NUCLEAR REGULATORY COMMISSION
[Docket No. 50-440]
The Cleveland Electric Illuminating Company, et al.; Issuance of
Amendment to Facility Operating License
The U.S. Nuclear Regulatory Commission (Commission) has issued
Amendment No. 57 to Facility Operating License No. NPF-58 issued to The
Cleveland Electric Illuminating Company, et al. (the licensee), which
revised the Technical Specifications for operation of the Perry Nuclear
Power Plant, Unit 1 located in Lake County, Ohio. The amendment is
effective as of the date of issuance.
The amendment revised the Technical Specifications to increase the
limits on containment maximum average air temperature and normal
maximum average suppression pool water temperature, and reduced the
minimum allowable suppression pool water level (with the addition of an
appropriate correction factor). Additional changes to the Technical
Specifications included increasing the allowable upper containment pool
water temperature and reducing the allowable minimum upper containment
pool water level. Several editorial changes were also made.
The applications for the amendment comply with the standards and
requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations. The Commission has made
appropriate findings as required by the Act and the Commission's rules
and regulations in 10 CFR chapter I, which are set forth in the license
amendment.
Notice of Consideration of Issuance of Amendment and Opportunity
for Hearing in connection with part of this action was published in the
Federal Register on July 1, 1992 (57 FR 29337). A proposed no
significant hazards consideration determination was published in
connection with the rest of this action in the Federal Register on
March 3, 1993 (58 FR 12257). No request for a hearing or petition for
leave to intervene was filed following these notices.
The Commission has prepared an Environmental Assessment related to
the action and has determined not to prepare an environmental impact
statement. Based upon the environmental assessment, the Commission has
concluded that the issuance of this amendment will not have a
significant effect on the quality of the human environment (59 FR
12013).
For further details with respect to the action see: (1) The
application for amendment dated June 24, 1992, as supplemented by
letter dated September 25, 1992, and application for amendment dated
November 16, 1992, (2) Amendment No. 57 to License No. NPF-58, (3) the
Commission's related Safety Evaluation, and (4) the Commission's
Environmental Assessment. All of these items are available for public
inspection at the Commission's Public Document Room, the Gelman
Building, 2120 L Street NW., Washington, DC 20555, and at the local
public document room located at the Perry Public Library, 3753 Main
Street, Perry, Ohio 44081.
Dated at Rockville, Maryland, this 23rd day of March 1994.
For the Nuclear Regulatory Commission.
Jon B. Hopkins,
Senior Project Manager, Project Directorate III-3, Division of Reactor
Projects, Office of Nuclear Reactor Regulation.
[FR Doc. 94-7330 Filed 3-28-94; 8:45 am]