97-8019. FY96-97 Climate Change Fuel Cell Program Environmental Assessment
[Federal Register Volume 62, Number 61 (Monday, March 31, 1997)]
[Notices]
[Page 15165]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-8019]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
FY96-97 Climate Change Fuel Cell Program Environmental Assessment
AGENCY: U.S. Army Armament Research Development & Engineering Center
(ARDEC).
ACTION: Notice of availability (request for comments).
-----------------------------------------------------------------------
SUMMARY: An Environmental Assessment (EA) has been prepared to discuss
the significant impacts of the FY96-97 Congressional Climate Change
Fuel Cell Program. ARDEC was selected by the Deputy Under Secretary of
Defense for Environmental Security to manage this FY96-97 Climate
Change Fuel Cell Program. ARDEC is publishing the EA for review and
comment. Copies of the EA are available by contacting Mr. Robert Scola
at the address listed below. Under this Program, Fuel Cells are to be
located throughout the United States including selected Department of
Defense (DOD) installations, both CONUS or OCONUS. A DOD installation
is to form a partnership with a private party and submit an application
for a rebate for their cell purchase. The selection of the
installations is to be completed by a selection board which will
consider the attributes of each installation's application and the
benefits which a Fuel Cell will provide. The actual selection of the
DOD installations will be completed in the future and therefore are
unknown as of the time of the EA preparation.
DATES: Comments must be received on the EA no later than April 30,
1997.
ADDRESSES: Comments may be mailed to U.S. Army, Armament Research
Development & Engineering Center, Industrial Ecology Center, AMSTA-AR-
ET (ATTN: Mr. Garry O. Kosteck P.E.), Building 172, Picatinny Arsenal,
NJ 07806-5000.
FOR FURTHER INFORMATION CONTACT:
Mr. Daniel Tolliver at (201) 724-4084 or Mr. Robert Zanowicz at (201)
724-5744.
SUPPLEMENTARY INFORMATION:
Introduction
Currently, the only commercial available fuel cell is a Phosphoric
Acid Fuel Cell (PAFC) and it is most likely that this unit is to be
installed at all the selected DOD installations. As of the date of this
document's preparation, over 70 PAFCs have been installed and are
operating throughout the world.
Background
Since the selected DOD installations will most likely choose the
same PAFC, it has been decided to prepare a programmatic EA rather than
individual ones for each installation to discuss the similar issues of
installing and operating a Fuel Cell. The Council of Environmental
Quality's regulations(s) permit environmental documentation to be
written in a non-specific manner when the action is essentially the
same but at different locations. This is the situation here and this EA
is being prepared to allow it to be ``tiered'' to local conditions.
Selected installations shall be required to incorporate the material of
this document for any local environmental documentation to eliminate
any repetitious issues and to focus upon local issues not discussed
herein. The selected DOD installations shall be required to submit a
certification letter indicating that local environmental issues such as
historical buildings, wetlands, etc. have been identified, reviewed and
mitigated where necessary.
Gregory D. Showalter,
Army Federal Register Liaison Officer.
[FR Doc. 97-8019 Filed 3-28-97; 8:45 am]
BILLING CODE 3710-08-M
Document Information
- Published:
- 03/31/1997
- Department:
- Defense Department
- Entry Type:
- Notice
- Action:
- Notice of availability (request for comments).
- Document Number:
- 97-8019
- Dates:
- Comments must be received on the EA no later than April 30, 1997.
- Pages:
- 15165-15165 (1 pages)
- PDF File:
-
97-8019.pdf