95-8009. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 60, Number 62 (Friday, March 31, 1995)]
    [Notices]
    [Pages 16646-16647]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-8009]
    
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-4721-6]
    
    
    Environmental Impact Statements; Notice of Availability
    
        Responsible Agency: Office of Federal Activities, General 
    Information (202) 260-5076 OR (202) 260-5075.
        Weekly receipt of Environmental Impact Statements Filed March 20, 
    1995 Through March 24, 1995 Pursuant to 40 CFR 1506.9.
    
    EIS No. 950101, DRAFT EIS, USA, MA, Army Material Technology Laboratory 
    Reuse and Disposal, Implementation, Town of Watertown, Middlesex, 
    Norfolk, Suffolk and Essex Counties, MA, Due: May 15, 1995, Contact: 
    James Davidson (703) 274-5510.
    EIS No. 950102, DRAFT EIS, USA, IN, Jefferson Proving Ground Disposal 
    and Reuse, Implementation, Town of Madison, Jefferson, Jennings and 
    Ripley Counties, IN, Due: May 15, 1995, Contact: James Davidson (703) 
    274-5510.
    EIS No. 950103, FINAL EIS, IBR, AZ, Glen Canyon Dam Operation, 
    Implementation, Colorado River Storage Project, Funding and COE Section 
    10 and 404 Permits, Coconino County, AZ, Due: May 01, 1995, Contact: 
    Gordon S. Lind (801) 524-5479.
    EIS No. 950104, DRAFT EIS, AFS, VT, Mad River Water Withdrawal and 
    Sugarbush South Snowmaking and Trail Improvement Project, Approval, 
    Special-Use and COE Section 404 Permit Issuance, Green Mountain 
    National Forest, Washington County, VT, Due: May 15, 1995, Contact: 
    Samuel M. Emmons (802) 747-6757.
    EIS No. 950105, FINAL EIS, FHW, OR, Mill Creek/West Sixth Street Bridge 
    Replacement, Funding, The Dalles, [[Page 16647]] Wasco County, OR, Due: 
    May 01, 1995, Contact: Alan R. Steger (503) 399-5749.
    EIS No. 950106, DRAFT EIS, NPS, WA, Mountain Goat Management Within 
    Olympic National Park, Implementation, Clallan, Grays Harbor, Jefferson 
    and Mason Counties, WA, Due: May 31, 1995, Contact: Paul Crawford (360) 
    452-4501.
    EIS No. 950107, DRAFT EIS, AFS, OR, East Fork Deer Creek Long-Term 
    Ecosystem Productivity Research Study, Implementation, Willamette 
    National Forest, Blue River Ranger District, Lane County, OR, Due: May 
    15, 1995, Contact: Lynn Burditt (503) 822-3317.
    EIS No. 950108, FINAL EIS, FHW, MD, US 29 Improvements, Sligo Creek 
    Parkway to the Patuxent River Bridge, Funding and COE Section 404 
    Permit, Montgomery County, MD, Due: May 01, 1995, Contact: David Lawton 
    (410) 962-4440.
    EIS No. 950109, DRAFT SUPPLEMENT, COE, CA, Napa River Flood Control 
    Project, Updated Information, Flood Improvement, City of Napa, Napa 
    County, CA, Due: May 15, 1995, Contact: Thomas Bonetti (916) 557-6727.
    EIS No. 950110, FINAL EIS, AFS, NM, Sipapu Ski Area Expansion, Master 
    Development Plan Approval and Special Use Permit, Carson National 
    Forest, Camino Real Ranger District, Taos County, NM, Due: May 01, 
    1995, Contact: Terry Dilts (505) 587-2255.
    EIS No. 950111, DRAFT EIS, COE, VA, Grundy Flood Damage Reduction/
    Highway Upgrade Project, Implementation, Town of Grundy, Buchanan 
    County, VA, Due: May 15, 1995, Contact: Ben Borda (304) 529-5712.
    EIS No. 950112, DRAFT EIS, COE, CA, Santa Paula Creek Flood Control 
    Project, Improvements, Right-of-Way Grant, Ventura County, CA, Due: May 
    15, 1995, Contact: Jim Hutchison (213) 894-3057.
    EIS No. 950113, FINAL EIS, DOE, CO, Flatiron-Erie 115-kV Electrical 
    Transmission Line Replacement of Wood-Pole Structures, Construction, 
    Operation and Right-of-Way Grant, City of Longmont, Larimer, Boulder 
    and Weld Counties, CO, Due: May 01, 1995, Contact: Rodney Jones (303) 
    490-7200.
    EIS No. 950114, DRAFT EIS, GSA, Pacific Highway Port of Entry (POE) 
    Facility Expansion, Construction of WA-543 in Blaine, near the United 
    States/Canada Border in Blaine, Whatcom County, WA, Due: May 15, 1995, 
    Contact: Donna M. Meyer (206) 931-7675.
    EIS No. 950115, FINAL EIS, BIA, SD, Rosebud and Cheyenne River Sioux 
    Indian Reservations, Management of the Livestock Grazing and Prairie 
    Dog Control, Funding, Todd and Mellette Counties, SD, Due: May 01, 
    1995, Contact: Wayland Lilly (605) 226-7621.
    
    Amended Notices
    
    EIS No. 950092, DRAFT EIS, FTA, PR, Tren Urbano Transit Project, 
    Improvement, San Juan Metropolitan Area, Funding, U.S. Coast Guard 
    Bridge Permit, NPDES Permit, COE Section 10 and 404 Permits, PR, Due: 
    May 15, 1995, Contact: Roger Krahl (404) 347-7875. Published FR -3-24-
    95- Refiled/Due Date Correction
    EIS No. 950009, DRAFT EIS, AFS, CA, Elsmere Solid Waste Management 
    Facility, Implementation, Angeles National Forest (ANF) Land Adjustment 
    Plan, Conditional Use and Oak Tree Permit, Los Angeles County, CA, Due: 
    August 04, 1995, Contact: G. Lynn Spague (818) 574-1613. Published FR -
    02-03-95 Review period extended.
    EIS No. 950034, DRAFT EIS, AFS, AZ, Carlotta Open-Pit Copper Mine 
    Project, Construction and Operation, Plan of Operations and COE Section 
    404 Permit, Tonto National Forest, Gila and Pinal Counties, AZ, Due: 
    May 11, 1995, Contact: Paul M. Stewart (602) 225-5200. Published FR -
    02-03-95 Review period extended.
    
        Dated: March 28, 1995
    B. Katherine Biggs
    Associate Director, NEPA Compliance Division Office of Federal 
    Activities.
    [FR Doc. 95-8009 Filed 3-30-95; 8:45 am]
    BILLING CODE 6560-50-U
    
    

Document Information

Published:
03/31/1995
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
95-8009
Pages:
16646-16647 (2 pages)
Docket Numbers:
ER-FRL-4721-6
PDF File:
95-8009.pdf