service Inspection Performance Demonstration Requirements  

  • [Federal Register Volume 59, Number 60 (Tuesday, March 29, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-7327]
    
    
    [[Page Unknown]]
    
    [Federal Register: March 29, 1994]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
     
    
    Meeting With Industry on In-Service Inspection Performance 
    Demonstration Requirements
    
    agency: Nuclear Regulatory Commission.
    
    action: Notice of meeting.
    
    -----------------------------------------------------------------------
    
    summary: The staff of the Nuclear Regulatory Commission will meet with 
    representatives of the Nuclear Energy Institute (NEI), the Performance 
    Demonstration Initiative (PDI), and the utilities to discuss technical 
    issues related to performance demonstration requirements for in-service 
    inspection. The discussion will focus on plans by the PDI to submit 
    documentation of their program for NRC review. An additional discussion 
    item will be integration into the PDI program of the current 
    qualification requirements for inspectors looking for intergranular 
    stress corrosion cracking (IGSCC).
    
    dates: Wednesday, March 23, 1994.
    
    time: 9 a.m.-12 p.m.
    
    addresses: 11555 Rockville Pike, room 3-B13, Rockville, Maryland, 
    20852.
    
    for further information contact: Mr. Allen L. Hiser, Jr., Materials 
    Engineering Branch, Office of Nuclear Regulatory Research, Nuclear 
    Regulatory Commission, Washington, DC 20555. Telephone: (301) 492-3988.
    
    supplementary information: Recently the American Society of Mechanical 
    Engineers (ASME) has adopted Appendix VIII, entitled ``Performance 
    Demonstration for Ultrasonic Examination Systems,'' to Section XI of 
    the ASME Boiler and Pressure Vessel Code, and the NRC is preparing 
    rulemaking to endorse the performance demonstration requirements in the 
    regulations. In anticipation of the NRC endorsing those requirements, 
    the industry initiated the Performance Demonstration Initiative (PDI) 
    to provide compliance with Appendix VIII. At this meeting the industry 
    representatives will discuss their plans to submit documentation 
    concerning the PDI program to the NRC for review.
        In 1984, the NRC, the Electric Power Research Institute (EPRI), and 
    the Boiling Water Reactor Owners Group (BWROG) developed a coordination 
    plan for training and qualification activities of personnel employed in 
    the performance of examinations of BWR piping for intergranular stress 
    corrosion cracking (IGSCC). At this meeting, the industry 
    representatives will discuss integration of the coordination plan with 
    the PDI program.
    
        Dated at Rockville, Maryland, this 17th day of March 1994.
    
        For the Nuclear Regulatory Commission.
    Lawrence C. Shao,
    Director, Division of Engineering, Office of Nuclear Regulatory 
    Research.
    [FR Doc. 94-7327 Filed 3-28-94; 8:45 am]
    BILLING CODE 7590-01-M
    
    
    

Document Information

Published:
03/29/1994
Department:
Nuclear Regulatory Commission
Entry Type:
Uncategorized Document
Action:
Notice of meeting.
Document Number:
94-7327
Dates:
Wednesday, March 23, 1994.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: March 29, 1994