98-5684. Metropolitan Edison Company, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 63, Number 43 (Thursday, March 5, 1998)]
    [Notices]
    [Pages 10866-10868]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-5684]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. ER98-64-001, et al.]
    
    
    Metropolitan Edison Company, et al.; Electric Rate and Corporate 
    Regulation Filings
    
    February 25, 1998.
        Take notice that the following filings have been made with the 
    Commission:
    
    [[Page 10867]]
    
    1. Metropolitan Edison Company
    
    [Docket No. ER98-64-001]
    
        Take notice that on December 11, 1997, Metropolitan Edison Company 
    tendered for filing its compliance filing in the above-referenced 
    docket.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    2. Minnesota Power & Light Company
    
    [Docket No. ER98-912-000]
    
        Take notice that on February 13, 1998, Minnesota Power & Light 
    Company tendered for filing an amendment in the above-referenced 
    docket.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    3. Kamps Propane, Inc.
    
    [Docket No. ER98-1148-000]
    
        Take notice that on February 11, 1998, Kamps Propane, Inc., filed a 
    supplement to its application for market-based rates as power marketer. 
    The supplemental information pertains to Kamps Business Activities.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    4. Micah Tech Industries, Inc.
    
    [Docket No. ER98-1221-000]
    
        Take notice that on February 12, 1998, Micah Tech Industries, Inc., 
    tendered for filing an amendment in the above-referenced docket.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    5. Wisconsin Electric Power Company
    
    [Docket No. ER98-1871-000]
    
        Take notice that on February 13, 1998, Wisconsin Electric Power 
    Company (Wisconsin Electric), tendered for filing an unexecuted 
    electric service agreement under its Coordination Sales Tariff (FERC 
    Electric Tariff, Original Volume No. 2) with AYP Energy, Inc. (AYP), 
    and PacifiCorp Power Marketing (PPM). Wisconsin Electric respectfully 
    requests an effective date of sixty days from the date of filing. A 
    refund report was also submitted for previous transactions. Refunds 
    were calculated and paid for the time value of the money collected for 
    service without having a service agreement in place.
        Copies of the filing have been served on AYP, PPM, the Michigan 
    Public Service Commission, and the Public Service Commission of 
    Wisconsin.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    6. Cinergy Services, Inc.
    
    [Docket No. ER98-1872-000]
    
        Take notice that on February 13, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Open 
    Access Transmission Service Tariff (the Tariff) entered into between 
    Cinergy and Ohio Valley Electric Corporation (OVEC).
        Cinergy and OVEC are requesting an effective date of January 19, 
    1998.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Cinergy Services, Inc.
    
    [Docket No. ER98-1873-000]
    
        Take notice that on February 13, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Open 
    Access Transmission Service Tariff (the Tariff), entered into between 
    Cinergy and FirstEnergy Corp. (FirstEnergy).
        Cinergy and FirstEnergy are requesting an effective date of January 
    31, 1998.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. Cinergy Services, Inc.
    
    [Docket No. ER98-1874-000]
    
        Take notice that on February 13, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Open 
    Access Transmission Service Tariff (the Tariff), entered into between 
    Cinergy and Cinergy Services, Inc. (Cinergy, the Customer).
        Cinergy and Cinergy, the Customer are requesting an effective date 
    of February 1, 1998.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. UtiliCorp United Inc.
    
    [Docket No. ER98-1875-000]
    
        Take notice that on February 13, 1998, UtiliCorp United Inc. 
    (UtiliCorp), filed a service agreement with Colorado Springs Utilities 
    for service under its Non-Firm Point-to-Point open access service 
    tariff for its operating division, WestPlains Energy-Colorado.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    10. UtiliCorp United Inc.
    
    [Docket No. ER98-1876-000]
    
        Take notice that on February 13, 1998, UtiliCorp United Inc. 
    (UtiliCorp), filed a service agreement with Colorado Springs Utilities 
    for service under its Short-Term Firm Point-to-Point open access 
    service tariff for its operating division, WestPlains Energy-Colorado.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    11. Idaho Power Company
    
    [Docket No. ER98-1877-000]
    
        Take notice that on February 13, 1998, Idaho Power Company (IPC), 
    tendered for filing with the Federal Energy Regulatory Commission 
    Service Agreements under Idaho Power Company FERC Electric Tariff No. 
    5, Open Access Transmission Tariff, between Idaho Power Company and NP 
    Energy.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    12. The Dayton Power and Light Company
    
    [Docket No. ER98-1878-000]
    
        Take notice that on February 13, 1998, The Dayton Power and Light 
    Company (Dayton), submitted service agreements establishing Griffin 
    Energy Marketing, L.L.C., Tenaska Power Services Company as customers 
    under the terms of Dayton's Open Access Transmission Tariff.
        Dayton requests an effective date of one day subsequent to this 
    filing for the service agreements. Accordingly, Dayton requests waiver 
    of the Commission's notice requirements. Copies of the filing were 
    served upon Griffin Energy Marketing, L.L.C., Tenaska Power Services 
    Company and the Public Utilities Commission of Ohio.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    13. Southern Indiana Gas and Electric Company
    
    [Docket No. ER98-1879-000]
    
        Take notice that on February 13, 1998, Southern Indiana Gas and 
    Electric Company (SIGECO), tendered for filing three (3) service 
    agreements for firm transmission service under Part II of its 
    Transmission Services Tariff with:
    
    1. Amoco Energy Trading Corporation
    2. Columbia Power Marketing Corporation
    3. Equitable Power Service Company
    
    and two (2) service agreements for non-firm transmission service under 
    Part II of its Transmission Services Tariff with:
    
    1. Amoco Energy Trading Corporation
    2. Columbia Power Marketing Corporation
    
        Copies of the filing were served upon each of the parties to the 
    service agreement.
    
    [[Page 10868]]
    
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    14. Puget Sound Energy, Inc.
    
    [Docket No. ER98-1880-000]
    
        Take notice that on February 11, 1998, Puget Sound Energy, Inc., 
    tendered for filing Procedure Number 1, to the 1997 Agreement for 
    Hourly Coordination of Projects on the Mid-Columbia River which 
    establishes notification guidelines and procedures. A copy of the 
    filing was served upon all parties to the 1997 Agreement for Hourly 
    Coordination of Projects on the Mid-Columbia River.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    15. The Dayton Power and Light Company
    
    [Docket No. ER98-1881-000]
    
        Take notice that on February 13, 1998, The Dayton Power and Light 
    Company (Dayton), submitted service agreements establishing Griffin 
    Energy Marketing, L.L.C., Tenaska Power Services Company as customers 
    under the terms of Dayton's Open Access Transmission Tariff.
        Dayton requests an effective date of one day subsequent to this 
    filing for the service agreements. Accordingly, Dayton requests waiver 
    of the Commission's notice requirements. Copies of the filing were 
    served upon Griffin Energy Marketing, L.L.C., Tenaska Power Services 
    Company and the Public Utilities Commission of Ohio.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    16. Commonwealth Electric Company and Cambridge Electric Light 
    Company
    
    [Docket No. ER98-1882-000]
    
        Take notice that on February 13, 1998, Commonwealth Electric 
    Company (Commonwealth), and Cambridge Electric Light Company 
    (Cambridge), collectively referred to as the Companies, tendered for 
    filing with the Federal Energy Regulatory Commission executed Service 
    Agreements between the Companies and the following Market-Based Power 
    Sales Customers (collectively referred to herein as the Customers):
    
    Cinergy Capital & Trading, Inc.
    The Cincinnati Gas & Electric Company, PSI Energy, Inc., and Cinergy 
    Services, Inc.
    PacifiCorp Power Marketing, Inc.
    
        These Service Agreements specify that the Customers have signed on 
    to and have agreed to the terms and conditions of the Companies' 
    Market-Based Power Sales Tariffs designated as Commonwealth's Market-
    Based Power Sales Tariff (FERC Electric Tariff Original Volume No. 7) 
    and Cambridge's Market-Based Power Sales Tariff (FERC Electric Tariff 
    Original Volume No. 9). These Tariffs, accepted by the FERC on February 
    27, 1997, and which have an effective date of February 28, 1997, will 
    allow the Companies and the Customers to enter into separately 
    scheduled short-term transactions under which the Companies will sell 
    to the Customers capacity and/or energy as the parties may mutually 
    agree.
        The Companies request an effective date as specified on each 
    Service Agreement.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    17. Southern Indiana Gas and Electric Company
    
    [Docket No. ER98-1885-000]
    
        Take notice that on February 13, 1998, Southern Indiana Gas and 
    Electric Company (SIGECO), tendered for filing a Consent to Assignment 
    under which a long term power sales agreement with Ohio Edison Company 
    and Pennsylvania Power Company (collectively Ohio Edison System) would 
    be assigned to Ohio Edison System's newly formed corporate parent, 
    FirstEnergy Corporation. SIGECO has requested waiver of notice to allow 
    the assignment of the service agreements to become effective as of 
    January 1, 1998.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    18. Idaho Power Company
    
    [Docket No. ER98-1886-000]
    
        Take notice that on February 13, 1998, Idaho Power Company (IPC), 
    tendered for filing with the Federal Energy Regulatory Commission 
    Service Agreements under Idaho Power Company FERC Electric Tariff No. 
    6, Market Rate Power Sales Tariff, between Idaho Power Company and each 
    of the following: Salt River Project; Powerex; City of Burbank; Rainbow 
    Energy; PacifiCorp.
        Comment date: March 11, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    19. Central Illinois Light Company QST Energy Trading, Inc., Cinergy 
    Corp., Cincinnati Gas & Electric Company, PSI Energy, Inc., New England 
    Power Company, Massachusetts Electric Company, Nantucket Electric 
    Company, The Narragansett Electric Company, Granite State Electric 
    Company, Orange & Rockland Utilities Inc., Public Service Company of 
    Colorado Cheyenne Light, Fuel & Power Company, UGI Utilities, Inc., 
    Vermont Electric Power Company, Inc.
    
    [Docket Nos. OA97-451-001, OA97-596-001, OA97-419-001, OA97-127-001, 
    OA97-121-001, OA97-291-001, OA97-485-001, and OA97-444-001]
    
        Take notice that the companies listed in the above-captioned 
    dockets submitted revised standards of conduct 1 under Order 
    No. 889 et seq.2 The revised standards were submitted in 
    response to the Commission's January 15, 1998, order on standards of 
    conduct.3
    ---------------------------------------------------------------------------
    
        \1\ The revised standards were submitted between February 13 and 
    February 17, 1998.
        \2\ Open Access Same-Time Information System (Formerly Real-Time 
    Information Network) and Standards of Conduct, 61 FR 21737 (May 10, 
    1996), FERC Stats. & Regs., Regulation Preambles January 1991-June 
    1996 para. 31,035 (April 24, 1996); Order No. 889-A, order on 
    rehearing, 62 FR 12484 (March 14, 1997), III FERC Stats. & Regs. 
    para. 31,049 (March 4, 1997); Order No. 889-B, rehearing denied, 62 
    FR 64715 (December 9, 1997), 81 FERC para. 61,253 (November 25, 
    1997).
        \3\ Atlantic City Electric Company, et al., 82 FERC para. 61,028 
    (1998).
    ---------------------------------------------------------------------------
    
        Comment date: March 12, 1998, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of these filings are on file with 
    the Commission and are available for public inspection.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-5684 Filed 3-4-98; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
03/05/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-5684
Dates:
March 11, 1998, in accordance with Standard Paragraph E at the end of this notice.
Pages:
10866-10868 (3 pages)
Docket Numbers:
Docket No. ER98-64-001, et al.
PDF File:
98-5684.pdf