[Federal Register Volume 64, Number 59 (Monday, March 29, 1999)]
[Notices]
[Page 14950]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-7599]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-482]
Wolf Creek Nuclear Operating Corporation; Notice of Issuance of
Amendment to Facility Operating License
The U.S. Nuclear Regulatory Commission (Commission) has issued
Amendment No. 122 to Facility Operating License No. NPF-42 issued to
the Wolf Creek Nuclear Operating Corporation (WCNOC or the licensee),
which revised the technical specifications for operation of the Wolf
Creek Generating Station (WCGS) located in Coffey County, Kansas.
The amendment is effective as of the date of issuance.
The amendment revises Technical Specification (TS) 4.7.3b., ``Plant
Systems--Component Cooling Water System--Surveillance Requirements,''
by deleting the requirement to perform the specified surveillances
during shutdown.
The application for the amendment complies with the standards and
requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations. The Commission has made
appropriate findings as required by the Act and the Commission's rules
and regulations in 10 CFR Chapter I, which are set forth in the license
amendment.
Notice of Consideration of Issuance of Amendment and Opportunity
for Hearing in connection with this action was published in the Federal
Register on October 5, 1998 (63 FR 53471), February 26, 1999 (64 FR
9546), and March 1, 1999 (64 FR 10028). No request for a hearing or
petition for leave to intervene was filed following these notices.
The Commission has prepared an Environmental Assessment related to
the action and has determined not to prepare an environmental impact
statement. Based upon the environmental assessment, the Commission has
concluded that the issuance of this amendment will not have a
significant effect on the quality of the human environment.
For further details with respect to the action see (1) the
application for amendment dated May 15, 1997, as supplemented by
letters dated June 30, August 5, August 28, September 24, October 16,
October 23, November 24, December 2, December 17, and December 21, 1998
and January 15, 1999, (2) Amendment No. 122 to Facility Operating
License No. NPF-42, and (3) the Commission's related Safety Evaluation
and Environmental Assessment. All of these items are available for
public inspection at the Commission's Public Document Room, the Gelman
Building, 2120 L Street, NW., Washington, DC, and at the local public
document rooms located at the Emporia State University, William Allen
White Library, 1200 Commercial Street, Emporia, Kansas 66801, and
Washburn University School of Law Library, Topeka, Kansas 66621. A copy
of items (2) and (3) may be obtained upon request addressed to the U.S.
Nuclear Regulatory Commission, Washington, D.C., 20555, Attention:
Director, Division of Licensing Project Management.
Dated at Rockville, Maryland, this 23rd day of March 1999.
For the Nuclear Regulatory Commission.
Kristine M. Thomas,
Project Manager, Project Directorate IV-2, Division of Licensing
Project Management, Office of Nuclear Reactor Regulation.
[FR Doc. 99-7599 Filed 3-26-99; 8:45 am]