2018-06367. Air Plan Approval; Alabama; Update to Materials Incorporated by Reference  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule; notification of administrative change.

    SUMMARY:

    The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the Alabama state implementation plan (SIP). The regulations affected by this update have been previously submitted by Alabama and approved by EPA. This update affects the materials that are available for public inspection at the National Archives and Records Administration (NARA) and the EPA Regional Office.

    DATES:

    This action is effective March 30, 2018.

    ADDRESSES:

    SIP materials which are incorporated by reference into 40 CFR part 52 are available for inspection at the following locations: Environmental Protection Agency, Region 4, 61 Forsyth Street SW, Atlanta, GA 30303; and the National Archives and Records Administration. For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/​federal-register/​cfr/​ibr-locations.html. To view the materials at the Region 4 Office, EPA request that you email the contact listed in the FOR FURTHER INFORMATION CONTACT section.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Sean Lakeman, Air Regulatory Management Section, Air Planning and Implementation Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW, Atlanta, Georgia 30303-8960. Mr. Lakeman can be reached via telephone at (404) 562-9043 or via electronic mail at lakeman.sean@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    Each state has a SIP containing the control measures and strategies used to attain and maintain the national ambient air quality standards (NAAQS). The SIP is extensive, containing such elements as air pollution control regulations, emission inventories, monitoring networks, attainment demonstrations, and enforcement mechanisms.

    Each state must formally adopt the control measures and strategies in the SIP after the public has had an opportunity to comment on them and then submit the proposed SIP revisions to EPA. Once these control measures and strategies are approved by EPA, after notice and comment, they are incorporated into the federally-approved SIP and are identified in part 52 “Approval and Promulgation of Implementation Plans,” Title 40 of the Code of Federal Regulations (40 CFR part 52). The full text of the state regulation approved by EPA is not reproduced in its entirety in 40 CFR part 52, but is “incorporated by reference.” This means that EPA has approved a given state regulation with a specific effective date. The public is referred to the location of the full text version should they want to know which measures are contained in a given SIP. The information provided allows EPA and the public to monitor the extent to which a state implements a SIP to attain and maintain the NAAQS and to take enforcement action if necessary.

    The SIP is a living document which the state can revise as necessary to address the unique air pollution problems in the state. Therefore, EPA from time to time must take action on proposed revisions containing new and/or revised state regulations. A submission from a state can revise one or more rules in their entirety or portions of rules, or even change a single word. The state indicates the changes in the submission (such as, by using redline/strikethrough) and EPA then takes action on the requested changes. EPA establishes a docket for its actions using a unique Docket Identification Number. which is listed in each action. These dockets and the complete submission are available for viewing on www.regulations.gov.

    On May 22, 1997, (62 FR 27968), EPA revised the procedures for incorporating by reference, into the Code of Federal Regulations, materials approved by EPA into each state SIP. These changes revised the format for the identification of the SIP in 40 CFR part 52, streamlined the mechanisms for announcing EPA approval of revisions to a SIP, and streamlined the mechanisms for EPA's updating of the IBR information contained for each SIP in 40 CFR part 52. The revised procedures also called for EPA to maintain “SIP Compilations” that contain the federally-approved regulations and source specific permits submitted by each state agency. These SIP Compilations are contained in 3-ring binders and are updated primarily on an annual basis. Under the revised procedures, EPA must periodically publish an informational document in the rules section of the Federal Register notifying the public that updates have been made to a SIP Compilation for a particular state. EPA applied the 1997 revised procedures to Alabama on December 22, 1998 (63 FR 70669).

    II. EPA Action

    This action represents EPA's publication of the Alabama SIP Compilation update, appearing in 40 CFR part 52: specifically, the materials of paragraphs (c) and (d) at 40 CFR 52. In addition, notice is provided of the following corrections to paragraph (c) of section 52.50, as described below:

    A. Under the “State effective date” and “EPA approval date” changing the 2-digit year to reflect a 4-digit year (for consistency) and correcting numerous Federal Registe r citations to reflect the Start Printed Page 13659first page of the preamble as opposed to the regulatory text page.

    B. Section 335-3-1-.05: revising entry to read “Sampling and Testing Methods.”

    C. Section 335-3-3-.01: State effective date is revised to read “1/22/2008” and EPA approval date is revised to read “9/15/2008; 73 FR 53134.”

    D. Section 335-3-4-.01: State effective date is revised to read “9/30/2008” and EPA approval date is revised to read “10/15/2008; 73 FR 60957.”

    E. Section 335-3-4-.16: entry is removed from the table because the rule was reserved.

    F. Section 335-3-5-.10: revising entry to read “TR SO2 Trading Program—computation of Time.

    G. Section 335-3-5-.20: entry is removed from the table because the rule was reserved.

    H. Section 335-3-5-.30: entry is removed from the table because the rule was reserved.

    I. Section 335-3-6-.02: State effective date is revised to read “4/15/1987” and EPA approval date is revised to read “9/27/1993; 58 FR 50262.”

    J. Section 335-3-6-.03: State effective date is revised to read “4/15/1987” and EPA approval date is revised to read “9/27/1993; 58 FR 50262.”

    K. Section 335-3-6-.19: entry is removed from the table because the rule was reserved.

    L. Section 335-3-6-.26: State effective date is revised to read “4/15/1987” and EPA approval date is revised to read “9/27/1993; 58 FR 50262.”

    M. Section 335-3-6-.31: State effective date is revised to read “4/15/1987” and EPA approval date is revised to read “9/27/1993; 58 FR 50262.”

    N. Section 335-3-6-.33: State effective date is revised to read “10/15/1996” and EPA approval date is revised to read “6/6/1997; 62 FR 30991.”

    O. Section 335-3-6-.35: State effective date is revised to read “4/15/1987” and EPA approval date is revised to read “9/27/1993; 58 FR 50262.”

    P. Section 335-3-6-.40: entry is removed from the table because the rule was reserved.

    Q. Section 335-3-6-.43: State effective date is revised to read “10/15/1996” and EPA approval date is revised to read “6/6/1997; 62 FR 30991.”

    R. Section 335-3-6-.49: State effective date is revised to read “10/15/1996” and EPA approval date is revised to read “6/6/1997; 62 FR 30991.”

    S. Section 335-3-6-.53: State effective date is revised to read “10/15/1996” and EPA approval date is revised to read “6/6/1997; 62 FR 30991.”

    T. Section 335-3-8-.04: Title/subject is changed to remove the word “(Reserved)”.

    U. Section 335-3-8-.15: entry is removed from the table because the rule was reserved.

    V. Section 335-3-8-.19: removing the explanation because EPA inadvertently inserted this explanation in its August 31, 2016 (81 FR 59869) approval of this section. There is only one section of 335-3-8-.19 in the approved SIP.

    W. Section 335-3-8-.22: entry is removed from the table because the rule was reserved.

    X. Section 335-3-8-.47: entry is removed from the table because the rule was reserved.

    Y. Section 335-3-8-.54: entry is removed from the table because the rule was reserved.

    Z. Section 335-3-8-.64: entry is removed from the table because the rule was reserved.

    AA. Section 335-3-14-.04: revising entry to read “Air Permits Authorizing Construction in Clean Air Areas (Prevention of Significant Deterioration (PSD))

    BB. Chapter 335-3-20 heading and Sections 335-3-20-.01 through 335-3-20-.03: entries are removed from the table because the rule was reserved.

    III. Good Cause Exemption

    EPA has determined that this action falls under the “good cause” exemption in section 553(b)(3)(B) of the Administrative Procedure Act (APA) which, upon finding “good cause,” authorizes agencies to dispense with public participation and section 553(d)(3) which allows an agency to make an action effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA). This administrative action simply codifies provisions which are already in effect as a matter of law in Federal and approved state programs and corrects typographical errors appearing in the CFR. Under section 553(b)(3)(B) of the APA, an agency may find good cause where procedures are “impracticable, unnecessary, or contrary to the public interest.” Public comment for this administrative action is “unnecessary” and “contrary to the public interest” since the codification (and typographical corrections) only reflect existing law. Immediate notice of this action in the Federal Register benefits the public by providing the public notice of the updated Alabama SIP Compilation and notice of typographical corrections to the Alabama “Identification of Plan” portion of the Federal Register. Further, pursuant to section 553(d)(3), making this action immediately effective benefits the public by immediately updating both the SIP compilation and the CFR “Identification of plan” section (which includes table entry corrections).

    IV. Incorporation by Reference

    In this rule, EPA is finalizing regulatory text that includes incorporation by reference. In accordance with requirements of 1 CFR 51.5, EPA is finalizing the incorporation by reference of previously EPA-approved regulations promulgated by Alabama and federally effective prior to October 1, 2017. EPA has made, and will continue to make, these materials generally available through www.regulations.gov and at the EPA Region 4 Office (please contact the person identified in the FOR FURTHER INFORMATION CONTACT section of this preamble for more information).

    V. Statutory and Executive Order Reviews:

    Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable federal regulations. See 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this notification of administrative change does not impose additional requirements beyond those imposed by state law. For that reason, this action:

    • Is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
    • does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
    • is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
    • does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
    • does not have Federalism implications as specified in Executive Start Printed Page 13660Order 13132 (64 FR 43255, August 10, 1999);
    • is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
    • is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
    • is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and
    • does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

    The SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it impose substantial direct costs on tribal governments or preempt tribal law.

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    EPA also believes that the provisions of section 307(b)(1) of the CAA pertaining to petitions for judicial review are not applicable to this action. This is because prior EPA rulemaking actions for each individual component of the Alabama SIP compilations previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA believes judicial review of this action under section 307(b)(1) of the CAA is not available.

    Start List of Subjects

    List of Subjects in 40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Carbon monoxide
    • Incorporation by reference
    • Intergovernmental relations
    • Lead
    • Nitrogen dioxide
    • Ozone
    • Particulate matter
    • Reporting and recordkeeping requirements
    • Sulfur oxides
    • Volatile organic compounds
    End List of Subjects Start Signature

    Dated: January 29, 2018.

    Onis “Trey” Glenn, III,

    Regional Administrator, Region 4.

    End Signature

    40 CFR part 52 is amended as follows:

    Start Part

    PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

    End Part Start Amendment Part

    1. The authority citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401 et seq.

    End Authority

    Subpart B—Alabama

    Start Amendment Part

    2. In § 52.50, paragraphs (b), (c) and (d) are revised to read as follows:

    End Amendment Part
    Identification of plan.
    * * * * *

    (b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to October 1, 2017, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after October 1, 2017, will be incorporated by reference in the next update to the SIP compilation.

    (2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1).

    (3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may inspect the material with an EPA approval date prior to October 1, 2017, for Alabama at the National Archives and Records Administration. For information on the availability of this material at NARA go to: http://www.archives.gov/​federal-register/​cfr/​ibr-locations.html.

    (c) EPA Approved Alabama Regulations.

    EPA-Approved Alabama Regulations

    State citationTitle/subjectState effective dateEPA approval dateExplanation
    Chapter No. 335-3-1 General Provision
    Section 335-3-1-.01Purpose6/22/19893/19/1990; 55 FR 10062
    Section 335-3-1-.02Definitions5/19/201710/13/2017, 82 FR 47631
    Section 335-3-1-.03Ambient Air Quality Standards10/13/19983/01/1999; 64 FR 9918
    Section 335-3-1-.04Monitoring, Records, and Reporting10/15/19966/06/1997; 62 FR 30991
    Section 335-3-1-.05Sampling and Testing Methods6/22/19893/19/1990; 55 FR 10062
    Section 335-3-1-.06Compliance Schedule10/15/19966/06/1997; 62 FR 30991
    Section 335-3-1-.07Maintenance and Malfunctioning of Equipment; Reporting10/15/19893/19/1990; 55 FR 10062
    Section 335-3-1-.08Prohibition of Air Pollution8/10/200012/8/2000; 65 FR 76938
    Section 335-3-1-.09Variances10/15/19966/6/1997; 62 FR 30991
    Section 335-3-1-.10Circumvention6/22/19893/19/1990; 55 FR 10062
    Section 335-3-1-.11Severability10/15/19966/6/1997; 62 FR 30991
    Section 335-3-1-.12Bubble Provision6/22/19893/19/1990; 55 FR 10062
    Section 335-3-1-.13Credible Evidence4/13/199911/3/1999; 64 FR 59633
    Start Printed Page 13661
    Section 335-3-1-.14Emissions Reporting Requirements Relating to Budgets for NOX Emissions4/6/20017/16/2001; 66 FR 36921
    Section 335-3-1-.15Emissions Inventory Reporting Requirements4/3/20034/24/2003; 68 FR 20077
    Chapter No. 335-3-2 Air Pollution Emergency
    Section 335-3-2-.01Air Pollution Emergency6/22/19893/19/1990; 55 FR 10062
    Section 335-3-2-.02Episode Criteria8/10/200012/8/2000; 65 FR 76940
    Section 335-3-2-.03Special Episode Criteria6/22/19893/19/1990; 55 FR 10062
    Section 335-3-2-.04Emission Reduction Plans6/22/19893/19/1990; 55 FR 10062
    Section 335-3-2-.05Two Contaminant Episode6/22/19893/19/1990; 55 FR 10062
    Section 335-3-2-.06General Episodes6/22/19893/19/1990; 55 FR 10062
    Section 335-3-2-.07Local Episodes6/22/19893/19/1990; 55 FR 10062
    Section 335-3-2-.08Other Sources10/15/19966/6/1997; 62 FR 30991
    Section 335-3-2-.09Other Authority Not Affected6/22/19893/19/1990; 55 FR 10062
    Chapter No. 335-3-3 Control of Open Burning and Incineration
    Section 335-3-3-.01Open Burning1/22/20089/15/2008; 73 FR 53134
    Section 335-3-3-.02Incinerators6/22/19893/19/1990; 55 FR 10062
    Section 335-3-3-.03Incineration of Wood, Peanut, and Cotton Ginning Waste8/10/200012/8/2000; 65 FR 76938
    Chapter No. 335-3-4 Control of Particulate Emissions
    Section 335-3-4-.01Visible Emissions9/30/200810/15/2008; 73 FR 60957
    Section 335-3-4-.02Fugitive Dust and Fugitive Emissions10/15/19966/6/1997; 62 FR 30991
    Section 335-3-4-.03Fuel Burning Equipment10/15/19966/6/1997; 62 FR 30991
    Section 335-3-4-.04Process Industries—General10/15/19966/6/1997; 62 FR 30991
    Section 335-3-4-.05Small Foundry Cupola6/22/19893/19/1990; 55 FR 10062
    Section 335-3-4-.06Cotton Gins6/22/19893/19/1990; 55 FR 10062
    Section 335-3-4-.07Kraft Pulp Mills10/15/19966/6/1997; 62 FR 30991
    Section 335-3-4-.08Wood Waste Boilers6/9/201710/13/2017; 82 FR 47631
    Section 335-3-4-.09Coke Ovens8/10/200012/8/2000; 65 FR 76940
    Section 335-3-4-.10Primary Aluminum Plants6/22/19893/19/1990; 55 FR 10062
    Section 335-3-4-.11Cement Plants10/15/19966/6/1997; 62 FR 30991
    Section 335-3-4-.12Xylene Oxidation Process6/22/19893/19/1990; 55 FR 10062
    Section 335-3-4-.13Sintering Plants6/22/19893/19/1990; 55 FR 10062
    Section 335-3-4-.14Grain Elevators10/15/19966/6/1997; 62 FR 30991
    Section 335-3-4-.15Secondary Lead Smelters10/15/19966/6/1997; 62 FR 30991
    Section 335-3-4-.17Steel Mills Located in Etowah County10/15/19966/6/1997; 62 FR 30991
    Chapter No. 335-3-5 Control of Sulfur Compound Emissions
    Section 335-3-5-.01Fuel Combustions10/15/19966/6/1997; 62 FR 30991
    Section 335-3-5-.02Sulfuric Acid Plants10/15/19966/6/1997; 62 FR 30991
    Section 335-3-5-.03Petroleum Production8/10/200012/8/2000; 65 FR 76938
    Section 335-3-5-.04Kraft Pulp Mills8/10/200012/8/2000; 65 FR 76938
    Section 335-3-5-.05Process Industries—General6/22/19893/19/1990; 55 FR 10062
    Section 335-3-5-.06State Clean Air Interstate Rule (CAIR) SO2 Trading Program General Provisions4/3/200710/1/2007; 72 FR 55659
    Section 335-3-5-.06TR SO2 Trading Program—Purpose and Definitions11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-5-.06 are included in the approved SIP.
    Section 335-3-5-.07CAIR Designated Representative for CAIR SO2 Sources4/3/200710/1/2007; 72 FR 55659
    Section 335-3-5-.07TR SO2 Trading Program—Applicability11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-5-.07 are included in the approved SIP.
    Section 335-3-5-.08Permits4/3/200710/1/2007; 72 FR 55659
    Section 335-3-5-.08TR SO2 Trading Program—Retired Unit Exemption11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-5-.08 are included in the approved SIP.
    Section 335-3-5-.09TR SO2 Trading Program—Standard Requirements11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.10TR SO2 Trading Program—computation of Time11/24/20158/31/2016, 81 FR 59869
    Start Printed Page 13662
    Section 335-3-5-.11CAIR SO2 Allowance Tracking System4/3/200710/1/2007; 72 FR 55659
    Section 335-3-5-.11Administrative Appeal Procedures11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-5-.11 are included in the approved SIP.
    Section 335-3-5-.12CAIR SO2 Allowance Transfers4/3/200710/1/2007; 72 FR 55659
    Section 335-3-5-.12SO2 Trading Budgets and Variability Limits11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-5-.12 are included in the approved SIP.
    Section 335-3-5-.13Monitoring and Reporting4/3/200710/1/2007; 72 FR 55659
    Section 335-3-5-.13TR SO2 Allowance Allocations11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-5-.13 are included in the approved SIP.
    Section 335-3-5-.14CAIR SO2 Opt-in Units4/3/200710/1/2007; 72 FR 55659
    Section 335-3-5-.14Authorization of Designated Representative and Alternate Designated Representative11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-5-.14 are included in the approved SIP.
    Section 335-3-5-.15Responsibilities of Designated Representative and Alternate Designated Representative11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.16Changing Designated Representative and Alternate Designated Representative; Changes in Owners and Operators; Changes in Units at the Source11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.17Certificate of Representation11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.18Objections Concerning Designated Representative and Alternate Designated Representative11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.19Delegation by Designated Representative and Alternate Designated Representative11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.21Establishment of Compliance Accounts, Assurance Accounts, and General Accounts11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.22Recordation of TR SO2 Allowance Allocations and Auction Results11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.23Submission of TR SO2 Allowance Transfers11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.24Recordation of TR SO2 Allowance Transfers11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.25Compliance with TR SO2 Emissions Limitation11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.26Compliance with TR SO2 Assurance Provisions11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.27Banking11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.28Account Error11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.29Administrator's Action on Submissions11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.31General Monitoring, Recordkeeping, and Reporting Requirements11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.32Initial Monitoring System Certification and Recertification Procedures11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.33Monitoring System Out-of-Control Periods11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.34Notifications Concerning Monitoring11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.35Recordkeeping and Reporting11/24/20158/31/2016, 81 FR 59869
    Section 335-3-5-.36Petitions for Alternatives to Monitoring, Recordkeeping, or Reporting Requirements11/24/20158/31/2016, 81 FR 59869
    Chapter No. 335-3-6 Control of Organic Emissions
    Section 335-3-6-.01Applicability10/15/19966/6/1997; 62 FR 30991
    Start Printed Page 13663
    Section 335-3-6-.02VOC Water Separation4/15/19879/27/1993; 58 FR 50262
    Section 335-3-6-.03Loading and Storage of VOC4/15/19879/27/1993; 58 FR 50262
    Section 335-3-6-.04Fixed-Roof Petroleum Liquid Storage Vessels10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.05Bulk Gasoline Plants10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.06Bulk Gasoline Terminals8/10/200012/8/2000; 65 FR 76938
    Section 335-3-6-.07Gasoline Dispensing Facilities—Stage I10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.08Petroleum Refinery Sources6/22/19893/19/1990; 55 FR 10062
    Section 335-3-6-.09Pumps and Compressors6/22/19893/19/1990; 55 FR 10062
    Section 335-3-6-.10Ethylene Producing Plants6/22/19893/19/1990; 55 FR 10062
    Section 335-3-6-.11Surface Coating10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.12Solvent Metal Cleaning10/15/199606/6/1997; 62 FR 30991
    Section 335-3-6-.13Cutback Asphalt10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.14Petition for Alternative Controls6/22/19893/19/1990; 55 FR 10062
    Section 335-3-6-.15Compliance Schedules10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.16Test Methods and Procedures8/10/200012/8/2000; 65 FR 76938
    Section 335-3-6-.17Manufacture of Pneumatic Tires10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.18Manufacture of Synthesized Pharmaceutical Products10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.20Leaks from Gasoline Tank Trucks and Vapor Collection Systems10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.21Leaks from Petroleum Refinery Equipment10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.22Graphic Arts10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.23Petroleum Liquid Storage in External Floating Roof Tanks10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.24Applicability10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.25VOC Water Separation6/22/19893/19/1990; 55 FR 10062
    Section 335-3-6-.26Loading and Storage of VOC4/15/19879/27/1993; 58 FR 50262
    Section 335-3-6-.27Fixed-Roof Petroleum Liquid Storage Vessels10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.28Bulk Gasoline Plants10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.29Gasoline Terminals10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.30Gasoline Dispensing Facilities Stage 110/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.31Petroleum Refinery Sources4/15/19879/27/1993; 58 FR 50262
    Section 335-3-6-.32Surface Coating10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.33Solvent Metal Cleaning10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.34Cutback Asphalt10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.35Petition for Alternative Controls4/15/19879/27/1993; 58 FR 50262
    Section 335-3-6-.36Compliances Schedules10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.37Test Methods and Procedures10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.38Manufacture of Pneumatic Tires6/22/19893/19/1990; 55 FR 10062
    Section 335-3-6-.39Manufacture of Synthesized Pharmaceutical Products10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.41Leaks from Gasoline Tank Trucks and Vapor Collection Systems10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.42Leaks from Petroleum Refinery Equipment10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.43Graphic Arts10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.44Petroleum Liquid Storage in External Floating Roof Tanks10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.45Large Petroleum Dry Cleaners10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.46Aerospace Assembly and Component and Component Coatings Operation6/22/19896/6/1997; 62 FR 30991
    Section 335-3-6-.47Leaks from Coke by-Product Recovery Plant Equipment10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.48Emissions from Coke by-Product Recovery Plant Coke Oven Gas Bleeder10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.49Manufacture of Laminated Countertops10/15/19966/6/1997; 62 FR 30991
    Section 335-3-6-.50Paint Manufacture10/15/19966/6/1997; 62 FR 30991
    Start Printed Page 13664
    Section 335-3-6-.53List of EPA Approved and Equivalent Test Methods and Procedures for the Purpose of Determining VOC Emissions10/15/19966/6/1997; 62 FR 30991
    Chapter No. 335-3-7 Carbon Monoxide Emissions
    Section 335-3-7-.01Metals Productions6/22/19893/19/1990; 55 FR 10062
    Section 335-3-7-.02Petroleum Processes6/22/19893/19/1990; 55 FR 10062
    Chapter No. 335-3-8 Control of Nitrogen Oxides Emissions
    Section 335-3-8-.01Standards for Portland Cement Kilns4/6/20017/17/2001; 66 FR 36919
    Section 335-3-8-.02Nitric Acid Manufacturing10/15/19966/6/1997; 62 FR 30991
    Section 335-3-8-.03NOX Emissions from Electric Utility Generating Units10/24/200011/7/2001; 66 FR 56223
    Section 335-3-8-.04Standards for Stationary Reciprocating Internal Combustion Engines3/22/200512/28/2005; 70 FR 76694
    Section 335-3-8-.05NOX Budget Trading Program4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.06Authorized Account Representative for NOX Budget Sources4/6/20017/16/2001; 66 FR 36919
    Section 335-3-8-.07Permits4/6/20017/16/2001; 66 FR 36919
    Section 335-3-8-.07TR NOX Annual Trading Program—Purpose and Definitions11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.07 are included in the approved SIP.
    Section 335-3-8-.08Compliance Certification4/6/20017/16/2001; 66 FR 36919
    Section 335-3-8-.08TR NOX Annual Trading Program—Applicability11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.08 are included in the approved SIP.
    Section 335-3-8-.09NOX Allowance Allocations4/6/20017/16/2001; 66 FR 36919
    Section 335-3-8-.09TR NOX Annual Trading Program—Retired Unit Exemption11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.09 are included in the approved SIP.
    Section 335-3-8-.10NOX Allowance Tracking System4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.10TR NOX Annual Trading Program—Standard Requirements11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.10 are included in the approved SIP.
    Section 335-3-8-.11NOX Allowance Transfers4/6/20017/16/2001; 66 FR 36919
    Section 335-3-8-.11TR NOX Annual Trading Program—Computation of Time11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.11 are included in the approved SIP.
    Section 335-3-8-.12Monitoring and Reporting4/6/20017/16/2001; 66 FR 36919
    Section 335-3-8-.12Administrative Appeal Procedures11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.12 are included in the approved SIP.
    Section 335-3-8-.13Individual Unit Opt-ins4/6/20017/16/2001; 66 FR 36919
    Section 335-3-8-.13NOX Annual Trading Budgets and Variability Limits11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.13 are included in the approved SIP.
    Section 335-3-8-.14New Combustion Sources4/6/20017/16/2001; 66 FR 36919
    Section 335-3-8-.14TR NOX Annual Allowance Allocations11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.14 are included in the approved SIP.
    Section 335-3-8-.16CAIR NOX Annual Budget Trading Program4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.16Authorization of Designated Representative and Alternate Designated Representative11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.16 are included in the approved SIP.
    Section 335-3-8-.17CAIR Designated Representative for CAIR NOX Sources4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.17Responsibilities of Designated Representative and Alternate Designated Representative11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.17 are included in the approved SIP.
    Section 335-3-8-.18CAIR Permits4/3/200710/1/2007; 72 FR 55659
    Start Printed Page 13665
    Section 335-3-8-.18Changing Designated Representative and Alternate Designated Representative; Changes in Owners and Operators; Changes in Units at the Source11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.18 are included in the approved SIP.
    Section 335-3-8-.19Certificate of Representation11/24/20158/31/2016, 81 FR 59869
    Section 335-3-8-.20CAIR NOX Allowance Allocations4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.20Objections Concerning Designated Representative and Alternate Designated Representative11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.20 are included in the approved SIP.
    Section 335-3-8-.21CAIR NOX Allowance Tracking System4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.21Delegation by Designated Representative and Alternate Designated Representative11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.21 are included in the approved SIP.
    Section 335-3-8-.23CAIR Monitoring and Reporting4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.23Establishment of Compliance Accounts, Assurance Accounts, and General Accounts11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.23 are included in the approved SIP.
    Section 335-3-8-.24CAIR NOX Opt-in Units4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.24Recordation of TR NOX Annual Allowance Allocations and Auction Results11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.24 are included in the approved SIP.
    Section 335-3-8-.25CAIR NOX Ozone Season Trading Program4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.25Submission of TR NOX Annual Allowance Transfers11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.25 are included in the approved SIP.
    Section 335-3-8-.26CAIR Designated Representative for CAIR NOX Ozone Season Sources4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.26Recordation of TR NOX Annual Allowance Transfers11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.26 are included in the approved SIP.
    Section 335-3-8-.27CAIR NOX Ozone Season Permits4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.27Compliance with TR NOX Annual Emissions Limitation11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.27 are included in the approved SIP.
    Section 335-3-8-.28Compliance with TR NOX Annual Assurance Provisions11/24/20158/31/2016, 81 FR 59869
    Section 335-3-8-.29CAIR NOX Ozone Season Allowance Allocations4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.29Banking11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.29 are included in the approved SIP.
    Section 335-3-8-.30CAIR NOX Ozone Season Allowance Tracking System4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.30Account Error11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.30 are included in the approved SIP.
    Section 335-3-8-.31Administrator's Action on Submissions11/24/20158/31/2016, 81 FR 59869
    Section 335-3-8-.32CAIR NOX Ozone Season Monitoring and Reporting4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.33CAIR NOX Ozone Season Opt-in Units4/3/200710/1/2007; 72 FR 55659
    Section 335-3-8-.33General Monitoring, Recordkeeping, and Reporting Requirements11/24/20158/31/2016, 81 FR 59869Both sections of 335-3-8-.33 are included in the approved SIP.
    Section 335-3-8-.34Initial Monitoring System Certification and Recertification Procedures11/24/20158/31/2016, 81 FR 59869
    Section 335-3-8-.35Monitoring System Out-of-Control Periods11/24/20158/31/2016, 81 FR 59869
    Section 335-3-8-.36Notifications Concerning Monitoring11/24/20158/31/2016, 81 FR 59869
    Start Printed Page 13666
    Section 335-3-8-.37Recordkeeping and Reporting11/24/20158/31/2016, 81 FR 59869
    Section 335-3-8-.38Petitions for Alternatives to Monitoring, Recordkeeping, or Reporting Requirements11/24/20158/31/2016, 81 FR 59869
    Section 335-3-8-.39TR NOX Ozone Season Group 2 Trading Program—Purpose and Definitions6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.40TR NOX Ozone Season Group 2 Trading Program—Applicability11/24/201510/6/2017, 82 FR 46674
    Section 335-3-8-.41TR NOX Ozone Season Group 2 Trading Program—Retired Unit Exemption6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.42TR NOX Ozone Season Group 2 Trading Program—Standard Requirements6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.43TR NOX Ozone Season Group 2 Trading Program—Computation of Time6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.44Administrative Appeal Procedures11/24/201510/6/2017, 82 FR 46674
    Section 335-3-8-.45NOX Ozone Season Group 2 Trading Budgets and Variability Limits6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.46TR NOX Ozone Season Group 2 Allowance Allocations6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.48Authorization of Designated Representative and Alternate Designated Representative6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.49Responsibilities of Designated Representative and Alternate Designated Representative6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.50Changing Designated Representative and Alternate Designated Representative; Changes in Owners and Operators; Changes in Units at the Source6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.51Certificate of Representation6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.52Objections Concerning Designated Representative and Alternate Designated Representative6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.53Delegation by Designated Representative and Alternate Designated Representative6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.55Establishment of Compliance Accounts, Assurance Accounts, and General Accounts6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.56Recordation of TR NOX Ozone Season Group 2 Allowance Allocations and Auction Results6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.57Submission of TR NOX Ozone Season Group 2 Allowance Transfers6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.58Recordation of TR NOX Ozone Season Group 2 Allowance Transfers6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.59Compliance with TR NOX Ozone Season Group 2 Emissions Limitation6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.60Compliance with TR NOX Ozone Season Group 2 Assurance Provisions6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.61Banking6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.62TR NOX Ozone Season Group 2 Trading Program—Account Error6/9/201710/6/2017, 82 FR 46674
    Start Printed Page 13667
    Section 335-3-8-.63TR NOX Ozone Season Group 2 Trading Program—Administrator's Action on Submissions6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.65General Monitoring, Recordkeeping, and Reporting Requirements6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.66Initial Monitoring System Certification and Recertification Procedures6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.67Monitoring System Out-of-Control Periods6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.68Notifications Concerning Monitoring6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.69Recordkeeping and Reporting6/9/201710/6/2017, 82 FR 46674
    Section 335-3-8-.70Petitions for Alternatives to Monitoring, Recordkeeping, or Reporting Requirements6/9/201710/6/2017, 82 FR 46674
    Chapter No. 335-3-9 Control of Emissions from Motor Vehicles
    Section 335-3-9-.01Visible Emission Restriction for Motor Vehicles10/15/19966/6/1997; 62 FR 30991
    Section 335-3-9-.02Ignition System and Engine Speed8/10/200012/8/2000; 65 FR 76938
    Section 335-3-9-.03Crankcase Ventilation Systems8/10/200012/8/2000; 65 FR 76938
    Section 335-3-9-.04Exhaust Emission Control Systems6/22/19893/19/1990; 55 FR 10062
    Section 335-3-9-.05Evaporative Loss Control Systems6/22/19893/19/1990; 55 FR 10062
    Section 335-3-9-.06Other Prohibited Acts8/10/200012/8/2000; 65 FR 76938
    Section 335-3-9-.07Effective Date10/15/19966/6/1997; 62 FR 30991
    Chapter No. 335-3-12 Continuous Monitoring Requirements for Existing Sources
    Section 335-3-12-.01General6/22/19893/19/1990; 55 FR 10062
    Section 335-3-12-.02Emission Monitoring and Reporting Requirements2/17/19989/14/1998; 63 FR 49005
    Section 335-3-12-.03Monitoring System Malfunction6/22/19893/19/1990; 55 FR 10062
    Section 335-3-12-.04Alternate Monitoring and Reporting Requirements6/22/19893/19/1990; 55 FR 10062
    Section 335-3-12-.05Exemptions and Extensions6/22/19893/19/1990; 55 FR 10062
    Chapter No. 335-3-13 Control of Fluoride Emissions
    Section 335-3-13-.01General10/15/19966/6/1997; 62 FR 30991
    Section 335-3-13-.02Superphosphoric Acid Plants10/15/199606/6/1997; 62 FR 30991
    Section 335-3-13-.03Diammonium Phosphate Plants10/15/19966/6/1997; 62 FR 30991
    Section 335-3-13-.04Triple Superphosphoric Plants10/15/19966/6/1997; 62 FR 30991
    Section 335-3-13-.05Granular Triple Superphosphoric Storage Facilities10/15/19966/6/1997; 62 FR 30991
    Section 335-3-13-.06Wet Process Phosphoric Acid Plants10/15/19966/6/1997; 62 FR 30991
    Chapter No. 335-3-14 Air Permits
    Section 335-3-14-.01General Provisions2/17/19989/14/1998; 63 FR 49005
    Section 335-3-14-.02Permit Procedures10/15/19966/6/1997; 62 FR 30991
    Section 335-3-14-.03Standards for Granting Permits5/23/20119/26/2012; 77 FR 59100.
    Section 335-3-14-.04Air Permits Authorizing Construction in Clean Air Areas (Prevention of Significant Deterioration (PSD))11/25/2014710/10/2017; 82 FR 469214
    Start Printed Page 13668
    Section 335-3-14-.05Air Permits Authorizing Construction in or Near Nonattainment Areas5/23/20111/11/2016; 81 FR 1124With the exception of: The portion of 335-3-14-.05(1)(k) stating “excluding ethanol production facilities that produce ethanol by natural fermentation”; and 335-3-14-.05(2)(c)3 (addressing fugitive emission increases and decreases). Also with the exception of the state-withdrawn elements: 335-3-14-.05(1)(h) (the actual-to-potential test for projects that only involve existing emissions units); the last sentence at 335-3-14-.05(3)(g), stating “Interpollutant offsets shall be determined based upon the following ratios”; and the NNSR interpollutant ratios at 335-3-14-.05(3)(g)1-4.
    Chapter No. 335-3-15 Synthetic Minor Operating Permits
    Section 335-3-15-.01Definitions10/15/19966/6/1997; 62 FR 30991
    Section 335-3-15-.02General Provisions8/10/200012/8/2000; 65 FR 76938
    Section 335-3-15-.03Applicability11/23/199310/20/1994; 59 FR 52916
    Section 335-3-15-.04Synthetic Minor Operating Permit Requirements10/15/19966/6/1997; 62 FR 30991
    Section 335-3-15-.05Public Participation10/15/19966/6/1997; 62 FR 30991
    Chapter No. 335-3-17 Conformity of Federal Actions to State Implementation Plans
    Section 335-3-17.01Transportation Conformity5/28/201310/12/2017; 82 FR 47383
    Section 335-3-17-.02General Conformity5/23/20119/26/2012; 77 FR 59100

    (d) EPA approved Alabama source specific requirements.

    EPA Approved Alabama Source-Specific Requirements

    Name of sourcePermit No.State effective dateEPA approval dateExplanation
    Lafarge Cement KilnAB70004_1_012/6/20087/30/2009; 74 FR 37945Certain provisions of the permit.
    Lehigh Cement Kiln4-07-0290-032/6/20087/30/2009, 74 FR 37945Certain provisions of the permit.
    * * * * *
    End Supplemental Information

    [FR Doc. 2018-06367 Filed 3-29-18; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
3/30/2018
Published:
03/30/2018
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule; notification of administrative change.
Document Number:
2018-06367
Dates:
This action is effective March 30, 2018.
Pages:
13658-13668 (11 pages)
Docket Numbers:
AL-2017, FRL-9975-72-Region 4
Topics:
Air pollution control, Carbon monoxide, Environmental protection, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds
PDF File:
2018-06367.pdf
Supporting Documents:
» Environmental Impact Statements; Availability, etc.: Weekly Receipts
» Meetings: Science Advisory Board's 2017 Scientific and Technological Achievement Awards Committee
» Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of West Virginia
» Cross-Media Electronic Reporting: Authorized Program Revision Approval, State of North Carolina
» Cross-Media Electronic Reporting: Authorized Program Revision Approval, Idaho
» Environmental Impact Statements; Availability, etc.: Weekly Receipts
» 404 Program Definitions; Exempt Activities Not Requiring 404 Permits; CFR Correction
» Proposed CERCLA Cost Recovery Settlements: Puerto Rico Electric Power Authority Palo Seco Superfund Site, Toa Baja, PR
» Cross-Media Electronic Reporting: Authorized Program Revision Approval, UT
» Environmental Impact Statements; Availability, etc.: Weekly Receipts
CFR: (1)
40 CFR 52.50