SUMMARY:
The Coast Guard is adjusting Great Lakes pilotage rates that were last amended in February 2013. The adjustments establish new base rates, and are made in accordance with a full ratemaking procedure. The Coast Guard is exercising its discretion to establish new base rates to more closely align with recent Canadian rate increases. The final rule also adjusts weighting factors used to determine rates for vessels of different size, adopts a new procedure for temporary surcharges, applies a temporary surcharge for one pilotage association, and allows pilotage associations to recoup the cost of dues paid to the American Pilots Association. This rulemaking promotes the Coast Guard's maritime safety mission.
DATES:
Effective August 1, 2014 except for §§ 401.400 and 401.401 which are effective April 3, 2014.
ADDRESSES:
Comments and material received from the public, as well as documents mentioned in this preamble as being available in the docket, are part of docket USCG-2013-0534 and are available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. You may also find this docket online by going to http://www.regulations.gov and following the instructions on that Web site.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
If you have questions on this rule, call or email Mr. Todd Haviland, Coast Guard; telephone 202-372-2037, email Todd.A.Haviland@uscg.mil. If you have questions on viewing material to the Start Printed Page 12085docket, call Ms. Barbara Hairston, Program Manager, Docket Operations, telephone 202-366-9826.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Table of Contents for Preamble
I. Abbreviations
II. Regulatory History
III. Basis and Purpose
IV. Background
V. Discussion of Comments and Changes
A. AMOU Contracts
B. APA Dues
C. Pilot License Insurance
D. Weighting Factors
E. Surcharges
F. Director Discretion
G. Number of Pilots
H. Ratemaking Methodology
I. Economic Analysis
J. District One Dock
VI. Discussion of Rulemaking
VII. Regulatory Analyses
A. Regulatory Planning and Review
B. Small Entities
C. Assistance for Small Entities
D. Collection of Information
E. Federalism
F. Unfunded Mandates Reform Act
G. Taking of Private Property
H. Civil Justice Reform
I. Protection of Children
J. Indian Tribal Governments
K. Energy Effects
L. Technical Standards
M. Environment
I. Abbreviations
AMOU American Maritime Officers Union
APA American Pilots Association
CFR Code of Federal Regulations
CPA Certified Public Accountant
CPI Consumer price index
DHS Department of Homeland Security
E.O. Executive Order
FR Federal Register
GLPA Great Lakes Pilotage Authority (Canada)
GLPAC Great Lakes Pilotage Advisory Committee
MISLE Marine Information for Safety and Law Enforcement
NAICS North American Industry Classification System
NPRM Notice of proposed rulemaking
OMB Office of Management and Budget
ROI Return on investment
U.S.C. United States Code
II. Regulatory History
On August 8, 2013, we published a notice of proposed rulemaking (NPRM) titled “Great Lakes Pilotage Rates—2014 Annual Review and Adjustment” in the Federal Register (78 FR 48374). We received 11 submissions on the NPRM from multiple sources, including pilotage associations, pilots, pilot organizations, and shippers. No public meeting was requested and none was held.
III. Basis and Purpose
The basis of this rulemaking is the Great Lakes Pilotage Act of 1960 (“the Act”) (46 U.S.C. Chapter 93), which requires U.S. vessels operating “on register” [1] and foreign vessels to use U.S.- or Canadian-registered pilots while transiting the U.S. waters of the St. Lawrence Seaway and the Great Lakes system. 46 U.S.C. 9302(a)(1). The Act requires the Secretary of the department in which the Coast Guard is operating to “prescribe by regulation rates and charges for pilotage services, giving consideration to the public interest and the costs of providing the services.” 46 U.S.C. 9303(f). Rates must be established, or reviewed and adjusted, each year not later than March 1. Base rates must be established by a full ratemaking at least once every 5 years, and in years when base rates are not established, they must be reviewed and, if necessary, adjusted. 46 U.S.C. 9303(f). The Secretary of the Department of Homeland Security's (DHS's) duties and authority under the Act have been delegated to the Coast Guard. DHS Delegation No. 0170.1, paragraph (92)(f). Coast Guard regulations implementing the Act appear in parts 401 through 404 of 46 CFR. Procedures for establishing base rates appear in 46 CFR part 404, Appendix A, and procedures for annual review and adjustment of existing base rates appear in 46 CFR part 404, Appendix C.
The purpose of this rulemaking is to establish new base pilotage rates, using the methodology found in 46 CFR part 404, Appendix A.
IV. Background
The vessels affected by this rulemaking are those engaged in foreign trade upon the U.S. waters of the Great Lakes. United States and Canadian “lakers,” [2] which account for most commercial shipping on the Great Lakes, are not affected. 46 U.S.C. 9302.
The U.S. waters of the Great Lakes and the St. Lawrence Seaway are divided into three pilotage districts. Pilotage in each district is provided by an association certified by the Coast Guard Director of Great Lakes Pilotage (“the Director”) to operate a pilotage pool. It is important to note that, while we set rates, the Coast Guard does not control the actual number of pilots an association maintains. We ensure the association is able to provide safe, efficient, and reliable pilotage service. The Coast Guard also does not control the actual compensation that pilots receive. Each district association determines the actual compensation of its district, and each association uses different compensation practices.
District One, consisting of Areas 1 and 2, includes all U.S. waters of the St. Lawrence River and Lake Ontario. District Two, consisting of Areas 4 and 5, includes all U.S. waters of Lake Erie, the Detroit River, Lake St. Clair, and the St. Clair River. District Three, consisting of Areas 6, 7, and 8, includes all U.S. waters of the St. Mary's River, Sault Ste. Marie Locks, and Lakes Michigan, Huron, and Superior. Area 3 is the Welland Canal, which is serviced exclusively by the Canadian Great Lakes Pilotage Authority (GLPA), and accordingly is not included in the U.S. rate structure. Areas 1, 5, and 7 have been designated by Presidential Proclamation, pursuant to the Act, to be waters in which pilots must, at all times, be fully engaged in the navigation of vessels in their charge. Areas 2, 4, 6, and 8 have not been so designated because they are open bodies of water. While working in those undesignated areas, pilots must only “be on board and available to direct the navigation of the vessel at the discretion of and subject to the customary authority of the master.” 46 U.S.C. 9302(a)(1)(B).
The last full ratemaking established the current base rates in 2013 (78 FR 13521, Feb. 28, 2013), using the ratemaking methodology described in 46 CFR part 404, Appendix A. Among other things, the Appendix A methodology requires us to review detailed pilotage association financial information, and we contract with independent accountants to assist in that review.
We opened this year's ratemaking with an NPRM (78 FR 48374, Aug. 8, 2013) that reflected financial data for the 2011 shipping season, and that the proposed new base rates be calculated in accordance with the Appendix A methodology.
V. Discussion of Comments and Changes
We received 11 public submissions in response to our NPRM. Eight of those submissions came from pilotage associations, pilots, and pilot organizations; two came from groups that represent shippers who use Great Lakes pilotage service; and one came from the union whose contracts provide benchmark data for Great Lakes pilotage ratemaking.Start Printed Page 12086
A. AMOU Contracts
Seven commenters—six pilots or pilot representatives, and the American Maritime Officers Union (AMOU)—addressed our use of AMOU contracts to estimate the average annual compensation for masters and first mates on U.S. Great Lakes vessels, in accordance with Step 2.A of our Appendix A ratemaking methodology.
Many of these commenters took issue with the NPRM's statement, 78 FR 48374 at 48376, col. 2, that recent AMOU contracts are marked by “downward changes,” and pointed out that AMOU contracts actually increase wages over a 5-year period. Our discussion is not a reflection on AMOU contract trends, but rather emphasizes that AMOU contract information, when factored into our Appendix A ratemaking methodology, could lead to a pilotage rate decrease, if not offset by the application of discretion under Step 7 of Appendix A.
The six pilot/pilot representative commenters said we had incorrectly interpreted or misapplied AMOU contract data. A registered lobbyist representing all three pilotage associations said we should have used the daily aggregate rate information included in an AMOU letter dated November 2, 2012, and further claimed that we based our calculations on “wrong multipliers.”
We reject each of these assertions and confirm the accuracy of the figures given in our NPRM. The assertion of the registered lobbyist that we should have used data from the November 2, 2012 AMOU letter is unfounded. Prior to publication of the NPRM, the AMOU provided and confirmed contract data to us on four separate occasions in 2012: On November 2, November 15, December 5, and December 17. The first communication on November 2 (the letter referenced by the registered lobbyist) provided information on wages and benefits but was marked “proprietary,” and therefore has not been and cannot be shared by the Coast Guard with the public. Because Coast Guard could not share the component data, Coast Guard and AMOU agreed that AMOU would provide daily aggregate data. The November 15 and December 5 letters provided information on 2013, 2014 and 2015 daily aggregate (wage and benefit) rates for Agreement A and Agreement B, respectively. The letters indicated that the daily aggregate rates would increase by 3% each year. On December 17, 2012, we emailed a table of the aggregate rate data that we planned to use in the NPRM, and in response, the AMOU promptly emailed: “This table and only this table is acceptable to AMO[U].” That table's data, with 3% added in accordance with AMOU's correspondence, is what we presented in Table 11 of our NPRM, 78 FR at 48382. Multipliers are only used if we can site individual components of compensation in our calculations. Because our calculations were based only on the aggregate data shown in the table, they are not affected by “wrong multipliers.”
In its October 4, 2013 comment on the NPRM, the AMOU offered “correct” daily aggregate rates that differ significantly from the figures in the table the AMOU confirmed as “acceptable” on December 17, 2012. The AMOU comment reflects a “season bonus” that the AMOU has not previously cited as part of its contracts, and that we do not recognize for purposes of Great Lakes pilotage compensation. 46 CFR 404.5(a). As a disinterested third party to our ratemakings, the AMOU is under no obligation to share contract information with us. The AMOU has not provided a copy of the contracts nor agreed to allow us to review them. This compromises our ability to use that data in a transparent way and prohibits us from evaluating the individual components for compensation. We are investigating alternatives to using AMOU contract data for our ratemaking purposes.
B. APA Dues
Four commenters addressed our proposed inclusion in the ratemaking calculations of dues for pilotage association membership in the American Pilots Association (APA). Three pilot representatives favored inclusion. One shipping industry commenter said that APA membership is voluntary, and therefore should not be included. We consider the APA to play a key role in ensuring our mutual goals of safe, efficient, and reliable pilotage on the Great Lakes. The APA has assisted the three pilotage associations with professional development and training plans, and we believe the APA is a critical resource for the pilotage associations in spreading best practices throughout the pilotage profession. Therefore, we continue to find that APA dues are a necessary and reasonable expense of the pilotage associations. One pilotage association said we had incorrectly calculated its APA dues. The St. Lawrence Seaway Pilots' Association contends that APA dues paid by the organization were actually $27,730. We disagree. Much of the amount asserted by the association is for lobbying expenses that are not eligible to be included in the rate. However, a review of the financial statements approved by the pilotage association shows dues paid to the APA in the amount of $22,720. Accordingly we updated the necessary tables to include this amount, an addition to the expense base of $4,360. However, because of our Step 7 discretion, this change to the underlying data does not impact the final rate.
C. Pilot License Insurance
One pilotage association commented that we failed to include the amount that the association paid for pilot license insurance in our calculations. This is incorrect. The association requested a change in reporting that moved license insurance from an operating expense to an employee benefit. The association again approved the change when they were given the opportunity to comment on the reports prepared by the auditors. Benefits are considered part of compensation, and are not allowed to be included separately in the rate. However, because we have historically included license insurance as an allowable expense, and because both of the other pilotage associations include license insurance as an allowable expense, we will allow inclusion of the 2011 license insurance cost ($52,232) in the expense base of the association. Again, because of our exercise of Step 7 discretion in this rulemaking, this change to the expense base does not alter the final rate.
D. Weighting Factors
Five commenters addressed our proposal to match U.S. weighting factors to those used by Canada. All were in favor of this proposal, but one pilotage association said we overestimated the beneficial impact, for pilots, of adjusting weighting factors (see the NPRM, 78 FR 48376). One pilot commented that it is unfair of us not to apply a retroactive rate adjustment recognizing the 6 years during which the U.S. weighting factors differed from those used by Canada. We think the association based its lower estimate on its local data, not on data for the Great Lakes as a whole. We stand by our estimate of the beneficial impact of the adjustment.
E. Surcharges
Two pilot representatives and two representatives of shippers commented on our proposal to allow establishment of temporary surcharges. The pilot representatives supported the proposal. One of the shipper representatives said our proposal was too vague and that surcharges could have a damaging economic impact, and the other said it Start Printed Page 12087is unnecessary because the Director of Great Lakes Pilotage already has sufficient authority to make discretionary rate adjustments. We think the proposal is sufficiently clear, and this final rule adopts it. Whether any given surcharge will have a damaging economic impact can be the subject of public comment, an opportunity for which will be given each time we propose a surcharge. While it is true that the Director has substantial authority to make discretionary rate adjustments, we believe that the surcharge mechanism is preferable because it provides more regulatory transparency.
F. Director Discretion
Our regulations found in 46 CFR 404.10(a) give the Director of Great Lakes Pilotage discretionary authority to determine what “other circumstances” beyond those listed in the Appendix A ratemaking methodology might need to be factored into ratemaking calculations. Two shipper representatives and one pilot representative commented on the Director's exercise of this discretionary authority. The pilot representative commented the latitude of the Director's discretion to modify rates as calculated by the Appendix A methodology is “troubling.” One of the shipper representatives commented that the apparent need for the Director to exercise this discretion indicates there is something “definitely wrong” with the methodology given that the calculated rates and the rates that were actually implemented are drastically different. We agree with both commenters. Our concerns about possible flaws in the Appendix A methodology led us to commission the comprehensive study of that methodology, which a contractor recently completed for the Coast Guard. The recommendations from that study will be addressed in a future rulemaking.
Separately, another shipper representative commented that the Director's proposed discretionary adjustment of rate calculations to increase rates would have a “damaging economic impact.” We disagree. Pilotage charges in U.S. waters of the Great Lakes remain below the charges (including temporary surcharges) that apply in Canadian waters. We know of no evidence that U.S. pilotage rates are driving traffic away from the Great Lakes. We plan to exercise the Director's authority in future rulemakings until the methodology is updated. We will use the surcharges to accelerate certain expenses as previously discussed. Until we are able to obtain an audit of the revenues by an independent third party, we will rely upon inflation and the consumer price index (CPI) for the Midwest to guide our ratemaking adjustments. If the revenue audit reveals a significant revenue gap between the projected revenues and the actual revenues recovered by the rate, we will work with the stakeholders through the Great Lakes Pilotage Advisory Committee (GLPAC) and exercise our discretion to address the gap.
G. Ratemaking Methodology
Four pilot representatives and one shipper representative commented on our ratemaking methodology. Three pilot representatives commented that we should use a multi-year inflation factor to compensate for the time value of money between the time the audits are conducted and the rate is established (for the 2014 NPRM, we proposed to use 2011 data that was audited in 2012). Under Step 1.C of the Appendix A ratemaking methodology, the ratemaking adjustment for inflation or deflation is a one-year adjustment between the reported year (2011) and the “succeeding navigation season” (2012). We are therefore unable to make a multi-year adjustment under the current methodology; however, we acknowledge the pilots' concern and will consider altering the inflation/deflation adjustment mechanism in a future rulemaking.
A pilot and a pilot representative reiterated the pilots' long-held contention (see the 2013 final rule, 78 FR 13522) that our over-projection of shipping traffic results in an over-projection of pilotage revenue. One of these commenters said that the Coast Guard should ensure that pilots reach target compensation. We agree that traffic projection is an issue that needs to be addressed in a future rulemaking to revise the Appendix A methodology, but we disagree that the Coast Guard should ensure that pilots reach target compensation. The Coast Guard never sets actual compensation; instead, actual compensation is handled differently by the three private pilotage associations. Due to the inherent risk in operating a private business, we cannot guarantee compensation for any of the associations.
A pilot commented that, under the 1977 Memorandum of Agreement between the United States and Canada, U.S. pilotage rates must be identical to Canadian rates. He said that while our proposed 2.5 percent rate increase matches the latest Canadian increase, the two rate structures are not identical. While it is true that the 1977 agreement does require “identical” rates, in practice the two pilotage systems are so differently structured that it has not been possible to set identical rates since the early 1980s. A new memorandum has been signed and will replace the 1977 agreement. It calls for “comparable” rates. We believe that, after accounting for the structural differences in U.S. and Canadian Great Lakes pilotage systems, the two rate structures are comparable.
The same commenter reiterated the pilots' long-held contention (see the 2010 final rule, 75 FR 7959, Feb. 23, 2010) that we incorrectly calculate the application of benefits to the AMOU contracts in setting rates for designated waters, and that we should instead multiply both the average first mate wages and benefits by 150 percent to approximate a master's compensation. Our position continues to be that, under Step 2.A of the Appendix A methodology, the 150 percent is applied only to wages; benefits are then added to the result. As previously mentioned, we are evaluating if there are alternatives to using AMOU contract data for our ratemaking purposes.
Finally, the same commenter contends that we should allow a higher return on investment (ROI) than the average rate for Moody's AAA high grade corporate securities, given the degree of risk that pilots run. We have correctly calculated the ROI, in accordance with Step 5 of the Appendix A methodology, which requires us to tie ROI to the “preceding year's average rate of return for new issues of high grade corporate securities.” We may revise our ROI calculations as part of a comprehensive revision of Appendix A.
The shipper representative suggested that our NPRM's Appendix A calculations, resulting in a pre-discretion-adjusted 11 percent rate decrease, may demonstrate that U.S. Great Lakes pilots are at least adequately compensated, and perhaps overcompensated by regional standards. We disagree. As we discussed at length in the NPRM (78 FR 48389), the pre-adjustment calculations are due to changes in benchmark AMOU contracts rather than to any changes in Great Lakes pilotage as such, and we think it would be contrary to the public interest to decrease pilotage rates as a result of this year's calculations. Additionally, incorporating these compensation changes would result in a target pilot compensation significantly lower than Canadian Great Lakes-registered pilots. We believe this is also contrary to the public interest. We intend to address this inequity in target pilot compensation in a future rulemaking. We believe the proper benchmark for target pilot compensation of U.S. Great Start Printed Page 12088Lakes registered pilots should be comparable to the compensation of Canadian Great Lakes registered pilots.
H. Economic Analysis
A pilot commented that footnote 5 to our NPRM (78 FR 48391) “defies common sense.” The footnote states that despite increasing pilotage rates, “we estimate a net cost savings across all three districts as a result of an expected decrease in the demand for pilotage services from the previous year.” Although we agree with the commenter that the reduction in payments accrued by shippers in Districts Two and Three are not a result of the Coast Guard's proposed rate changes to pilotage services, but instead are the result of changes in market conditions, the economic impact to industry presented in the NPRM remains unchanged because these market conditions were factored into our analysis; the aggregate reduction in payments by shippers across all three districts is not expected to jeopardize the ability of the three pilotage associations to provide safe, efficient, and reliable pilotage services.
I. Number of Pilots
The District Two pilotage association requested immediate authorization for an additional pilot in light of the impending retirement of current pilots in that district. We agree that the district should plan for these expected retirements, but we do not think that requires the immediate authorization of an additional billet. However, the unforeseen potential medical disability of another pilot in the district compounds the difficulty of resourcing new pilots to replace those retiring. Because investing in the training, recruitment and resourcing of pilots is necessary to promote safe, efficient and reliable pilotage, we will, in accordance with our new surcharge authority, consider proposing, for public comment, a surcharge for District Two to cover the cost of training and resourcing a new pilot in our 2015 ratemaking NPRM.
J. District One Dock
The District One pilotage association said that our rates have not enabled them to recover approximately $21,345 spent on a dock project, because their actual revenue fell short of our projections. We agree that $21,345 is a substantial shortfall relating to a capital expenditure made in the interest of safety. We have not validated the existence and/or magnitude of the alleged gap between projected and actual revenues, because the methodology does not consider actual revenues to set rates. Therefore, we believe any discussion related to closing a gap between projected and actual revenues should be addressed by the GLPAC.[3] We defer action on this request until we hear from the advisory committee regarding this specific request at the next GLPAC meeting in 2014. We will then address this in the next annual ratemaking NPRM for the 2015 shipping season.
VI. Discussion of Rulemaking
A. Summary
As required by 46 U.S.C. 9303(f), we are establishing new base pilotage rates by the March 1, 2014 statutory deadline. The rates are established in accordance with the Appendix A methodology and will take effect on August 1, 2014. The rates reflect our determination that 85 percent of the dues paid by the pilotage associations to the APA is recognizable expenses under 46 CFR 404.5 (the remaining 15 percent represents lobbying expenses, which are not recognizable expenses). Our arithmetical calculations under Steps 1 through 6 of Appendix A would result in an average 10.28 percent rate decrease. This rate decrease is not the result of increased efficiencies in providing pilotage services, but rather is a result of recent changes in benchmark AMOU contracts. Therefore, we are exercising our discretion under Appendix A, Step 7 to more closely align with the recent Canadian rate adjustment, and therefore rates in Districts One, Two and Three will increase by 2.5 percent.
On April 3, 2014, we are adjusting the U.S. weighting factors in 46 CFR 401.400 to match the weighting factors adopted by Canada in 2008, as recommended unanimously by the GLPAC in Resolution 13-01 in February 2013. Weighting factors are multipliers based on the size of a ship and are used in determining actual charges for pilotage service. Matching the Canadian weighting factors provides greater parity between the U.S. and Canada, and should reduce billing confusion between the two countries. These are important Federal Government concerns, as emphasized by recent Executive Order (E.O.) 13609, “Promoting International Regulatory Cooperation” (77 FR 26413, May 4, 2012). In our NPRM, we proposed making this change effective on March 1, 2014, but for reasons of administrative convenience we have now determined that the change should take effect after the usual 30-day waiting period provided by the Administrative Procedure Act (5 U.S.C. 553(d)).
Also, effective April 3, 2014, we are adding new 46 CFR 401.401, allowing authorization of temporary surcharges in the interest of safe, efficient, and reliable pilotage. The Director of Great Lakes Pilotage authorizes the District One pilotage association to charge a 3 percent surcharge during the 2014 shipping season, effective April 3, 2014, to recoup expenses that the association incurred for training ($48,995).
All figures in the tables that follow in Section B “Discussion of Methodology” are based on calculations performed either by an independent accountant or by the Director's staff. In both cases, those calculations were performed using common commercial computer programs. Decimalization and rounding of the audited and calculated data affects the display in these tables, but does not affect the calculations. The calculations are based on the actual figure that rounds values for presentation in the tables.
B. Discussion of Methodology
The Appendix A methodology provides seven steps, with sub-steps, for calculating rate adjustments. The following discussion describes those steps and sub-steps, and includes tables showing how we applied them to the 2011 financial information supplied by the pilots association.
Step 1: Projection of operating expenses. In this step, we project the amount of vessel traffic annually. Based on that projection, we forecast the amount of necessary and reasonable operating expenses that pilotage rates should recover.
Step 1.A: Submission of financial information. This sub-step requires each pilotage association to provide us with detailed financial information in accordance with 46 CFR part 403. The associations complied with this requirement, supplying 2011 financial information in 2012. This is the most current and complete data set we have available.
Step 1.B: Determination of recognizable expenses. This sub-step requires us to determine which reported association expenses will be recognized for ratemaking purposes, using the guidelines shown in 46 CFR 404.5. We contracted with an independent accountant to review the reported expenses and to submit findings recommending which reported expenses should be recognized. The accountant also reviewed which reported expenses should be adjusted prior to recognition Start Printed Page 12089or disallowed for ratemaking purposes. The accountant's preliminary findings were sent to the pilotage associations; they reviewed and commented on those findings, and the accountant then finalized them. The Director reviewed and accepted the final findings, resulting in the determination of recognizable expenses. Tables 1 through 3 show each association's recognized expenses.
Table 1—Recognized Expenses, District One
Reported expenses for 2011 Area 1 Area 2 Total St. Lawrence River Lake Ontario Operating Expenses: Other Pilotage Costs: Pilot subsistence/Travel $234,724 $156,246 $390,970 License insurance 26,976 25,256 52,232 Payroll taxes 61,483 47,611 109,094 Other 837 588 1,425 Total Other Pilotage Costs 324,020 229,701 553,721 Pilot Boat and Dispatch Costs: Pilot boat expense 111,772 76,904 188,676 Dispatch expense 0 0 0 Payroll taxes 8,611 5,925 14,536 Total Pilot and Dispatch Costs 120,383 82,829 203,212 Administrative Expenses: Legal 10,592 6,922 17,514 Insurance 23,780 16,492 40,272 Employee benefits 21,282 14,645 35,927 Payroll taxes 5,032 3,463 8,495 Other taxes 5,042 3,470 8,512 Travel 756 520 1,276 Depreciation/Auto leasing/Other 38,252 26,319 64,571 Interest 18,484 12,718 31,202 Dues and subscriptions 11,360 11,360 22,720 Utilities 4,314 2,941 7,255 Salaries 50,718 34,897 85,615 Accounting/Professional fees 5,752 3,428 9,180 Pilot Training 4,200 2,277 6,477 Other 9,959 6,880 16,839 Total Administrative Expenses 209,523 146,332 355,855 Total Operating Expenses 653,926 458,862 1,112,788 Adjustments proposed by the Coast Guard's independent certified public accountant (CPA): Operating Expenses: Other Pilot Costs: Pilotage subsistence/Travel (2,492) (1,714) (4,206) Payroll taxes 12,883 8,864 21,747 Total Other Pilotage Costs 10,391 7,150 17,541 TOTAL CPA ADJUSTMENTS 10,391 7,150 17,541 Total Operating Expenses 664,317 466,012 1,130,329 Table 2—Recognized Expenses, District Two
Reported expenses for 2011 Area 4 Area 5 Total Lake Erie Southeast Shoal to Port Huron, MI Operating Expenses: Other Pilotage Costs: Pilot subsistence/Travel $79,250 $118,874 $198,124 License insurance 6,168 9,252 15,420 Payroll taxes 36,676 55,013 91,689 Other 23,560 35,341 58,901 Total Other Pilotage Costs 145,654 218,480 364,134 Pilot Boat and Dispatch Costs: Pilot boat expense 104,955 157,432 262,387 Dispatch expense 6,060 9,090 15,150 Start Printed Page 12090 Employee Benefits 40,419 60,628 101,047 Payroll taxes 7,135 10,703 17,838 Total Pilot and Dispatch Costs 158,569 237,853 396,422 Administrative Expenses: Legal 37,520 56,281 93,801 Office rent 26,275 39,413 65,688 Insurance 10,672 16,009 26,681 Employee benefits 16,365 24,548 40,913 Payroll taxes 4,446 6,668 11,114 Other taxes 14,273 21,409 35,682 Depreciation/Auto leasing/Other 15,604 23,407 39,011 Interest 2,772 4,159 6,931 Dues and subscriptions 7,069 10,603 17,672 Utilities 15,410 23,115 38,525 Salaries 39,874 59,810 99,684 Accounting/Professional fees 12,110 18,164 30,274 Pilot Training 0 0 0 Other 8,860 13,291 22,151 Total Administrative Expenses 211,250 316,877 528,127 Total Operating Expenses 515,473 773,210 1,288,683 Adjustments proposed by the Coast Guard's independent certified public accountant (CPA): Operating Expenses: Other Pilotage Costs: Pilot subsistence/Travel (2,598) (3,896) (6,494) Other (566) (850) (1,416) Total Other Pilotage Costs (3,164) (4,746) (7,910) Pilot Boat and Dispatch Costs: Employee benefits (100) (150) (249) Total Pilot Boat and Dispatch Costs (100) (150) (249) Administrative Expenses: Employee benefits (25) (38) (63) Total Administrative Expenses (25) (38) (63) TOTAL CPA ADJUSTMENTS (3,289) (4,933) (8,222) Total Operating Expenses 512,184 768,277 1,280,461 Table 3—Recognized Expenses, District Three
Reported expenses for 2011 Area 6 Area 7 Area 8 Total Lakes Huron and Michigan St. Mary's River Lake Superior Operating Expenses: Other Pilotage Costs: Pilot subsistence/Travel $196,529 $72,789 $94,625 $363,943 License insurance 10,157 3,762 4,891 18,810 Payroll taxes 63,803 23,631 30,720 118,153 Other 2,184 809 1,052 4,045 Total Other Pilotage Costs 272,673 100,991 131,288 504,951 Pilot Boat and Dispatch Costs: Pilot boat expense 243,077 90,028 117,037 450,142 Dispatch expense 87,059 32,244 41,917 161,221 Payroll taxes 9,607 3,558 4,626 17,791 Total Pilot Boat and Dispatch Costs 339,743 125,830 163,580 629,154 Administrative Expenses: Legal 12,188 4,495 5,844 22,477 Office rent 5,346 1,980 2,574 9,900 Insurance 7,451 2,760 3,587 13,798 Start Printed Page 12091 Employee benefits 73,230 27,122 35,259 135,611 Payroll taxes 6,154 2,279 2,963 11,396 Other taxes 19,339 7,163 9,311 35,813 Depreciation/Auto leasing 34,341 12,719 16,534 63,594 Interest 2,682 993 1,291 4,966 Dues and subscriptions 11,016 5,508 7,344 23,868 Utilities 19,723 7,305 9,496 36,524 Salaries 55,772 20,656 26,853 103,281 Accounting/Professional fees 13,419 4,970 6,461 24,850 Pilot Training 516 191 248 955 Other 5,394 1,998 2,597 9,989 Total Administrative Expenses 266,521 100,139 130,362 497,022 Total Operating Expenses 878,937 326,960 425,230 1,631,127 Adjustments proposed by the Coast Guard's independent certified public accountant (CPA): Operating Expenses: Other Pilotage Costs: Payroll taxes 22,446 8,313 10,807 41,566 Total Other Pilotage Costs 22,446 8,313 10,807 41,566 Administrative Expenses: Other Taxes (1,613) (598) (777) (2,988) Depreciation/Auto leasing (7,707) (2,854) (3,711) (14,272) Other (610) (226) (294) (1,130) Total Administrative Expenses (9,930) (3,678) (4,782) (18,390) TOTAL CPA ADJUSTMENTS 12,516 4,635 6,025 23,176 Total Operating Expenses 891,453 331,595 431,255 1,654,303 Step 1.C: Adjustment for inflation or deflation. In this sub-step, we project rates of inflation or deflation for the succeeding navigation season. Because we used 2011 financial information, the “succeeding navigation season” for this ratemaking is 2012. We based our inflation adjustment of 2 percent on the 2012 change in the CPI for the Midwest Region of the United States, which can be found at: http://www.bls.gov/xg_shells/ro5xg01.htm. This adjustment appears in Tables 4 through 6.
Table 4—Inflation Adjustment, District One
Reported expenses for 2011 Area 1 Area 2 Total St. Lawrence River Lake Ontario Total Operating Expenses: $664,317 $466,012 $1,130,329 2012 change in the CPI for the Midwest Region of the United States × .02 × .02 × .02 Inflation Adjustment = 13,286 = 9,320 = 22,607 Start Printed Page 12092Table 5—Inflation Adjustment, District Two
Reported expenses for 2011 Area 4 Area 5 Total Lake Erie Southeast Shoal to Port Huron, MI Total Operating Expenses: $512,184 $768,277 $1,280,461 2012 change in the CPI for the Midwest Region of the United States × .02 × .02 × .02 Inflation Adjustment = 10,244 = 15,366 = 25,609 Table 6—Inflation Adjustment, District Three
Reported expenses for 2011 Area 6 Area 7 Area 8 Total Lakes Huron and Michigan St. Mary's River Lake Superior Total Operating Expenses: $891,453 $331,595 $431,255 $1,654,303 2012 change in the CPI for the Midwest Region of the United States × .02 × .02 × .02 × .02 Inflation Adjustment = 17,829 = 6,632 = 8,625 = 33,086 Step 1.D: Projection of operating expenses. In this final sub-step of Step 1, we project the operating expenses for each pilotage area on the basis of the preceding sub-steps and any other foreseeable circumstances that could affect the accuracy of the projection. We are not aware of any such foreseeable circumstances that now exist in District One.
For District One, the projected operating expenses are based on the calculations from Steps 1.A through 1.C. Table 7 shows these projections.
Table 7—Projected operating expenses, District One
Reported expenses for 2011 Area 1 Area 2 Total St. Lawrence River Lake Ontario Total Operating Expenses: $664,317 $466,012 $1,130,329 Inflation adjustment 2.0% + 13,286 + 9,320 + 22,607 Total projected expenses for 2014 pilotage season = 677,603 = 475,332 = 1,152,936 In District Two, Federal taxes of $12,000 are accounted for in Step 6 (Federal Tax Allowance). The projected operating expenses are based on the calculations from Steps 1.A through 1.C and Federal taxes. Table 8 shows these projections.
Table 8—Projected Operating Expenses, District Two
Reported expenses for 2011 Area 4 Area 5 Total Lake Erie Southeast Shoal to Port Huron, MI Total Operating Expenses $512,184 $768,277 $1,280,461 Inflation adjustment 2.0% + 10,244 + 15,366 + 25,609 Director's adjustment & foreseeable circumstances Federal taxes (accounted for in Step 6) + (4,800) + (7,200) + (12,000) Total projected expenses for 2014 pilotage season = 517,627 = 776,442 = 1,294,070 Currently, we are not aware of any foreseeable circumstances for District Three. Its projected operating expenses are based on the calculations from Steps 1.A through 1.C. Table 9 shows these projections.
Table 9—Projected Operating Expenses, District Three
Reported expenses for 2011 Area 6 Area 7 Area 8 Total Lakes Huron and Michigan St. Mary's River Lake Superior Total Expenses $891,453 $331,595 $431,255 $1,654,303 Inflation adjustment 2.0% + 17,829 + 6,632 + 8,625 + 33,086 Total projected expenses for 2014 pilotage season = 909,282 = 338,227 = 439,880 = 1,687,389 Step 2: Projection of target pilot compensation. In Step 2, we project the annual amount of target pilot compensation that pilotage rates should provide in each area. These projections are based on our latest information on the conditions that will prevail in 2014.
Step 2.A: Determination of target rate of compensation. Target pilot compensation for pilots in undesignated waters approximates the average annual compensation for first mates on U.S. Great Lakes vessels. Compensation is determined based on the most current union contracts and includes wages and benefits received by first mates. We calculate target pilot compensation for Start Printed Page 12093pilots on designated waters by multiplying the average first mate's wages by 150 percent and then adding the average first mate's benefits.
The most current union contracts available to us are AMOU contracts with three U.S. companies engaged in Great Lakes shipping. There are two separate AMOU contracts available—we refer to them as Agreements A and B, and apportion the compensation provided by each agreement according to the percentage of tonnage represented by companies under each agreement. Agreement A applies to vessels operated by Key Lakes, Inc., and Agreement B applies to all vessels operated by American Steamship Co. and Mittal Steel USA, Inc.
Agreements A and B both expire on July 31, 2016. The AMOU has set the daily aggregate rate—including the daily wage rate, vacation pay, pension plan contributions, and medical plan contributions effective August 1, 2014 as follows: 1) In undesignated waters, $612.20 for Agreement A and $604.64 for Agreement B; and 2) In designated waters, $842.63 for Agreement A and $829.40 for Agreement B.
Because we are interested in annual compensation, we must convert these daily rates. We use a 270-day multiplier which reflects an average 30-day month, over the 9 months of the average shipping season. Table 10 shows our calculations using the 270-day multiplier.
Table 10—Projected Annual Aggregate Rate Components
Aggregate Rate-Wages, Vacation, Pension, and Medical Benefits Pilots on Undesignated Waters Agreement A: $612.20 daily rate × 270 days $165,294.00 Agreement B: $604.64 daily rate × 270 days 163,252.80 Pilots on Designated Waters Agreement A: $842.63 daily rate × 270 days 227,510.10 Agreement B: $829.40 daily rate × 270 days 223,938.00 We apportion the compensation provided by each agreement according to the percentage of tonnage represented by companies under each agreement. Agreement A applies to vessels operated by Key Lakes, Inc., representing approximately 30 percent of tonnage, and Agreement B applies to all vessels operated by American Steamship Co. and Mittal Steel USA, Inc., representing approximately 70 percent of tonnage. Table 11 provides details.
Table 11—Shipping Tonnage Apportioned by Contract
Company Agreement A Agreement B American Steamship Company 815,600 Mittal Steel USA, Inc 38,826 Key Lakes, Inc 361,385 Total tonnage, each agreement 361,385 854,426 Percent tonnage, each agreement 361,385 ÷ 1,215,811 = 29.7238% 854,426 ÷ 1,215,811 = 70.2762% We use the percentages from Table 11 to apportion the projected compensation from Table 10. This gives us a single tonnage-weighted set of figures. Table 12 shows our calculations.
Table 12—Tonnage-Weighted Wage and Benefit Components
Undesignated waters Designated waters Agreement A: Total wages and benefits $165,294.00 $227,510.10 Percent tonnage × 29.7238% × 29.7238% Total = 49,132 = 67,625 Agreement B: Total wages and benefits 163,252.80 223,938.00 Percent tonnage × 70.2762% × 70.2762% Total = 114,728 = 157,375 Projected Target Rate of Compensation: Agreement A total weighted average wages and benefits 49,132 67,625 Agreement B total weighted average wages and benefits + 114,728 + 157,375 Start Printed Page 12094 Total = 163,860 = 225,000 Step 2.B: Determination of the number of pilots needed. Subject to adjustment by the Director to ensure uninterrupted service or for other reasonable circumstances, we determine the number of pilots needed for ratemaking purposes in each area by dividing projected bridge hours for each area, by either 1,000 (designated waters) or 1,800 (undesignated waters) bridge hours. We round the mathematical results and express our determination as whole pilots.
“Bridge hours are the number of hours a pilot is aboard a vessel providing basic pilotage service.” (46 CFR part 404, Appendix A, Step 2.B(1)) For that reason, and as we explained most recently in the 2011 ratemaking's final rule (see 76 FR 6352, Feb. 4, 2011), we do not include, and have never included, pilot delay, detention, or cancellation in calculating bridge hours. Projected bridge hours are based on the vessel traffic that pilots are expected to serve. We use historical data, input from the pilots and industry, periodicals and trade magazines, and information from conferences to project demand for pilotage services for the coming year.
In our 2013 final rule, we determined that 38 pilots would be needed for ratemaking purposes. We have determined that District 3 has two excess billets that remain unfilled and that current and projected traffic levels do not support the retention of these unfilled billets. For 2014, we project 36 pilots is the proper number to use for ratemaking purposes. We are removing one pilot from each of the undesignated waters of District Three (one each from Area 6 and Area 8). The total pilot authorization strength includes five pilots in Area 2, where rounding up alone would result in only four pilots. For the same reasons we explained at length in the 2008 ratemaking final rule (see 74 FR 22221-22, Jan. 5, 2009), we determined that this adjustment is essential for ensuring uninterrupted pilotage service in Area 2. Table 13 shows the bridge hours we project will be needed for each area and our calculations to determine the number of whole pilots needed for ratemaking purposes.
Table 13—Number of Pilots Needed
Pilotage area Projected 2014 bridge hours Divided by 1,000 (designated waters) or 1,800 (undesignated waters) Calculated value of pilot demand Pilots needed (total = 36) Area 1 (Designated waters) 5,116 ÷ 1,000 = 5.116 6 Area 2 (Undesignated waters) 5,429 ÷ 1,800 = 3.016 5 Area 4 (Undesignated waters) 5,814 ÷ 1,800 = 3.230 4 Area 5 (Designated waters) 5,052 ÷ 1,000 = 5.052 6 Area 6 (Undesignated waters) 9,611 ÷ 1,800 = 5.339 6 Area 7 (Designated waters) 3,023 ÷ 1,000 = 3.023 4 Area 8 (Undesignated waters) 7,540 ÷ 1,800 = 4.189 5 Step 2.C: Projection of target pilot compensation. In Table 14, we project total target pilot compensation separately for each area by multiplying the number of pilots needed in each area, as shown in Table 13, by the target pilot compensation shown in Table 12.
Table 14—Projection of Target Pilot Compensation by Area
Pilotage area Pilots needed (total = 36) Target rate of pilot compensation Projected target pilot compensation Area 1 (Designated waters) 6 x $225,000 = $1,349,999 Area 2 (Undesignated waters) 5 × 163,860 = 819,298 Area 4 (Undesignated waters) 4 × 163,860 = 655,438 Area 5 (Designated waters) 6 × 225,000 = 1,349,999 Area 6 (Undesignated waters) 6 × 163,860 = 983,157 Area 7 (Designated waters) 4 × 225,000 = 899,999 Area 8 (Undesignated waters) 5 × 163,860 = 819,298 Steps 3 and 3.A: Projection of revenue. In Steps 3 and 3.A., we project the revenue that would be received in 2014 if demand for pilotage services matches the bridge hours we projected in Table 13, and if 2013 pilotage rates are left unchanged. Table 15 shows this calculation.Start Printed Page 12095
Table 15—Projection of Revenue by Area
Pilotage area Projected 2014 bridge hours 2013 Pilotage rates * Revenue projection for 2014 Area 1 (Designated waters) 5,116 × $460.97 = $2,358,327 Area 2 (Undesignated waters) 5,429 × 284.84 = 1,546,373 Area 4 (Undesignated waters) 5,814 × 205.27 = 1,193,426 Area 5 (Designated waters) 5,052 × 508.91 = 2,571,038 Area 6 (Undesignated waters) 9,611 × 199.95 = 1,921,756 Area 7 (Designated waters) 3,023 × 482.94 = 1,459,929 Area 8 (Undesignated waters) 7,540 × 186.67 = 1,407,490 Total 12,458,339 * Projected 2013 revenue divided by projected 2013 bridge hours, per area. Step 4: Calculation of investment base. In this step, we calculate each association's investment base, which is the recognized capital investment in the assets employed by the association required to support pilotage operations. This step uses a formula set out in 46 CFR part 404, Appendix B. The first part of the formula identifies each association's total sources of funds. Tables 16 through 18 follow the formula up to that point.
Table 16—Total Sources of Funds, District One
Area 1 Area 2 Recognized Assets: Total Current Assets $669,895 $460,921 Total Current Liabilities − 54,169 − 37,271 Current Notes Payable + 24,746 + 17,026 Total Property and Equipment (Net) + 369,024 + 253,907 Land − 13,054 − 8,981 Total Other Assets + 0 + 0 Total Recognized Assets: = 996,442 = 685,602 Non-Recognized Assets: Total Investments and Special Funds + 6,243 + 4,295 Total Non-Recognized Assets: = 6,243 = 4,295 Total Assets: Total Recognized Assets 996,442 685,602 Total Non-Recognized Assets + 6,243 + 4,295 Total Assets: = 1,002,685 = 689,897 Recognized Sources of Funds: Total Stockholder Equity 647,677 445,633 Long-Term Debt + 318,571 + 219,193 Current Notes Payable + 24,746 + 17,026 Advances from Affiliated Companies + 0 + 0 Long-Term Obligations—Capital Leases + 0 + 0 Total Recognized Sources: = 990,994 = 681,852 Non-Recognized Sources of Funds: Pension Liability 0 0 Other Non-Current Liabilities + 0 + 0 Deferred Federal Income Taxes + 0 + 0 Other Deferred Credits + 0 + 0 Total Non-Recognized Sources: = 0 = 0 Total Sources of Funds: Total Recognized Sources 990,994 681,852 Total Non-Recognized Sources + 0 + 0 Total Sources of Funds: = 990,994 = 681,852 Table 17—Total Sources of Funds, District Two
Area 4 Area 5 Recognized Assets: Total Current Assets $454,465 $681,697 Total Current Liabilities − 409,366 − 614,048 Current Notes Payable + 25,822 + 38,734 Total Property and Equipment (Net) + 420,422 + 630,632 Land − 0 − 0 Start Printed Page 12096 Total Other Assets + 60,195 + 90,293 Total Recognized Assets = 551,538 = 827,308 Non-Recognized Assets: Total Investments and Special Funds + 0 + 0 Total Non-Recognized Assets = 0 = 0 Total Assets: Total Recognized Assets 551,538 827,308 Total Non-Recognized Assets + 0 + 0 Total Assets = 551,538 = 827,308 Recognized Sources of Funds: Total Stockholder Equity 89,537 134,305 Long-Term Debt + 410,357 + 615,535 Current Notes Payable + 25,822 + 38,734 Advances from Affiliated Companies + 0 + 0 Long-Term Obligations—Capital Leases + 0 + 0 Total Recognized Sources = 525,716 = 788,574 Non-Recognized Sources of Funds: Pension Liability 0 0 Other Non-Current Liabilities + 0 + 0 Deferred Federal Income Taxes + 0 + 0 Other Deferred Credits + 0 + 0 Total Non-Recognized Sources = 0 = 0 Total Sources of Funds: Total Recognized Sources 525,716 788,574 Total Non-Recognized Sources + 0 + 0 Total Sources of Funds = 525,716 = 788,574 Start Printed Page 12097Table 18—Total Sources of Funds, District Three
Area 6 Area 7 Area 8 Recognized Assets: Total Current Assets $658,934 $244,050 $317,265 Total Current Liabilities − 64,869 − 24,025 − 31,233 Current Notes Payable + 3,869 + 1,433 + 1,863 Total Property and Equipment (Net) + 21,905 + 8,113 + 10,547 Land − 0 − 0 − 0 Total Other Assets + 540 + 200 + 260 Total Recognized Assets = 620,379 = 229,771 = 298,702 Non-Recognized Assets: Total Investments and Special Funds + 0 + 0 + 0 Total Non-Recognized Assets = 0 = 0 = 0 Total Assets: Total Recognized Assets 620,379 229,771 298,702 Total Non-Recognized Assets + 0 + 0 + 0 Total Assets = 620,379 = 229,771 = 298,702 Recognized Sources of Funds: Total Stockholder Equity 606,164 224,505 291,857 Long-Term Debt + 6,478 + 2,399 + 3,119 Current Notes Payable + 3,869 + 1,433 + 1,863 Advances from Affiliated Companies + 0 + 0 + 0 Long-Term Obligations—Capital Leases + 0 + 0 + 0 Total Recognized Sources = 616,511 = 228,337 = 296,839 Non-Recognized Sources of Funds: Pension Liability 0 0 0 Other Non-Current Liabilities + 0 + 0 + 0 Deferred Federal Income Taxes + 0 + 0 + 0 Other Deferred Credits + 0 + 0 + 0 Total Non-Recognized Sources = 0 = 0 = 0 Total Sources of Funds: Total Recognized Sources 616,511 228,337 296,839 Total Non-Recognized Sources + 0 + 0 + 0 Total Sources of Funds = 616,511 = 228,337 = 296,839 Tables 16 through 18 also relate to the second part of the formula for calculating the investment base. The second part establishes a ratio between recognized sources of funds and total sources of funds. Since no non-recognized sources of funds (sources we do not recognize as required to support pilotage operations) exist for any of the pilotage associations for this year's rulemaking, the ratio between recognized sources of funds and total sources of funds is 1:1 (or a multiplier of 1) in all cases. Table 19 applies the multiplier of 1 and shows that the investment base for each association equals its total recognized assets. Table 19 also expresses these results by area, because area results will be needed in subsequent steps.
Table 19—Investment Base by Area and District
District Area Total recognized assets ($) Recognized sources of funds ($) Total sources of funds ($) Multiplier (ratio of recognized to total sources) Investment base ($) 1 One 1 996,442 990,994 990,994 1 996,442 2 685,602 681,852 681,852 1 685,602 Total 1,682,044 Two 2 4 551,538 525,716 525,716 1 551,538 5 827,308 788,574 788,574 1 827,308 Total 1,378,846 Three 6 620,379 616,511 616,511 1 620,379 7 229,771 228,337 228,337 1 229,771 8 298,702 296,839 296,839 1 298,702 Total 1,148,852 1 “Investment base” = “Total recognized assets” × “Multiplier (ratio of recognized to total sources)”. 2 The pilotage associations that provide pilotage services in Districts One and Three operate as partnerships. The pilotage association that provides pilotage service for District Two operates as a corporation. Step 5: Determination of target rate of return. We determine a market-equivalent ROI that will be allowed for the recognized net capital invested in each association by its members. We do not recognize capital that is unnecessary or unreasonable for providing pilotage services. There are no non-recognized investments in this year's calculations. The allowed ROI is based on the preceding year's average annual rate of return for new issues of high-grade corporate securities. For 2012, the preceding year, the allowed ROI was 3.67 percent, based on the average rate of return for that year on Moody's AAA corporate bonds, which can be found at: http://research.stlouisfed.org/fred2/series/AAA/downloaddata?cid=119.
Step 6: Adjustment determination. The first sub-step of Step 6 requires an initial calculation, applying a formula described in Appendix A. The formula uses the results from Steps 1, 2, 3, and 4 to project the ROI that can be expected in each area if no further adjustments are made. This calculation is shown in Tables 20 through 22.
Table 20—Projected ROI, Areas in District One
Area 1 Area 2 Revenue (from Step 3) $2,358,327 $1,546,373 Operating Expenses (from Step 1) − 677,603 − 475,332 Pilot Compensation (from Step 2) − 1,349,999 − 819,298 Operating Profit/(Loss) = 330,725 = 251,743 Interest Expense (from audits) − 18,484 − 12,718 Earnings Before Tax = 312,241 = 239,025 Federal Tax Allowance − 0 − 0 Net Income = 312,241 = 239,025 Return Element (Net Income + Interest) 330,725 251,743 Investment Base (from Step 4) ÷ 996,442 ÷ 685,602 Projected ROI = 0.3319 = 0.3672 Table 21—Projected ROI, Areas in District Two
Area 4 Area 5 Revenue (from Step 3) $1,193,426 $2,571,038 Operating Expenses (from Step 1) − 517,627 − 776,442 Pilot Compensation (from Step 2) − 655,438 − 1,349,999 Operating Profit/(Loss) = 20,361 = 444,597 Interest Expense (from audits) − 2,772 − 4,159 Earnings Before Tax = 17,589 = 440,438 Federal Tax Allowance − 4,800 − 7,200 Net Income = 12,789 = 433,238 Start Printed Page 12098 Return Element (Net Income + Interest) 15,561 437,397 Investment Base (from Step 4) ÷ 551,538 ÷ 827,308 Projected ROI = 0.0282 = 0.5287 Table 22—Projected ROI, Areas in District Three
Area 6 Area 7 Area 8 Revenue (from Step 3) $1,921,756 $1,459,929 $1,407,490 Operating Expenses (from Step 1) − 909,282 − 338,227 − 439,880 Pilot Compensation (from Step 2) − 983,157 − 899,999 − 819,298 Operating Profit/(Loss) = 29,317 = 221,703 = 148,312 Interest Expense (from audits) − 2,682 − 993 − 1,291 Earnings Before Tax = 26,635 = 220,710 = 147,021 Federal Tax Allowance − 0 − 0 − 0 Net Income = 26,635 = 220,710 = 147,021 Return Element (Net Income + Interest) 29,317 221,703 148,312 Investment Base (from Step 4) ÷ 620,379 ÷ 229,771 ÷ 298,702 Projected ROI = 0.0473 = 0.9649 = 0.4965 The second sub-step compares the results of Tables 20 through 22 with the target ROI (3.67 percent) we obtained in Step 5 to determine if an adjustment to the base pilotage rate is necessary. Table 23 shows this comparison for each area.
Table 23—Comparison of Projected ROI and Target ROI, by Area
Area 1 Area 2 Area 4 Area 5 Area 6 Area 7 Area 8 St. Lawrence River Lake Ontario Lake Erie Southeast Shoal to Port Huron, MI Lakes Huron and Michigan St. Mary's River Lake Superior Projected ROI 0.3319 0.3672 0.0282 0.5287 0.0473 0.9649 0.4965 Target ROI 0.0367 0.0367 0.0367 0.0367 0.0367 0.0367 0.0367 Difference in ROIs 0.2952 0.3305 (0.0085) 0.4920 0.0106 0.9282 0.4598 Because Table 23 shows a significant difference between the projected and target ROIs, an adjustment to the base pilotage rates is necessary. Step 6 now requires us to determine the pilotage revenues that are needed to make the target return on investment equal to the projected return on investment. This calculation is shown in Table 24. It adjusts the investment base we used in Step 4, multiplying it by the target ROI from Step 5, and applies the result to the operating expenses and target pilot compensation determined in Steps 1 and 2.
Table 24—Revenue Needed to Recover Target ROI, by Area
Pilotage area Operating expenses (Step 1) Target pilot compensation (Step 2) Investment Base (Step 4) × 3.67% (Target ROI Step 5) Federal tax allowance Revenue needed Area 1 (Designated waters) $677,603 + $1,349,999 + $36,569 + $0 = $2,064,171 Area 2 (Undesignated waters) 475,332 + 819,298 + 25,162 + 0 = 1,319,791 Area 4 (Undesignated waters) 517,627 + 655,438 + 20,241 + 4,800 = 1,198,107 Area 5 (Designated waters) 776,442 + 1,349,999 + 30,362 + 7,200 = 2,164,003 Area 6 (Undesignated waters) 909,282 + 983,157 + 22,768 + 0 = 1,915,207 Area 7 (Designated waters) 338,227 + 899,999 + 8,433 + 0 = 1,246,659 Area 8 (Undesignated waters) 439,880 + 819,298 + 10,962 + 0 = 1,270,140 Total 4,134,394 + 6,877,187 + 154,498 + 12,000 = 11,178,078 The “Revenue Needed” column of Table 24 is more than the revenue we projected in Table 15. For purposes of transparency, we verify the calculations in Table 24 by rerunning the formula in the first sub-step of Step 6, using the revenue needed from Table 24 instead of the Table 15 revenue projections we used in Tables 20 through 22. Tables 25 through 27 show that attaining the Table 24 revenue needed is sufficient to recover target ROI.Start Printed Page 12099
Table 25—Balancing Revenue Needed and Target ROI, District One
Area 1 Area 2 Revenue Needed $2,064,171 $1,319,791 Operating Expenses (from Step 1) − 677,603 − 475,332 Pilot Compensation (from Step 2) − 1,349,999 − 819,298 Operating Profit/(Loss) = 36,569 = 25,162 Interest Expense (from audits) − 18,484 − 12,718 Earnings Before Tax = 18,085 = 12,444 Federal Tax Allowance − 0 − 0 Net Income = 18,085 = 12,444 Return Element (Net Income + Interest) 36,569 25,162 Investment Base (from Step 4) ÷ 996,442 ÷ 685,602 ROI = 0.0367 = 0.0367 Table 26—Balancing Revenue Needed and Target ROI, District Two
Area 4 Area 5 Revenue Needed + $1,198,107 + $2,164,003 Operating Expenses (from Step 1) − 517,627 − 776,442 Pilot Compensation (from Step 2) − 655,438 − 1,349,999 Operating Profit/(Loss) = 25,041 = 37,562 Interest Expense (from audits) − 2,772 − 4,159 Earnings Before Tax = 22,269 = 33,403 Federal Tax Allowance − 4,800 − 7,200 Net Income = 17,469 = 26,203 Return Element (Net Income + Interest) 20,241 30,362 Investment Base (from Step 4) ÷ 551,538 ÷ 827,308 ROI = 0.0367 = 0.0367 Table 27—Balancing Revenue Needed and Target ROI, District Three
Area 6 Area 7 Area 8 Revenue Needed + $1,915,207 + $1,246,659 + $1,270,140 Operating Expenses (from Step 1) − 909,282 − 338,227 − 439,880 Pilot Compensation (from Step 2) − 983,157 − 899,999 − 819,298 Operating Profit/(Loss) = 22,768 = 8,433 = 10,962 Interest Expense (from audits) − 2,682 − 993 − 1,291 Earnings Before Tax = 20,086 = 7,440 = 9,671 Federal Tax Allowance − 0 − 0 − 0 Net Income = 20,086 = 7,440 = 9,671 Return Element (Net Income + Interest) 22,768 8,433 10,962 Investment Base (from Step 4) ÷ 620,379 ÷ 229,771 ÷ 298,702 ROI = 0.0367 = 0.0367 = 0.0367 Step 7: Adjustment of pilotage rates. Finally, and subject to negotiation with Canada or to an adjustment for other supportable circumstances, we calculate rate adjustments by dividing the Step 6 revenue needed (Table 24) by the Step 3 revenue projection (Table 15), to give us a rate multiplier for each area. Tables 28 through 30 show these calculations.
Table 28—Rate Multiplier, Areas in District One
Ratemaking Projections Area 1 Area 2 St. Lawrence River Lake Ontario Revenue Needed (from Step 6) $2,064,171 $1,319,791 Revenue (from Step 3) ÷ 2,358,327 ÷ 1,546,373 Rate Multiplier = 0.8753 = 0.8535 Table 29—Rate Multiplier, Areas in District Two
Ratemaking Projections Area 4 Area 5 Lake Erie Southeast Shoal to Port Huron, MI Revenue Needed (from Step 6) $1,198,107 $2,164,003 Start Printed Page 12100 Revenue (from Step 3) ÷ 1,193,426 ÷ 2,571,038 Rate Multiplier = 1.0039 = 0.8417 Table 30—Rate Multiplier, Areas in District Three
Ratemaking Projections Area 6 Area 7 Area 8 Lakes Huron and Michigan St. Mary's River Lake Superior Revenue Needed (from Step 6) $1,915,207 $1,246,659 $1,270,140 Revenue (from Step 3) ÷ 1,921,756 ÷ 1,459,929 ÷ 1,407,490 Rate Multiplier = 0.9966 = 0.8539 = 0.9024 We calculate a rate multiplier for adjusting the basic rates and charges described in 46 CFR 401.420 and 401.428, and it is applicable in all areas. We divide total revenue needed (Step 6, Table 24) by total projected revenue (Steps 3 and 3.A, Table 15). Table 31 shows this calculation.
Table 31—Rate Multiplier for Basic Rates and Charges in 46 CFR 401.420 and 401.428
Ratemaking Projections: Total Revenue Needed (from Step 6) $11,178,078 Total revenue (from Step 3) ÷ 12,458,339 Rate Multiplier = 0.897 This table shows that rates for cancellation, delay, or interruption in rendering services (46 CFR 401.420) and basic rates and charges for carrying a U.S. pilot beyond the normal change point, or for boarding at other than the normal boarding point (46 CFR 401.428), would decrease by 10.3 percent in all areas.
Without further action, the existing rates we established in our 2013 final rule would then be multiplied by the rate multipliers from Tables 28 through 30 to calculate the area by area rate changes for 2014. The resulting 2014 rates, on average, would then be decreased approximately 11 percent from the 2013 rates. This decrease is not due to increased efficiencies in pilotage services, but rather is a result of recent significant changes in AMOU contracts. We declined to impose this decrease because financial data from one of the associations indicates that such a rate decrease would make it difficult for it to continue funding operations, and may even cause the association to permanently close. Moreover, the decrease would have an adverse effect on providing safe, efficient, and reliable pilotage in the other two pilotage districts. Finally, our 2013 agreement with Canada calls for comparable pilotage rates between the two countries, and we proposed aligning our rates to the Canadian rate, which actually increased by 2.5 percent this year. Our discretionary authority under Step 7 must be “based on requirements of the Memorandum . . . between the United States and Canada, and other supportable circumstances that may be appropriate.” 46 CFR part 404, App. A. Without the 2.5 percent increase, U.S. and Canadian rates would be less comparable. “Other supportable circumstances” we have for exercising our discretion include E.O. 13609, “Promoting International Regulatory Cooperation,” which calls on Federal agencies to eliminate “unnecessary differences” between U.S. and foreign regulations (see 77 FR 26413, May 4, 2012). Additionally, there is a risk that a substantial rate decrease would jeopardize the ability of the three pilotage associations to provide safe, efficient, and reliable pilotage service.
Therefore, we are relying on the discretionary authority we have under Step 7 to further adjust rates so that they closely align with those adopted by the Canadian GLPA for 2014. Table 32 compares the impact, area by area, that an average decrease of 11 percent would have, relative to the impact each area would experience if U.S. rates more closely align with those of the Canadian GLPA.
Start Printed Page 12101Table 32—Impact of Exercising Step 7 Discretion
Area Percent change in rate without exercising Step 7 discretion Percent change in rate with exercise of Step 7 discretion Area 1 (Designated waters) −12.47 2.50 Area 2 (Undesignated waters) −14.65 2.50 Area 4 (Undesignated waters) 0.39 2.50 Area 5 (Designated waters) −15.83 2.50 Area 6 (Undesignated waters) −0.34 2.50 Area 7 (Designated waters) −14.61 2.50 Area 8 (Undesignated waters) −9.76 2.50 Tables 33 through 35 reflect our rate adjustments of 2.5 percent across Districts One, Two and Three.
Table 33—Adjustment of Pilotage Rates, Areas in District One
2013 Rate Rate multiplier Adjusted rate for 2014 Area 1, St. Lawrence River Basic Pilotage $18.75/km, $33.19/mi × 1.025 = $19.22/km, $34.02/mi Each lock transited 416 × 1.025 = 426 Harbor movage 1,361 × 1.025 = 1,395 Minimum basic rate, St. Lawrence River 908 × 1.025 = 931 Maximum rate, through trip 3,984 × 1.025 = 4,084 Area 2, Lake Ontario 6-hour period 851 × 1.025 = 872 Docking or undocking 812 × 1.025 = 832 In addition to the rate charges in Table 33, and for the reasons we discussed in Section V.A. of this preamble, we are adding 46 CFR 401.401, authorizing imposition of temporary surcharges. Effective April 3, 2014, we authorize District One to implement a temporary supplemental 3 percent charge on each source form (the “bill” for pilotage service) for the duration of the 2014 shipping season. We do not think this surcharge will have a disruptive effect on District One traffic, because Canada has used an 18 percent surcharge in the past with no such effect.
Start Printed Page 12102Table 34—Adjustment of Pilotage Rates, Areas in District Two
2013 Rate Rate multiplier Adjusted rate for 2014 Area 4, Lake Erie 6-hour period $828 × 1.025 = $849 Docking or undocking 637 × 1.025 = 653 Any point on Niagara River below Black Rock Lock 1,626 × 1.025 = 1,667 Area 5, Southeast Shoal to Port Huron, MI between any point on or in Toledo or any point on Lake Erie W. of Southeast Shoal 1,382 × 1.025 = 1,417 Toledo or any point on Lake Erie W. of Southeast Shoal & Southeast Shoal 2,339 × 1.025 = 2,397 Toledo or any point on Lake Erie W. of Southeast Shoal & Detroit River 3,037 × 1.025 = 3,113 Toledo or any point on Lake Erie W. of Southeast Shoal & Detroit Pilot Boat 2,339 × 1.025 = 2,397 Port Huron Change Point & Southeast Shoal (when pilots are not changed at the Detroit Pilot Boat) 4,074 × 1.025 = 4,176 Port Huron Change Point & Toledo or any point on Lake Erie W. of Southeast Shoal (when pilots are not changed at the Detroit Pilot Boat) 4,719 × 1.025 = 4,837 Port Huron Change Point & Detroit River 3,060 × 1.025 = 3,137 Port Huron Change Point & Detroit Pilot Boat 2,381 × 1.025 = 2,441 Port Huron Change Point & St. Clair River 1,693 × 1.025 = 1,735 St. Clair River 1,382 × 1.025 = 1,417 St. Clair River & Southeast Shoal (when pilots are not changed at the Detroit Pilot Boat) 4,074 × 1.025 = 4,176 St. Clair River & Detroit River/Detroit Pilot Boat 3,060 × 1.025 = 3,137 Detroit, Windsor, or Detroit River 1,382 × 1.025 = 1,417 Detroit, Windsor, or Detroit River & Southeast Shoal 2,339 × 1.025 = 2,397 Detroit, Windsor, or Detroit River & Toledo or any point on Lake Erie W. of Southeast Shoal 3,037 × 1.025 = 3,113 Detroit, Windsor, or Detroit River & St. Clair River 3,060 × 1.025 = 3,137 Detroit Pilot Boat & Southeast Shoal 1,693 × 1.025 = 1,735 Detroit Pilot Boat & Toledo or any point on Lake Erie W. of Southeast Shoal 2,339 × 1.025 = 2,397 Detroit Pilot Boat & St. Clair River 3,060 × 1.025 = 3,137 Table 35—Adjustment of Pilotage Rates, Areas in District Three
2013 Rate Rate multiplier Adjusted rate for 2014 Area 6 Lakes Huron and Michigan 6-hour Period $691 × 1.025 = $708 Docking or undocking 656 × 1.025 = 672 Area 7 St. Mary's River between any point on or in Gros Cap & De Tour 2,583 × 1.025 = 2,648 Algoma Steel Corp. Wharf, Sault Ste. Marie, Ont. & De Tour 2,583 × 1.025 = 2,648 Algoma Steel Corp. Wharf, Sault. Ste. Marie, Ont. & Gros Cap 973 × 1.025 = 997 Any point in Sault St. Marie, Ont., except the Algoma Steel Corp. Wharf & De Tour 2,165 × 1.025 = 2,219 Any point in Sault St. Marie, Ont., except the Algoma Steel Corp. Wharf & Gros Cap 973 × 1.025 = 997 Sault Ste. Marie, MI & De Tour 2,165 × 1.025 = 2,219 Sault Ste. Marie, MI & Gros Cap 973 × 1.025 = 997 Harbor movage 973 × 1.025 = 997 Area 8 Lake Superior 6-hour period 586 × 1.025 = 601 Docking or undocking 557 × 1.025 = 571 VII. Regulatory Analyses
We developed this rule after considering numerous statutes and E.O.s related to rulemaking. Below we summarize our analyses based on these statutes or E.O.s.
A. Regulatory Planning and Review
Executive Orders 12866 (“Regulatory Planning and Review”) and 13563 (“Improving Regulation and Regulatory Review”) direct agencies to assess the costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). Executive Order 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. This rule is not a significant regulatory action under section 3(f) of E.O. 12866 as supplemented by E.O. 13563, and does not require an assessment of potential costs and benefits under section 6(a)(3) of E.O. 12866. The Office of Management and Budget (OMB) has not reviewed it under E.O. 12866. Nonetheless, we developed an analysis of the costs and benefits of the rule to ascertain its probable impacts on industry.
Based on comments received, the Coast Guard is adjusting the operating expense base in District One in order to account for an addition to the expense base of $4,360 for APA dues, as well as the inclusion of the 2011 license insurance cost ($52,232) in the expense base. However, because of our Step 7 discretionary adjustment to pilotage rates, which increases rates by 2.5 percent from the previous year in all three districts, these changes to the underlying data do not impact the final rates. Despite this increase in pilotage rates, as well as the implementation of a temporary, supplemental surcharge to traffic in District One of 3 percent, we estimate that shippers will experience a reduction in payments from the previous year of approximately $697,914 across all three districts as a result of an expected decrease in the demand for pilotage services from the previous year.[4]
A regulatory assessment follows.
The Coast Guard is required to review and adjust pilotage rates on the Great Lakes annually. See Parts III and IV of this preamble for detailed discussions of the Coast Guard's legal basis and purpose for this rulemaking, and for background information on Great Lakes pilotage ratemaking. Based on our annual review for this rulemaking, we are adjusting the pilotage rates for the 2014 shipping season to generate sufficient revenue to cover allowable expenses, and to target pilot compensation and returns on pilotage associations' investments. The rate adjustments in this final rule would, if codified, lead to an increase in the cost per unit of service to shippers in all three districts. Despite these rate increases, however, we estimate that shippers in Districts Two and Three will experience a decrease in payments from the previous year as a result of a decrease in demand for pilotage services. The reduction in payments that would occur in Districts Two and Three would outweigh the increase in payments in District One, which would result in an estimated annual decrease in payments by shippers of approximately $817,983 across all three districts.[5] After accounting for the implementation of a temporary 3 percent surcharge to traffic in District One, which is expected to generate $120,070, the annual payments made by shippers across all three districts for pilotage services are estimated to be approximately $697,914 less than the payments that were made in 2013.
The rule would apply the 46 CFR part 404, Appendix A, full ratemaking methodology, including the exercise of our discretion to increase Great Lakes pilotage rates, on average, approximately 2.5 percent overall in all three districts from the current rates set in the 2013 final rule. The Appendix A methodology is discussed and applied in detail in Part V of this preamble. Among other factors described in Part V, it reflects audited 2011 financial data from the pilotage associations (the most Start Printed Page 12103recent year available for auditing), projected association expenses, and regional inflation or deflation. The last full Appendix A ratemaking was concluded in 2013 and used financial data from the 2010 base accounting year. The last annual rate review, conducted under 46 CFR part 404, Appendix C, was completed early in 2011.
The shippers affected by these rate adjustments are those owners and operators of domestic vessels operating on register (employed in foreign trade) and owners and operators of foreign vessels on routes in the Great Lakes system. These owners and operators must have pilots or pilotage service as required by 46 U.S.C. 9302. There is no minimum tonnage limit or exemption for these vessels. The Coast Guard's interpretation is that the statute applies only to commercial vessels and does not apply to recreational vessels.
Owners and operators of other vessels that are not affected by this rule, such as recreational boats and vessels operating only within the Great Lakes system, may elect to purchase pilotage services. However, this election is voluntary; it does not affect our calculation of the rate, and it is not a part of our estimated national cost to shippers. Our sampling of pilot data suggests that there are very few domestic vessels that do not have a registry and operate only in the Great Lakes that voluntarily purchase pilotage services.
We used 2010-2012 vessel arrival data from the Coast Guard's Marine Information for Safety and Law Enforcement (MISLE) system to estimate the average annual number of vessels affected by the rate adjustment. Using data from that period, we found that approximately 128 vessels journeyed into the Great Lakes system annually. These vessels entered the Great Lakes by transiting at least one of the three pilotage districts before leaving the Great Lakes system. These vessels often make more than one distinct stop, which include docking, loading, and unloading at facilities in Great Lakes ports. Of the total trips for the 128 vessels, there were approximately 353 annual U.S. port arrivals before the vessels left the Great Lakes system, based on 2010-2012 vessel data from MISLE.
The impact of the rate adjustment to shippers is estimated from the district pilotage revenues. These revenues represent the costs (“economic costs”) that shippers must pay for pilotage services. The Coast Guard sets rates so that revenues equal the estimated cost of pilotage for these services.
We estimate the additional impact (cost increases or cost decreases) of the rate adjustment in this rule to be the difference between the total projected revenue needed to cover costs in 2013, based on the 2013 rate adjustment, and the total projected revenue needed to cover costs in 2014, as set forth in this rule, plus any temporary surcharges authorized by the Coast Guard. Table 36 details projected revenue needed to cover costs in 2014 after making the discretionary adjustment to pilotage rates as discussed in Step 7 of Part VI of this preamble. Table 37 summarizes the derivation for calculating the 3 percent surcharge on District One traffic, as discussed earlier in this preamble. Table 38 details the additional cost increases or decreases by area and district as a result of the rate adjustments and the temporary surcharge to District One traffic.
Table 36—Rate Adjustment by Area and District
[$U.S.; Non-discounted]
2013 pilotage rates 6 Rate change 7 2014 pilotage rates 8 Projected 2014 bridge hours 9 Projected revenue needed in 2014 10 Area 1 $460.971 1.0250 $472.50 5,116 $2,417,285.09 Area 2 284.836 1.0250 291.96 5,429 1,585,032.47 Total, District One 4,002,317.56 Area 4 205.268 1.0250 210.40 5,814 1,223,261.97 Area 5 508.915 1.0250 521.64 5,052 2,635,314.21 Total, District Two 3,858,576.18 Area 6 199.954 1.0250 204.95 9,611 1,969,800.03 Area 7 482.940 1.0250 495.01 3,023 1,496,427.14 Area 8 186.670 1.0250 191.34 7,540 1,442,676.83 Total, District Three 4,908,904.00 * Some values may not total due to rounding. Table 37—Derivation of Temporary Surcharge
Area 1 Area 2 Projected Revenue Needed in 2014 11 $2,417,285.09 $1,585,032.47 Surcharge Rate 3% 3% Surcharge Raised 72,518.55 47,550.97 Start Printed Page 12104 Total Surcharge 120,069.53 Table 38—Change in Payments by Shippers From the Previous Year by Area and District
[$U.S.; Non-discounted]
Projected revenue needed in 2013 Projected revenue needed in 2014 Temporary surcharge 12 Additional costs or savings of this proposed rule Area 1 $2,404,424 $2,417,285 $72,519 $85,380 Area 2 1,569,160 1,585,032 47,551 63,423 Total, District One 3,973,584 4,002,318 120,070 148,803 Area 4 1,398,694 1,223,262 (175,432) Area 5 2,596,484 2,635,314 38,830 Total, District Two 3,995,178 3,858,576 (136,602) Area 6 2,281,673 1,969,800 (311,873) Area 7 1,556,517 1,496,427 (60,090) Area 8 1,780,829 1,442,677 (338,152) Total, District Three 5,619,019 4,908,904 (710,115) * Some values may not total due to rounding. After applying the discretionary rate change in this final rule, the resulting difference between the projected revenue in 2013 and the projected revenue in 2014 is the annual change in payments from shippers to pilots after accounting for market conditions (i.e., a decrease in demand for pilotage services) and the change to pilotage rates as a result of this final rule. This figure is equivalent to the total additional payments or reduction in payments from the previous year that shippers would incur for pilotage services.
The impact of the discretionary rate adjustments in this final rule to shippers varies by area and district. Although the discretionary rate adjustments would lead to affected shippers experiencing an increase in payments for pilotage services in all three districts, when combined with the overall decrease in demand for pilotage services across all three districts, only shippers operating in District One are estimated to experience an increase in payments of $28,733.56, while affected shippers operating in District Two and District Three would experience a reduction in payments of $136,602.82 and $710,115.00, respectively from the previous year. This decrease in demand is projected to result in a decrease in the number of billeted pilots in Areas 6 and 8 from 2013 to 2014, which consequently would lead to a decrease in payments despite the increase in pilotage rates.
In addition to the rate adjustments, District One would incur a temporary surcharge to traffic for the duration of the 2014 season. In District One, shippers would incur a temporary 3 percent surcharge in order for the district's pilot association to recover training expenses incurred in 2012. We estimate that this surcharge would generate $120,070 in District One. At the end of the 2014 shipping season, we will account for the monies the surcharge generates and make adjustments (debits/credits) to the operating expenses for the following year.[13]
To calculate an exact cost or cost reduction per vessel is difficult because of the variation in vessel types, routes, port arrivals, commodity carriage, time of season, conditions during navigation, and preferences for the extent of pilotage services on designated and undesignated portions of the Great Lakes system. Some owners and operators would pay more and some would pay less, depending on the distance and the number of port arrivals of their vessels' trips. However, the decrease in costs reported earlier in this final rule does capture the adjustment in payments that shippers would experience from the previous year. The overall adjustment in payments, after taking into account: (1) The decrease in demand for pilotage services; (2) the increase in pilotage rates; and (3) the addition of a temporary surcharge in District One, would be a reduction in payments by shippers of approximately $697,914 across all three districts.
This final rule would allow the Coast Guard to meet the statutory requirements to review the rates for pilotage services on the Great Lakes, ensuring proper pilot compensation.
Alternatively, if we instead imposed the new rates based on the new contract data from AMOU, there would be an approximately 11 percent decrease in rates across the system. This would have a much more detrimental effect on pilots, as payments from shippers would decrease by approximately $2,308,184. In contrast, as discussed above, if the discretionary 2.5 percent increase is applied to traffic in Districts One, Two, and Three, the payment from shippers only decreases by $697,914. Table 39 details projected revenue needed to cover costs in 2014 if the discretionary adjustment to pilotage rates as discussed in Step 7 of Part VI of this preamble is not made. Table 40 details the changes in payments to pilots from the previous year, by area and district, after accounting for: (1) A decrease in demand for pilotage services; (2) an increase in pilotage rates Start Printed Page 12105across all three districts; and (3) the addition of a temporary surcharge applied to traffic in District One.
Table 39—Alternative Rate Adjustment by Area and District
[$U.S.; Non-discounted]
2013 Pilotage rates Rate change 14 2014 Pilotage rates Projected 2014 bridge hours Projected revenue needed in 2014 15 Area 1 $460.97 0.8753 $403.47 5,116 $2,064,171 Area 2 284.84 0.8535 243.10 5,429 1,319,791 Total, District One 3,383,963 Area 4 205.27 1.0039 206.07 5,814 1,198,107 Area 5 508.91 0.8417 428.35 5,052 2,164,002 Total, District Two 3,362,110 Area 6 199.95 0.9966 199.27 9,611 1,915,207 Area 7 482.94 0.8539 412.39 3,023 1,246,659 Area 8 186.67 0.9024 168.45 7,540 1,270,140 Total, District Three 4,432,006 * Some values may not total due to rounding. Table 40—Alternative Change in Payments by Shippers From the Previous Year by Area and District
[$U.S.; Non-discounted]
Projected revenue needed in 2013 Projected revenue needed in 2014 Temporary surcharge Total increase or decrease in payments (A) (B) (C) (B−A) + C Area 1 $2,404,424 $2,064,171 $61,925 ($278,328) Area 2 1,569,160 1,319,791 39,594 (209,775) Total, District One 3,973,584 3,383,963 101,519 (488,102) Area 4 1,398,694 1,198,107 (200,587) Area 5 2,596,484 2,164,002 (432,482) Total, District Two 3,995,178 3,362,110 (633,068) Area 6 2,281,673 1,915,207 (366,466) Area 7 1,556,517 1,246,659 (309,858) Area 8 1,780,829 1,270,140 (510,689) Total, District Three 5,619,019 4,432,006 (1,187,013) * Some values may not total due to rounding. We reject this alternative because a substantial decrease in payments by shippers would jeopardize the ability of the three pilotage associations to provide safe, efficient, and reliable pilotage services, and it would violate the Memorandum of Arrangements, which calls for the United States' and Canada's pilotage rates to be comparable. See our discussion of Step 7 in Part VI of this preamble for further explanation.
B. Small Entities
Under the Regulatory Flexibility Act, 5 U.S.C. 601-612, we have considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000.
We expect that entities affected by the rule would be classified under the North American Industry Classification System (NAICS) code subsector 483—Water Transportation, which includes the following 6-digit NAICS codes for freight transportation: 483111—Deep Sea Freight Transportation, 483113—Coastal and Great Lakes Freight Transportation, and 483211—Inland Water Freight Transportation. According to the Small Business Administration's definition, a U.S. company with these NAICS codes and Start Printed Page 12106employing less than 500 employees is considered a small entity.
For the final rule, we reviewed recent company size and ownership data from 2010-2012 Coast Guard MISLE data, and business revenue and size data provided by publicly available sources such as Manta and Reference USA. We found that large, foreign-owned shipping conglomerates or their subsidiaries owned or operated all vessels engaged in foreign trade on the Great Lakes. We assume that new industry entrants would be comparable in ownership and size to these shippers.
There are three U.S. entities affected by this final rule that receive revenue from pilotage services. These are the three pilotage associations that provide and manage pilotage services within the Great Lakes districts. Two of the associations operate as partnerships and one operates as a corporation. These associations are designated with the same NAICS industry classification and small-entity size standards described above, but they have fewer than 500 employees; combined, they have approximately 65 total employees. We expect no adverse impact to these entities from this final rule because all associations receive enough revenue to balance the projected expenses associated with the projected number of bridge hours and pilots.
Therefore, the Coast Guard certifies under 5 U.S.C. 605(b) that this final rule would not have a significant economic impact on a substantial number of small entities.
C. Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996, Public Law 104-121, we offered to assist small entities in understanding this rule so that they could better evaluate its effects on them and participate in the rulemaking. If the rule will affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the Coast Guard (see FOR FURTHER INFORMATION CONTACT). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.
Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247).
D. Collection of Information
This rule calls for no new collection of information under the Paperwork Reduction Act of 1995, 44 U.S.C. 3501-3520. This rule does not change the burden in the collection currently approved by the OMB under Control Number 1625-0086, Great Lakes Pilotage Methodology.
E. Federalism
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and have determined that it is consistent with the fundamental federalism principles and preemption requirements described in Executive Order 13132. Our analysis is explained below.
Congress directed the Coast Guard to establish “rates and charges for pilotage services.” 46 U.S.C. 9303(f). This regulation is issued pursuant to that statute and is preemptive of State law as outlined in 46 U.S.C. 9306. Under 46 U.S.C. 9306, a “State or political subdivision of a State may not regulate or impose any requirement on pilotage on the Great Lakes.” Because States may not promulgate rules within this category, the rule is consistent with the principles of federalism and preemption requirements in Executive Order 13132.
While it is well settled that States may not regulate in categories in which Congress intended the Coast Guard to have exclusive authority to promulgate regulations, the Coast Guard recognizes the key role that State and local governments may have in making regulatory determinations. Additionally, for rules with federalism implications and preemptive effect, Executive Order 13132 specifically directs agencies to consult with State and local governments during the rulemaking process. If you believe this rule has implications for federalism under Executive Order 13132, please contact the person listed in the FOR FURTHER INFORMATION CONTACT section of this preamble.
F. Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995, 2 U.S.C. 1531-1538, requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
G. Taking of Private Property
This rule will not cause a taking of private property or otherwise have taking implications under E.O. 12630 (“Governmental Actions and Interference with Constitutionally Protected Property Rights”).
H. Civil Justice Reform
This rule meets applicable standards in sections 3(a) and 3(b)(2) of E.O. 12988 (“Civil Justice Reform”), to minimize litigation, eliminate ambiguity, and reduce burden.
I. Protection of Children
We have analyzed this rule under E.O. 13045 (“Protection of Children from Environmental Health Risks and Safety Risks”). This rule is not an economically significant rule and would not create an environmental risk to health or risk to safety that might disproportionately affect children.
J. Indian Tribal Governments
This rule does not have tribal implications under E.O. 13175 (“Consultation and Coordination with Indian Tribal Governments”), because it would not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.
K. Energy Effects
We have analyzed this rule under E.O. 13211 (“Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use”). We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under E.O. 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy.
L. Technical Standards
The National Technology Transfer and Advancement Act, codified as a note to 15 U.S.C. 272, directs agencies to use voluntary consensus standards in their regulatory activities unless the agency provides Congress, through OMB, with an explanation of why using Start Printed Page 12107these standards would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., specifications of materials, performance, design, or operation; test methods; sampling procedures; and related management systems practices) that are developed or adopted by voluntary consensus standards bodies. This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.
M. Environment
We have analyzed this rule under DHS Management Directive 023-01 and Commandant Instruction M16475.lD, which guide the Coast Guard in complying with the National Environmental Policy Act of 1969, 42 U.S.C. 4321-4370f, and have concluded that this action is one of a category of actions that do not individually or cumulatively have a significant effect on the human environment. A final environmental analysis checklist supporting this determination is available in the docket where indicated under the ADDRESSES section of this preamble.
Start List of SubjectsList of Subjects in 46 CFR Part 401
- Administrative practice and procedure
- Great Lakes
- Navigation (water)
- Penalties
- Reporting and recordkeeping requirements
- Seamen
For the reasons discussed in the preamble, the Coast Guard amends 46 CFR part 401 as follows:
Start PartPART 401—GREAT LAKES PILOTAGE REGULATIONS
End Part Start Amendment Part1. The authority citation for part 401 continues to read as follows:
End Amendment Part Start Amendment Part2. In § 401.400, revise paragraph (b) to read as follows:
End Amendment PartCalculation of pilotage units and determination of weighting factor.* * * * *(b) Weighting factor table:
Range of pilotage units Weighting factor 0-49 1.0 50-159 1.15 160-189 1.30 190-and over 1.45 * * * * *3. Add § 401.401 to read as follows:
End Amendment PartSurcharges.To facilitate safe, efficient, and reliable pilotage, and for good cause, the Director may authorize surcharges on any rate or charge authorized by this subpart. Surcharges must be proposed for prior public comment and may not be authorized for more than 1 year.
4. In § 401.405, revise paragraphs (a) and (b), including the footnote to paragraph (a) to read as follows:
End Amendment PartBasic rates and charges on the St. Lawrence River and Lake Ontario.* * * * *(a) Area 1 (Designated Waters):
Service St. Lawrence River Basic Pilotage $19.22 per kilometer or $34.02 per mile.1 Each Lock Transited 426.1 Harbor Movage 1,395.1 1 The minimum basic rate for assignment of a pilot in the St. Lawrence River is $931, and the maximum basic rate for a through trip is $4,084. (b) Area 2 (Undesignated Waters):
Service Lake Ontario 6-hour Period $872 Docking or Undocking 832 5. In § 401.407, revise paragraphs (a) and (b) to read as follows:
End Amendment PartBasic rates and charges on Lake Erie and the navigable waters from Southeast Shoal to Port Huron, MI.* * * * *(a) Area 4 (Undesignated Waters):
Service Lake Erie (East of Southeast Shoal) Buffalo 6-hour Period $849 $849 Docking or Undocking 653 653 Any point on the Niagara River below the Black Rock Lock N/A 1,667 (b) Area 5 (Designated Waters):
Any point on or in Southeast Shoal Toledo or any point on Lake Erie west of Southeast Shoal Detroit River Detroit Pilot Boat St. Clair River Toledo or any port on Lake Erie west of Southeast Shoal $2,397 $1,417 $3,113 $2,397 N/A Port Huron Change Point 1 4,176 1 4,837 3,137 2,441 1,735 St. Clair River 1 4,176 N/A 3,137 3,137 1,417 Detroit or Windsor or the Detroit River 2,397 3,113 1,417 N/A 3,137 Detroit Pilot Boat 1,735 2,397 N/A N/A 3,137 1 When pilots are not changed at the Detroit Pilot Boat. 6. In § 401.410, revise paragraphs (a), (b), and (c) to read as follows:
End Amendment PartBasic rates and charges on Lakes Huron, Michigan, and Superior; and the St. Mary's River.* * * * *(a) Area 6 (Undesignated Waters):
Service Lakes Huron and Michigan 6-hour Period $708 Docking or Undocking 672 (b) Area 7 (Designated Waters):
Area De tour Gros cap Any harbor Gros Cap $2,648 N/A N/A Algoma Steel Corporation Wharf at Sault Ste. Marie, Ontario 2,648 997 N/A Start Printed Page 12108 Any point in Sault Ste. Marie, Ontario, except the Algoma Steel Corporation Wharf 2,219 997 N/A Sault Ste. Marie, MI 2,219 997 N/A Harbor Movage N/A N/A 997 (c) Area 8 (Undesignated Waters):
Service Lake Superior 6-hour Period $601 Docking or Undocking 571 [Amended]7. Amend § 401.420 as follows:
End Amendment Part Start Amendment Parta. In paragraph (a), remove the text “$126” and add, in its place, the text “$129”; and remove the text “$1,972” and add, in its place, the text “$2,021”;
End Amendment Part Start Amendment Partb. In paragraph (b), remove the text “$126” and add, in its place, the text “$129”; and remove the text “$1,972” and add, in its place, the text “$2,021”; and
End Amendment Part Start Amendment Partc. In paragraph (c)(1), remove the text “$744” and add, in its place, the text “$763”; and in paragraph (c)(3), remove the text “$126” and add, in its place, the text “$129”, and remove the text “$1,972” and add, in its place, the text “$2,021”.
End Amendment Part[Amended]8. In § 401.428, remove the text “$744” and add, in its place, the text “$763”.
End Amendment Part Start SignatureDated: February 25, 2014.
Gary C. Rasicot,
Director, Marine Transportation Systems Management, U.S. Coast Guard.
Footnotes
1. “On register” means that the vessel's certificate of documentation has been endorsed with a registry endorsement, and therefore, may be employed in foreign trade or trade with Guam, American Samoa, Wake, Midway, or Kingman Reef. 46 U.S.C. 12105, 46 CFR 67.17.
Back to Citation2. A “laker” is a commercial cargo vessel especially designed for and generally limited to use on the Great Lakes.
Back to Citation3. Per 46 U.S.C. 9307(d)(1), as delegated to the Coast Guard, we are to, “whenever practicable, consult with the [GLPAC] before taking any significant action relating to Great Lakes pilotage.”
Back to Citation4. Total reduction in payments made by shippers across all three districts is equal to the costs from rate changes (−$817,983) plus a temporary surcharge to traffic in District One ($120,070).
Back to Citation5. This annual reduction in payments is due to a projected decrease in the number of billeted pilots in Areas 6 and 8 from 2013 to 2014, as well as an overall decrease in the demand for pilotage services across all three districts. This decrease in the demand for pilotage services would reduce the projected revenue needed to cover costs and pilotage services.
Back to Citation6. These 2013 estimates are described in Table 15 of this final rule.
7. The estimated rate changes are described in Table 32 of this rule.
8. 2014 Pilotage Rates = 2013 Pilotage Rates × Rate Change.
9. These 2014 estimates are detailed in Table 13 of this final rule.
10. Projected Revenue needed in 2014 = 2014 Pilotage Rates × Projected 2014 Bridge Hours.
Back to Citation11. These estimates are derived in Table 36 of this final rule.
12. These estimates are derived in Table 37 of this final rule.
Back to Citation13. Assuming our estimate is correct, we would credit: District One shippers $71,075 at the end of the 2014 season in order to account for the difference between the total surcharges collected ($120,070) and the actual expenses incurred by District One pilots ($48,995 (training)).
Back to Citation14. The estimated rate changes are described in Table 32 of this preamble.
15. Projected Revenue needed in 2014 = 2014 Pilotage Rates × Projected 2014 Bridge Hours.
Back to Citation[FR Doc. 2014-04591 Filed 2-28-14; 11:15 am]
BILLING CODE 9110-04-P
Document Information
- Effective Date:
- 8/1/2014
- Published:
- 03/04/2014
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2014-04591
- Dates:
- Effective August 1, 2014 except for Sec. Sec. 401.400 and 401.401 which are effective April 3, 2014.
- Pages:
- 12084-12108 (25 pages)
- Docket Numbers:
- USCG-2013-0534
- RINs:
- 1625-AC07: Great Lakes Pilotage Rates--2014 Annual Review and Adjustment
- RIN Links:
- https://www.federalregister.gov/regulations/1625-AC07/great-lakes-pilotage-rates-2014-annual-review-and-adjustment
- Topics:
- Administrative practice and procedure, Great Lakes, Navigation (water), Penalties, Reporting and recordkeeping requirements, Seamen
- PDF File:
- 2014-04591.pdf
- CFR: (7)
- 46 CFR 401.400
- 46 CFR 401.401
- 46 CFR 401.405
- 46 CFR 401.407
- 46 CFR 401.410
- More ...