2021-04392. Notice To Resume the Preparation of a Final Environmental Impact Statement for the Construction and Operations Plan for Vineyard Wind LLC  

  • Start Preamble

    AGENCY:

    Bureau of Ocean Energy Management, Interior.

    ACTION:

    Notice to resume the preparation of a final environmental impact statement.

    SUMMARY:

    The Bureau of Ocean Energy Management (BOEM) is resuming the preparation of a final environmental impact statement (FEIS) for the Construction and Operations Plan (COP) submitted by Vineyard Wind LLC (Vineyard Wind) concerning the construction and operation of an 800-megawatt wind energy facility offshore Massachusetts (Vineyard Wind 1 Project or Project).

    DATES:

    Preparation of the FEIS resumed after BOEM completed its independent review of information provided in Vineyard Wind's January 22, 2021, letter.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    For further information, please contact: Michelle Morin, BOEM, Office of Renewable Energy Programs, 45600 Woodland Road, Sterling, Virginia 20166, (703) 787-1722 or michelle.morin@boem.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    In December 2017, Vineyard Wind submitted a COP to BOEM for the Vineyard Wind 1 Project. On December 7, 2018, BOEM published a draft EIS for the proposed Project in accordance with the National Environmental Policy Act (NEPA), as amended (42 U.S.C. 4321 et seq.). On June 12, 2020, BOEM published a supplement to the draft EIS in response to requests from the public, Federal agencies, and stakeholders for an expanded cumulative analysis and an analysis of fishing data previously unavailable to BOEM. On December 1, 2020, Vineyard Wind withdrew the COP “from further review and decision-making by BOEM pursuant to 30 CFR 585.628” to conduct additional technical and logistical reviews associated with the inclusion of the General Electric Haliade-X wind turbine generator in the final project design. In its letter, Vineyard Wind stated that it required additional time to review updated project parameters to confirm that the parameters fell within the project design envelope previously reviewed during the BOEM NEPA analysis.Start Printed Page 12495

    In response to Vineyard Wind's December 1, 2020, letter, BOEM published a Federal Register notice on December 16, 2020, informing the public that “preparation of an Environmental Impact Statement” for the COP was “no longer necessary” for the sole reason that “the COP ha[d] been withdrawn from review and decisionmaking.” See 85 FR 81486 (Dec. 16, 2020). Accordingly, BOEM “terminated” the “preparation and completion” of the EIS. Id.

    On January 22, 2021, Vineyard Wind notified BOEM via letter that it had completed its technical and logistical due diligence review and had concluded that inclusion of the Haliade-X turbines did not warrant any modifications to the COP. Vineyard Wind therefore informed BOEM that it was rescinding its temporary withdrawal and asked BOEM to resume its review of the COP. Because Vineyard Wind has indicated that its proposed COP is “a decision pending before BOEM,” BOEM is resuming its review of the COP under NEPA. Id. Vineyard Wind's COP and BOEM's draft and supplemental EISs can be found at: https://www.boem.gov/​vineyard-wind.

    Start Authority

    Authority: This notice was prepared under NEPA (42 U.S.C. 4321 et seq.) and is published in accordance with Council on Environmental Quality regulations (40 CFR parts 1500-508).

    End Authority Start Signature

    William Y. Brown,

    Chief Environmental Officer, Bureau of Ocean Energy Management.

    End Signature End Supplemental Information

    [FR Doc. 2021-04392 Filed 3-2-21; 8:45 am]

    BILLING CODE 4310-MR-P

Document Information

Published:
03/03/2021
Department:
Ocean Energy Management Bureau
Entry Type:
Notice
Action:
Notice to resume the preparation of a final environmental impact statement.
Document Number:
2021-04392
Dates:
Preparation of the FEIS resumed after BOEM completed its independent review of information provided in Vineyard Wind's January 22, 2021, letter.
Pages:
12494-12495 (2 pages)
PDF File:
2021-04392.pdf
Supporting Documents:
» Gulf of Mexico Outer Continental Shelf Region-wide Oil and Gas Lease Sale 257
» Oil and Gas Lease Sales: Gulf of Mexico Outer Continental Shelf Oil and Gas Region-wide Lease Sale 251
» Oil and Gas Lease Sales: Gulf of Mexico Outer Continental Shelf
» Environmental Impact Statements; Availability, etc.: Outer Continental Shelf, Gulf of Mexico, Oil and Gas Central Planning Area Lease Sales 241 and 247 and Eastern Planning Area Lease Sale 226
» Oil and Gas Lease Sales: Gulf of Mexico, Outer Continental Shelf, Central Planning Area
» Environmental Impact Statements; Availability, etc.: Outer Continental Shelf, Alaska OCS Region, Chukchi Sea Planning Area, Oil and Gas Lease Sale 193
» Request for Information: Long Term Monitoring Plan for Marine Mammals; Gulf of Mexico
» Oil and Gas Lease Sales: Gulf of Mexico, Outer Continental Shelf Western Planning Area
» Oil and Gas Lease Sales: Western Gulf of Mexico Planning Area, Outer Continental Shelf; 238
» Agency Information Collection Activities; Proposals, Submissions, and Approvals: Social Indicators in Coastal Alaska: Arctic Communities Survey