99-7546. ANR Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 64, Number 59 (Monday, March 29, 1999)]
    [Notices]
    [Page 14895]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-7546]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-260-000]
    
    
    ANR Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    March 22, 1999.
        Take notice that on March 16, 1999, ANR Pipeline Company (ANR), 500 
    Renaissance Center, Detroit, Michigan 48243, filed in Docket No. CP99-
    260-000 a request pursuant to Section 157.205 of the Commission's 
    Regulations under the Natural Gas Act (18 CFR 157.205) for 
    authorization to modify the metering facilities at an existing 
    interconnection with Southeastern Michigan Gas Company in St. Clair 
    County, Michigan, under ANR's blanket certificate issued in Docket No. 
    CP82-480-000 pursuant to Section 7 of the Natural Gas Act, all as more 
    fully set forth in the request which is on file with the Commission and 
    open to public inspection. This filing may be viewed on the web at 
    http://www.ferc.fed.us/online/rims.htm (call 202-208-2222 for 
    assistance).
        ANR proposes to construct and operate two additional 12-inch 
    turbine meters at its Greenwood Interconnection. ANR states that upon 
    completion of these reconfigured metering facilities, the total nominal 
    capacity of the Greenwood Interconnection would be increased from 
    approximately 200 MMcf/d to approximately 290 MMcf/d.
        ANR states further that the total cost of the modifications would 
    be approximately $360,000, for which ANR would be fully reimbursed.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefore, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-7546 Filed 3-26-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
03/29/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-7546
Pages:
14895-14895 (1 pages)
Docket Numbers:
Docket No. CP99-260-000
PDF File:
99-7546.pdf