E9-6749. Airworthiness Directives; Pratt & Whitney (PW) JT9D-7 Series Turbofan Engines  

  • Start Preamble

    AGENCY:

    Federal Aviation Administration (FAA), DOT.

    ACTION:

    Final rule.

    SUMMARY:

    The FAA is adopting a new airworthiness directive (AD) for PW models JT9D-7, -7A, -7AH, -7H, -7F, and -7J turbofan engines. This AD requires initial and repetitive borescope inspections of the 2nd stage high-pressure turbine (HPT) rotor and stator assembly. This AD results from an uncontained failure of a 2nd stage HPT rotor disk that caused the engine to separate from the airplane. We are issuing this AD to prevent failure of the 2nd stage HPT rotor disk, which could result in uncontained engine failure, damage to the airplane, and the engine separating from the airplane.

    DATES:

    This AD becomes effective May 5, 2009. The Director of the Federal Register approved the incorporation by reference of certain publications listed in the regulations as of May 5, 2009.

    ADDRESSES:

    You can get the service information identified in this AD from Pratt & Whitney, 400 Main St., East Hartford, CT 06108; telephone (860) 565-8770; fax (860) 565-4503.

    The Docket Operations office is located at Docket Management Facility, U.S. Department of Transportation, 1200 New Jersey Avenue, SE., West Building Ground Floor, Room W12-140, Washington, DC 20590-0001.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Kevin Dickert, Aerospace Engineer, Engine Certification Office, FAA, Engine and Propeller Directorate, 12 New England Executive Park, Burlington, MA 01803; e-mail: kevin.dickert@faa.gov; telephone (781) 238-7117, fax (781) 238-7199.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The FAA proposed to amend 14 CFR part 39 with a proposed AD. The proposed AD applies to PW models JT9D-7, -7A, -7AH, -7H, -7F, and -7J turbofan engines. We published the proposed AD in the Federal Register on July 10, 2008 (73 FR 39627). That action proposed to require an initial and repetitive borescope inspection of the 2nd stage HPT vane assembly.

    Examining the AD Docket

    You may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Operations office between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains this AD, the regulatory evaluation, any comments received, and other information. The street address for the Docket Operations office (telephone (800) 647-5527) is provided in the ADDRESSES section. Comments will be available in the AD docket shortly after receipt.

    We provided the public the opportunity to participate in the development of this AD. We have considered the comment received.

    One commenter asks us to change the compliance time from “cycles-since-overhaul” to “cycles-since-last installation of the second stage HPT vanes.” The commenter states that second stage HPT vanes might be removed and replaced at times other than module overhaul, such as for module repair.

    We agree. We changed paragraph (f) of the proposed AD from “Within 100 cycles-in-service (CIS) after the effective date of this AD, or within 1,000 CIS after the last HPT module overhaul * * *” to “Within 100 cycles-in-service (CIS) after the effective date of this AD, or within 1,000 CIS after the last installation of the second stage HPT vanes * * *”

    Conclusion

    We have carefully reviewed the available data, including the comment received, and determined that air safety and the public interest require adopting the AD with the changes described previously. We have determined that these changes will neither increase the economic burden on any operator nor increase the scope of the AD.

    Costs of Compliance

    We estimate that this AD will affect 240 engines installed on airplanes of U.S. registry. We also estimate that it will take about 5 work-hours per engine to perform the proposed actions, that each engine might require two inspections, and that the average labor rate is $80 per work-hour. Based on these figures, we estimate the total cost of the AD to U.S. operators to be $192,000.

    Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, Section 106, describes the authority of the FAA Administrator. Subtitle VII, Aviation Programs, describes in more detail the scope of the Agency's authority.

    We are issuing this rulemaking under the authority described in Subtitle VII, Part A, Subpart III, Section 44701, “General requirements.” Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action.

    Regulatory Findings

    We have determined that this AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.

    For the reasons discussed above, I certify that this AD:Start Printed Page 14459

    (1) Is not a “significant regulatory action” under Executive Order 12866;

    (2) Is not a “significant rule” under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and

    (3) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.

    We prepared a summary of the costs to comply with this AD and placed it in the AD Docket. You may get a copy of this summary at the address listed under ADDRESSES.

    Start List of Subjects

    List of Subjects in 14 CFR Part 39

    • Air transportation
    • Aircraft
    • Aviation safety
    • Incorporation by reference
    • Safety
    End List of Subjects

    Adoption of the Amendment

    Start Amendment Part

    Accordingly, under the authority delegated to me by the Administrator, the Federal Aviation Administration amends 14 CFR part 39 as follows:

    End Amendment Part Start Part

    PART 39—AIRWORTHINESS DIRECTIVES

    End Part Start Amendment Part

    1. The authority citation for part 39 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 49 U.S.C. 106(g), 40113, 44701.

    End Authority
    [Amended]
    Start Amendment Part

    2. The FAA amends § 39.13 by adding the following new airworthiness directive:

    End Amendment Part

    2009-04-18 Pratt & Whitney: Amendment 39-15824. Docket No. FAA-2008-0759; Directorate Identifier 2008-NE-02-AD.

    Effective Date

    (a) This airworthiness directive (AD) becomes effective May 5, 2009.

    Affected ADs

    (b) None.

    Applicability

    (c) This AD applies to Pratt & Whitney (PW) JT9D-7, -7A, -7AH, -7H, -7F, and -7J turbofan engines. These engines are installed on, but not limited to, Boeing 747 series airplanes.

    Unsafe Condition

    (d) This AD results from an uncontained failure of a 2nd stage high-pressure turbine (HPT) rotor disk that caused the engine to separate from the airplane. We are issuing this AD to prevent failure of the 2nd stage HPT rotor disk, which could result in uncontained engine failure, damage to the airplane, and the engine separating from the airplane.

    Compliance

    (e) You are responsible for having the actions required by this AD performed within the compliance times specified unless the actions have already been done.

    Initial Borescope Inspection

    (f) Within 100 cycles-in-service (CIS) after the effective date of this AD, or within 1,000 CIS after the last installation of the second stage HPT vanes, whichever occurs later, do the following:

    (1) Use the Accomplishment Instructions of PW Alert Service Bulletin (ASB) JT9D A6488, Revision 1, dated April 18, 2008, to borescope-inspect the 2nd stage HPT rotor and stator assembly either on-wing or in the shop.

    (2) If you see any damage or contact between the 2nd stage HPT vanes and the 2nd stage HPT rotor, remove the engine from service.

    Repetitive Borescope Inspection

    (g) Thereafter, within 1,000 cycles-since-last inspection, do the following:

    (1) Use the Accomplishment Instructions of PW ASB JT9D A6488 Revision 1, dated April 18, 2008, to borescope-inspect the 2nd stage HPT rotor and stator assembly either on-wing or in the shop.

    (2) If you see any damage or contact between the 2nd stage HPT vanes and the 2nd stage HPT rotor, remove the engine from service.

    Optional Terminating Action

    (h) Installing the 2nd stage HPT vanes as specified in paragraphs 1.B.(1) through 1.B.(32) of the JT9D-7 Engine Manual Revision 122, dated February 15, 2008, terminates the repetitive inspection requirement specified in paragraph (g) of this AD.

    Alternative Methods of Compliance

    (i) The Manager, Engine Certification Office, has the authority to approve alternative methods of compliance for this AD if requested using the procedures found in 14 CFR 39.19.

    Related Information

    (j) Contact Kevin Dickert, Aerospace Engineer, Engine Certification Office, FAA, Engine and Propeller Directorate, 12 New England Executive Park, Burlington, MA 01803; e-mail: kevin.dickert@faa.gov; telephone (781) 238-7117, fax (781) 238-7199, for more information about this AD.

    Material Incorporated by Reference

    (k) You must use the service information specified in the following Table 1 to perform the actions required by this AD. The Director of the Federal Register approved the incorporation by reference of the documents listed in the following Table 1 in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Contact Contact Pratt & Whitney, 400 Main St., East Hartford, CT 06108; telephone (860) 565-8770; fax (860) 565-4503, for a copy of this service information. You may review copies at the FAA, New England Region, 12 New England Executive Park, Burlington, MA; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/​federal-register/​cfr/​ibr-locations.html.

    Table 1—Incorporation by Reference

    Service information No.PageRevisionDate
    Pratt & Whitney JT9D Engine Maintenance Manual PN 7704081001 through 1036122February 15, 2008.
    Total Pages—36
    Pratt & Whitney PW ASB JT9D A6488, Revision 1, dated April 18, 2008All1April 18, 2008.
    Total Pages—21
    Start Signature
    Start Printed Page 14460

    Issued in Burlington, Massachusetts, on March 17, 2009.

    Francis A. Favara,

    Manager, Engine and Propeller Directorate, Aircraft Certification Service.

    End Signature End Supplemental Information

    [FR Doc. E9-6749 Filed 3-30-09; 8:45 am]

    BILLING CODE 4910-13-P

Document Information

Effective Date:
5/5/2009
Published:
03/31/2009
Department:
Federal Aviation Administration
Entry Type:
Rule
Action:
Final rule.
Document Number:
E9-6749
Dates:
This AD becomes effective May 5, 2009. The Director of the Federal Register approved the incorporation by reference of certain publications listed in the regulations as of May 5, 2009.
Pages:
14458-14460 (3 pages)
Docket Numbers:
Docket No. FAA-2008-0759, Directorate Identifier 2008-NE-02-AD, Amendment 39-15824, AD 2009-04-18
RINs:
2120-AA64: Airworthiness Directives
RIN Links:
https://www.federalregister.gov/regulations/2120-AA64/airworthiness-directives
Topics:
Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety
PDF File:
e9-6749.pdf
CFR: (1)
14 CFR 39.13