99-7836. Texas Blowdown Reforestation Project, National Forests and Grasslands in Texas, Angelina, Montgomery, Sabine, San Augustine, San Jucinto, and Walker Counties, Texas  

  • [Federal Register Volume 64, Number 61 (Wednesday, March 31, 1999)]
    [Notices]
    [Pages 15339-15342]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-7836]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF AGRICULTURE
    
    Forest Service
    
    
    Texas Blowdown Reforestation Project, National Forests and 
    Grasslands in Texas, Angelina, Montgomery, Sabine, San Augustine, San 
    Jucinto, and Walker Counties, Texas
    
    AGENCY: Forest Service, USDA.
    
    ACTION: Notice of intent to prepare an Environmental Impact Statement
    
    -----------------------------------------------------------------------
    
    SUMMARY: The U.S. Department of Agriculture, Forest Service, National 
    Forests and Grasslands in Texas (NFGT) will prepare an Environmental 
    Impact Statement (EIS) to assess and disclose the environmental effects 
    of site preparation and reforestation on windstorm-damaged areas in the 
    Angelina, Sabine, and Sam Houston National Forests. The proposed 
    actions include site preparation using mechanical methods and 
    prescribed fire, alone or in combination, followed by natural 
    regeneration and/or planting on about 32,750 acres of windstorm-damaged 
    forests. The project will be implemented in accordance with the 
    direction in the 1996 Revised Land and Resource Management Plan (the 
    Plan) for the National Forests and Grasslands in Texas. Project 
    activities will take place within Management Area 1--Upland Forest 
    Ecosystems and Management Area 2--Red-cockaded Woodpecker (RCW) 
    Emphasis.
        In addition to the management activities proposed for 
    reforestation, the EIS will assess and disclose the effects of amending 
    the forest plan to allocate an additional 7,300 acres to Management 
    Area 2 on the Sabine National Forest due to the changed conditions 
    caused by the windstorm.
    
    DATES: Written comments and suggestions concerning the scope of the 
    analysis must be postmarked or received by April 30, 1999. The 
    estimated date for filing the draft EIS is June 1999, followed by the 
    final decision in September 1999.
    
    ADDRESSES: The Responsible Official is Ronnie Raum, Forest Supervisor; 
    National Forests and Grasslands in Texas; 701 North First Street; 
    Lufkin, TX 75901. Written comments and suggestions concerning the scope 
    of analysis may be sent to him at that address.
    
    FOR FURTHER INFORMATION CONTACT: Keith Baker, Project Environmental 
    Coordinator. Phone: 409-344-6205 (New Waverly, TX).
    
    SUPPLEMENTARY INFORMATION: On the afternoon of February 10, 1998, a 
    storm with hurricane-force winds struck the forests of deep east Texas. 
    Approximately 103,000 acres of national forest land on the Angelina, 
    Sabine, and Sam Houston National Forests were damaged by the windstorm. 
    The Forest Service categorized the storm damage severity and extent on 
    the three affected national forests as follows:
         Extensive damage--loss of greater than 60 percent of the 
    existing trees (11,600 acres),
         Moderate damage--loss of 30 to 60 percent of the existing 
    trees (65,400 acres), and
         Light damage--loss of 10 to 30 percent of the existing 
    trees (26,000 acres).
        The majority of lands affected by the storm are allocated under the 
    Plan to Management Area 1 (upland forest ecosystems) and Management 
    Area 2 (red-cockaded woodpecker emphasis). Other Management Areas (MAs) 
    were also affected, including MA-4
    
    [[Page 15340]]
    
    (streamside management zones), MA-8 (special area management), MA-9 
    (recreation area management), and MA-10 (administrative and special use 
    sites).
        The Forest Service determined that an emergency response was needed 
    to meet three objectives: (1) Reduce the potential for high intensity 
    wildfires spreading into the intermingled private ownerships that 
    include individual homes, subdivisions, and rural communities; (2) 
    minimize further damage to RCW and bald eagle habitat; and (3) reduce 
    the risk of anticipated bark beetle attack to living trees that could 
    kill additional federal and private timber, RCW habitat, and bald eagle 
    habitat. The Forest Service requested approval for alternative 
    arrangements for compliance with the National Environmental Policy Act 
    (NEPA) from the Council on Environmental Quality (CEQ) to expedite the 
    removal of the blown down and damaged timber. On March 10, 1998, CEQ 
    approved the Forest Service's request for alternative arrangements and 
    the NFGT undertook actions to remove blown down and damaged trees to 
    meet the three objectives. As part of these alternative arrangements, 
    the Forest Service and CEQ agreed that the actions taken to reforest 
    the damaged areas of the three affected national forests would be 
    assessed in an Environmental Impact Statement.
        On July 15, 1998, the Forest Service published a notice in the 
    Federal Register about plans to develop a Changed Condition Analysis 
    (CCA) covering the areas affected by the storm (63 FR 38153, Jul. 15, 
    1998). The Forest Service identified two objectives for analysis: (1) 
    To provide the basis for site preparation and reforestation proposals 
    in the storm-damaged area of the NFGT and (2) to analyze the need to 
    adjust land allocations to MA-2 on the Angelina and Sabine NFs to meet 
    Plan objectives for RCW habitat. After completion of the CAA, the 
    Interdisciplinary Team (IDT) used a systematic procedure to develop a 
    proposed action to start the NEPA process.
    
    Proposed Action
    
    Site Preparation and Reforestation
    
        The Forest Service proposes to initiate site preparation and 
    reforestation actions on the Angelina and Sabine National Forests in 
    MA-1 and MA-2. The actions proposed will provide for the development of 
    forested conditions appropriate for the sites based on the recent 
    developed Ecological Classification System (ECS). The ESC was prepared 
    in cooperation with the Nature Conservancy of Texas and the Kisatchie 
    National Forest to describe the public and private forest lands of the 
    western Louisiana and eastern Texas portions of the Western Gulf 
    Coastal Plain. The ECS classifies land into ecological types through 
    the integration of multiple components of the forest ecosystem--soils, 
    physiography (topography and landform), and vegetation. A land 
    classification based on these components reflects the differences in 
    the major environmental characteristics of a site, and it provides 
    information about the inherent potential of a site in terms of the 
    types of vegetative communities it will support. The reforestation 
    actions where proposed to develop the appropriate vegetation 
    considering the ECS, the existing vegetation conditions, and the 
    objectives and management direction of the Plan.
        Only those damaged areas where the post-storm residual basal area 
    (BA) is less than 60 square feet will receive unique actions. Damaged 
    areas that exceed 60 BA will not be treated specifically to manipulate 
    the existing forest type or tree species, but will be subject to 
    application of prescribed fire to reduce storm-generated fuel buildup 
    and/or control of midstory vegetation adverse to Red-cockaded 
    woodpecker habitat. The Forest Service proposes to allow damaged areas 
    on the Sam Houston National Forest to reforest naturally without active 
    management to prepare sites or manipulate the plant species.
        Within the Angelina and Sabine NFs the following actions are 
    proposed;
         In areas the ECS indicates should be dominated by beech-
    white oak, mixed oaks, and sweetbay-swamp tupelo forest types and the 
    forest type is not directly correlated to slope or topographical 
    position the following actions will be taken:
        (a) Within MA-2 allow the areas to regenerate naturally without 
    site preparation or artificial planting. Allow fire on a 3 to 5 year 
    rotation since these areas still contain a residual pine component that 
    provides for RCW foraging. About 5250 acres would be treated in this 
    manner.
        (b) Within MA-1 allow the areas to regenerate naturally without 
    site preparation or artificial planting. Only allow prescribed fire to 
    back into these areas when adjoining areas have been designated for use 
    of prescribed fire. About 3750 acres would be treated in this manner.
         In areas the ECS indicates should be dominated by 
    shortleaf pine-longleaf pine-oak mixtures and the forest type is not 
    directly correlated to slope or topographical position the following 
    actions will be taken:
        (a) Within MA-2 where the residual overstory basal area ranges from 
    0-30 square feet, conduct mechanical site preparation, allowing up to 
    20 BA of oaks in clumps or along drainages, plant longleaf pine, and 
    prescribe burn every 3 to 5 years. Approximately 1150 acres would 
    receive these treatments.
        (b) Within MA-2 in the areas where the residual overstory basal 
    exceeds 30 square feet and is less than about 40 square feet conduct 
    mechanical site preparation, leaving no more than 10 BA of hardwoods in 
    clumps and along drainages, allow for natural regeneration of pines to 
    develop a two age stand, and prescribe burn every 3 to 5 years. In 
    areas where basal area ranges from about 40-60 square feet prescribe 
    burn only and allow for natural regeneration. About 850 acres would 
    receive these treatments.
        (c) Within MA-1 where the residual overstory basal area ranges from 
    0-30 square feet, commercially remove residual loblolly pine that will 
    impede shortleaf-longleaf regeneration, then mechanically site prepare 
    the areas, plant shortleaf pine or longleaf pine seedlings depending on 
    the site suitability, and prescribe burn the areas on a 3 to 5 year 
    rotation. About 1550 acres would receive these treatments.
        (d) Within MA-1 where the residual overstory basal area exceeds 30 
    square feet and is less than about 40 square feet conduct mechanical 
    site preparation, leaving no more than 10 BA of hardwoods in clumps and 
    along drainages, plant longleaf pine in openings on suitable soil 
    types. Where shortleaf pine should dominate allow for natural 
    regeneration to develop a two age stand, and prescribe burn every 3 to 
    5 years. In areas where basal area ranges from about 40-60 square feet 
    prescribe burn only and allow for natural regeneration. About 400 acres 
    would be treated with this prescription.
         In areas the ECS indicates should be dominated by 
    shortleaf pine-loblolly pine forest mixtures and the forest type is not 
    directly correlated to slope or topographical position the following 
    actions will be taken:
        (a) Inside MA-2 where the residual overstory basal area ranges from 
    0-30 square feet, the areas would be site prepared using mechanical 
    methods, shortleaf pine would be planted in openings on ridgetops and 
    upper slopes, and prescribed burning would be conducted on a 3 to 5 
    year cycle. In areas where basal area ranges from about 40-60 square 
    feet prescribe burn only and allow for natural regeneration.
    
    [[Page 15341]]
    
    These treatments would be implemented on about 1450 acres.
        (b) Inside MA-2 in the areas where the residual overstory basal 
    exceeds 30 square feet and is less than about 40 square feet conduct 
    mechanical site preparation, leaving no more than 20 BA of hardwoods in 
    clumps and along drainages, plant shortleaf pine in openings on 
    ridgetops and upper slopes, and conduct prescribed burning on a 3 to 5 
    year cycle. About 1550 acres would receive these treatments.
        (c) Within MA-1 where the residual overstory basal area ranges from 
    0-30 square feet, the areas would be site prepared using mechanical 
    methods, prescribe burned, and shortleaf pine would be planted on 
    ridgetops and upper slopes where no shortleaf pine seed source exists 
    or where adequate seed source exists would be allowed to regenerate 
    naturally. These treatments would be implemented on about 1450 acres.
        (d) Within MA-1 where the residual overstory basal area ranges from 
    30-60 square feet, prescribe burn the areas to allow for natural 
    regeneration and the development of two-age stands. About 1050 acres 
    would be treated with this prescription.
         In areas the ECS indicates should be dominated by white 
    oak-loblolly pine-sweetbay or white oak-loblolly pine-willow oak forest 
    types and the forest type is directly correlated to slope or 
    topographical position the following actions will be taken:
        (a) Within MA-2 allow the areas to regenerate naturally without 
    site preparation or artificial planting. Allow fire on a 3 to 5 years 
    rotation since these areas still contain a residual pine component that 
    provides for RCW foraging. About 550 acres would be treated in this 
    manner.
        (b) Within MA-1 allow the areas to regenerate naturally without 
    site preparation or artificial planting. Only allow prescribed fire to 
    back into these areas when adjoining areas have been designated for use 
    of prescribed fire. About 400 acres would be treated in this manner.
         In areas the ECS indicates should be dominated by 
    shortleaf pine-longleaf pine-oak mixtures and the forest type is 
    correlated to slope or topographical position the following actions 
    will be taken:
        (a) Within MA-2 where the residual overstory basal area ranges from 
    0-30 square feet, conduct mechanical site preparation, plant longleaf 
    pine on the site prepared areas, prescribe burn every 3 to 5 years, and 
    limit hardwoods to the lower slope positions. Approximately 950 acres 
    would receive these treatments.
        (b) Within MA-2 in the areas where the residual overstory basal 
    exceeds 30 square feet and is less than about 40 square feet conduct 
    mechanical site preparation, leaving no more than 10 BA of hardwoods in 
    clumps and along drainages, allow for natural regeneration of pines to 
    develop a two age stand, and prescribe burn every 3 to 5 years. In 
    areas where basal area ranges from about 40-60 square feet prescribe 
    burn only and allow for natural regeneration. About 1300 acres would 
    receive these treatments.
        (c) Within MA-1 where the residual overstory basal area ranges from 
    0-30 square feet, commercially remove residual loblolly pine on ridges 
    and upper slopes that will impede shortleaf-longleaf regeneration, then 
    mechanically site prepare the areas, plant shortleaf pine or longleaf 
    pine seedlings depending on soil type and slope position, and prescribe 
    burn the areas on a 3 to 5 year rotation. About 3450 acres would 
    receive these treatments.
        (d) Within MA-1 where the residual overstory basal area ranges from 
    30-60 square feet, prescribe burn the areas to allow for natural 
    regeneration and the development of two-age stands. About 2650 acres 
    would be treated with this prescription.
         In areas the ECS indicates should be dominated by 
    shortleaf pine-loblolly pine forest mixtures and the forest type is 
    correlated to slope or topographical position the following actions 
    will be taken:
        (a) Inside MA-2 where the residual overstory basal area ranges from 
    0-30 square feet, the areas would be site prepared using mechanical 
    methods, shortleaf pine would be planted in openings on ridgetops and 
    upper slopes, and prescribed burning would be conducted on a 3 to 5 
    year cycle. These treatments would be implemented on about 750 acres.
        (b) Inside MA-2 where the residual overstory basal area ranges from 
    30-60 square feet, conduct site preparation using mechanical methods, 
    plant shortleaf pine in openings on ridgetops and upper slopes and 
    allow natural regeneration elsewhere, and prescribed burning would be 
    conducted on a 3 to 5 years cycle. About 1300 acres would receive these 
    treatments.
        (c) Within MA-1 where the residual overstory basal area ranges from 
    0-30 square feet, loblolly pine would be commercially removed from 
    ridgetops and upper slopes, the areas would be site prepared using 
    mechanical methods, prescribe burned, and shortleaf pine would be 
    planted on ridgetops and upper slopes where no shortleaf pine seed 
    source exists or where adequate seed source exists would be allowed to 
    regenerate naturally. These treatments would be implemented on about 
    1450 acres.
        (d) Within MA-1 where the residual overstory basal area ranges from 
    30-60 square feet, prescribe burn the areas to allow for natural 
    regeneration and the development of two-age stands. About 1500 acres 
    would be treated with this prescription.
        These actions will result in different vegetation patterns in many 
    areas than existed prior to the February, 1998, windstorm. Hardwoods 
    will be more prevalent on sites where the FCS indicates this is 
    appropriate, such as lower slopes and moister sites. On drier upland 
    sites pines will dominate and hardwoods will be limited to clumps or in 
    areas along minor drainages. Many areas will develop different stand 
    structure because overstory trees will remain and the new trees will 
    create two different ages of vegetation on the same site. Natural 
    regeneration will be relied on where it is expected to result in the 
    development of vegetation appropriate for the site. Planting of 
    shortleaf pine and longleaf pine will be done where a seed source for 
    these species does not exist and the ECS indicates they should exist.
    
    Forest Plan Amendment (Non-Significant Amendment)
    
        The Plan delineated approximately 18,360 acres of the Sabine 
    National Forest as MA-2 in an area known as the Northern Sabine Habitat 
    Management Area (HMA). The emphasis in MA-2 is the production of high 
    quality habitat for the endangered redcockaded woodpecker; the size of 
    the HMA was determined based on a population objective of 91 active RCW 
    groups. The February 10 storm affected approximately 18,300 acres of 
    the Northern Sabine HMA. Of this total, about 15,000 acres received 
    moderate to extensive damage. Because of the habitat needs for the RCW, 
    many of the acres that provided suitable habitat for the species prior 
    to the storm may not provide such habitat now. the EIS will examine the 
    consequences of adjusting the boundaries of MA-2 within the Northern 
    Sabine HMA to include about 7,300 additional acres in Compartments 29, 
    35, 36, 45, 46, 47, and 54 to provide suitable habitat for the RCW to 
    meet the population objective.
    
    Public Involvement and Scoping
    
        This environmental analysis and decision-making process will enable
    
    [[Page 15342]]
    
    interested and affected people to participate and contribute to the 
    final decision. Public participation will begin with the publication of 
    this NOI. Interested and affected individuals and organizations on each 
    affected forest scoping list will be informed of the proposal and 
    invited to submit comments. The Forest Service will also be seeking 
    information, comments, and assistance from Federal, state, and local 
    agencies. The information received will be used in the preparation of 
    the draft and final EIS. At this time no scoping meetings are scheduled 
    to be held to discuss the project. The scoping process includes:
        1. Identifying potential issues.
        2. Identifying issues to be analyzed in depth.
        3. Eliminating non-significant issues or those which have been 
    covered by a relevant previous environmental process.
        4. Exploring additional alternatives.
        5. Identifying potential environmental effects of the proposed 
    action and alternatives (i.e. direct, indirect, and cumulative 
    effects).
    
    Preliminary Issues
    
        Several preliminary issues have been identified by the Forest 
    Service. The issues are briefly described below:
        Red-cockaded woodpecker--the storm adversely affected RCW habitat. 
    What effect will reforestation activities have on habitat suitable for 
    RCW foraging and nesting and the potential for RCW population growth in 
    the short and long term?
        Hardwoods--many hardwoods remain in the damaged areas. What effect 
    would project activities have on the current and future hardwood 
    composition of the storm-damaged areas? Will any areas be managed for 
    pine-hardwood mixtures or only for hardwoods within the storm-affected 
    areas?
        Soil productivity--mechanical equipment used in site preparation 
    could compact soils and prescribed fire could affect nutrient 
    availability. What effect will mechanical site preparation and 
    prescribed burning have on long-term soil productivity?
        Water quality--site preparation activities could expose soil to 
    erosion. What effects will mechanical site preparation and prescribed 
    burning have on soil erosion and sedimentation?
        Potential Alternatives: based on the preliminary issues, the 
    following potential alternative themes have been identified:
        No Action--no site preparation or planting activities would occur, 
    nor would acreage adjustments be made to the Northern Sabine HMA. Only 
    natural regeneration would be allowed in the damaged areas.
        Limited Budget Theme--maintain the existing Northern Sabine HMA and 
    maximize the pine regeneration if damaged areas within the HMA 
    regardless of ECS considerations. Mechanical site preparation would be 
    minimized and natural regeneration would be emphasized.
    
    Reviewers Obligations
    
        The Forest Service believes, at this early stage, it is important 
    to give reviewers notice of several court rulings related to public 
    participation in the environmental review process. First, reviewers of 
    draft EISs must structure their participation in the environmental 
    review of the proposal so that it is meaningful and alerts an agency to 
    the reviewer's position and contentions. Vermont Yankee Nuclear Power 
    Corp. v. NRDC, 435 U.S. 519, 553 (1978). Also, environmental objections 
    that could be raised at the draft EIS stage but that are not raised 
    until after completion of the final EIS may be waived or dismissed by 
    the courts. City of Angoon v. Hodel, 803 F.2d 1016, 1022 (9th Cir. 
    1986) and Wisconsin Heritages, Inc. v. Harris, 490 F. Supp. 1334, 1338 
    (E.D. Wis. 1980). Because of these court rulings, it is very important 
    that those interested in this proposed action participate by the close 
    of the draft EIS 45-day coment period so that substantive comments and 
    objections are made available to the Forest Service at a time when it 
    can meaningfully consider them in the final EIS.
        To assist the Forest Service in identifying and considering issues 
    and concerns on the proposed action, comments on the draft EIS should 
    be as specific as possible. It is also helpful if comments refer to 
    specific pages or chapters of the draft statement. Comments may also 
    address the adequacy of the draft EIS of the merits of the alternatives 
    formulated and discussed in the statement. Reviewer may wish to refer 
    to the Council on Environmental Quality Regulations for implementing 
    the procedural provisions of the National Environmental Policy Act at 
    40 CFR 1503.3.
        Comments received in response to this solicitation, including names 
    and addresses of those who comment, will be considered part of the 
    public record on this proposed action and will be available for public 
    inspection. Comments submitted anonymously will be accepted and 
    considered; however, those who submit anonymous comments will not have 
    standing to appeal the subsequent decision under 36 CFR parts 215 or 
    217. Additionally, pursuant to 7 CFR 1.27(d), any person may request 
    the agency to withhold a submission from the public record by showing 
    how the Freedom of Information Act (FOIA) permits such confidentiality. 
    Persons requesting such confidentiality should be aware that, under the 
    FOIA, confidentiality may be granted in only very limited 
    circumstances, such as to protect trade secrets. The Forest Service 
    will inform the requester of the agency's decision regarding the 
    request for confidentiality, and where the request is denied, the 
    agency will return the submission and notify the requester that the 
    comments may be resubmitted with or without name and address within 10 
    days.
    
    Responsible Official
    
        Ronnie Raum, Forest Supervisor; National Forests and Grasslands in 
    Texas; 701 North First Street, Lufkin, TX 75901 is the Responsible 
    Official. As the Responsible Official, I will decide which, if any of 
    the alternatives to be described in the draft Environmental Empact 
    Statement will be implemented. I will document the decision and the 
    reasons for my selection of the decision in the Record of Decision.
    
        Dated: March 25, 1999.
    Ronnie Raum,
    Forest Supervisor.
    [FR Doc. 99-7836 Filed 3-30-99; 8:45 am]
    BILLING CODE 3410-11-M
    
    
    

Document Information

Published:
03/31/1999
Department:
Forest Service
Entry Type:
Notice
Action:
Notice of intent to prepare an Environmental Impact Statement
Document Number:
99-7836
Dates:
Written comments and suggestions concerning the scope of the analysis must be postmarked or received by April 30, 1999. The estimated date for filing the draft EIS is June 1999, followed by the final decision in September 1999.
Pages:
15339-15342 (4 pages)