99-7694. Midcoast Interstate Transmission, Inc.; Notice of Request for Authorization Under Blanket Certificate
[Federal Register Volume 64, Number 60 (Tuesday, March 30, 1999)]
[Notices]
[Page 15156]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-7694]
[[Page 15156]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-263-000]
Midcoast Interstate Transmission, Inc.; Notice of Request for
Authorization Under Blanket Certificate
March 24, 1999.
Take notice that on March 19, 1999, Midcoast Interstate
Transmission, Inc. (Midcoast), 3230 Second Street, Muscle Shoals,
Alabama 355661, filed in FERC Docket No. CP99-263-000 a request
pursuant to Sections 157.205 and 157.211, of the Commission's
Regulations under the Natural Gas Act (18 CFR 157.205 and 157.211) for
authorization to install and operate a new delivery point under
Midcoast's blanket certificate issued in Docket No. CP85-359-000
pursuant to Section 7 of the Natural Gas Act, all as more fully set
forth in the request that is on file with the Commission and open to
public inspection. The application may be viewed on the web at
www.ferc.fed.us. Call (202) 208-2222 for assistance.
Midcoast proposes to install and operate the facilities to
accommodate natural gas deliveries to Alventia LLC (Alventia), a
Delaware Limited Liability Corporation, at a plant being constructed in
Morgan County, Alabama. Transportation service for Alventia will be
provided pursuant to Rate Schedule FT of Midcoast's FERC Gas Tariff,
Second Revised Volume No. 1. Midcoast states that Alventia acquired FT
capacity on its system by a pre-arranged capacity release. Midcoast
also states that its existing tariff does not prohibit the additional
service.
Any person or the Commission's Staff may, within 45 days after
issuance of the instant notice by the commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed in the time allowed, the proposed
activity shall be deemed to be authorized affective the day after the
time allowed for filing a protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boergers,
Secretary.
[FR Doc. 99-7694 Filed 3-29-99; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 03/30/1999
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 99-7694
- Pages:
- 15156-15156 (1 pages)
- Docket Numbers:
- Docket No. CP99-263-000
- PDF File:
-
99-7694.pdf