99-5503. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 64, Number 43 (Friday, March 5, 1999)]
    [Notices]
    [Pages 10661-10662]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-5503]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-6240-5]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared February 8, 1999 through 
    February 12, 1999 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 564-7167.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 10, 1998 (63 
    FR 17856).
    
    Draft EISs
    
        ERP No. D-COE-B32011-RI Rating EO2, Providence River and Harbor 
    Maintenance Dredging Project, To Restore the Navigation Efficiency, 
    Providence River Shipping Channel, Narragansett Bay, R.I.
        Summary: EPA expressed environmental objections with the Corps' 
    preferred Narragansett Bay disposal alternatives (Site 3 and the 
    Watchemoket Cove CAD Disposal Site) and suggested that the Corps give 
    further consideration to disposal at other alternate sites including 
    those in Rhode Island Sound. EPA requested additional information 
    concerning fisheries impacts, current characteristics at the disposal 
    sites, sediment erosion modeling, water quality, compliance with Clean 
    Water Action Section 404 (b)(1) Guidelines, and time of year 
    restrictions (dredge windows).
        ERP No. D-FAA-B51016-CT Rating EC2, Sikorsky Memorial Airport, 
    Proposed Runway 6-24 Improvements, Construction, Stratford, CT.
        SUMMARY: EPA requested additional information about the runway 
    improvements concerning wetlands, endangered species, water quality and 
    mitigation in order to fully evaluate the environmental acceptability 
    of the project.
        ERP No. D-NOA-A91065-00 Rating LO, Atlantic Tunas, Swordfish and 
    Sharks, Highly Migratory Species Fishery Management Plan.
        Summary: Review of the draft EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
        ERP No. D-USA-E11043-GA Rating EC2, U.S. Army/Fort Benning and The 
    Consolidated Government of Columbus Proposed Land Exchange, Muscogee 
    and Chattahoochee Counties, GA.
        Summary: EPA expressed environmental concerns about the long-term 
    ramifications of this deed transfer on biologically important species. 
    Additional information will be necessary to determine the actual 
    significance of this property exchange.
    
    Final EISs
    
        ERP No. F-COE-J36049-00, East Grand Forks, Minnesota and Grand 
    Forks, North Dakota Flood Control and Flood Protection, Red River 
    Basin, MN and ND.
        Summary: EPA continues to have concerns that this EIS does not take 
    into account the potential reasonably foreseeable development of Devil 
    Lake outlet, which could significantly affect the flow in the Red 
    River. EPA believes the Corps should take a basin wide approach to its 
    analysis including a discussion of the drainage of upper basin wetlands 
    and how it could relate to the shift in flood peaks.
        ERP No. F-FHW-B40081-NH
        Summary: The Final EIS contains a substantial amount of new 
    information responsive to previously stated concerns about wetlands, 
    water supply, water quality and air quality impacts associated with the 
    project.
        ERP No. F-FRC-B03009-ME, Maritimes Phase II Project, Construct and 
    Operate an Interstate Natural Gas Pipeline, COE Section 10 and 404 
    Permits, Endangered Species Act (ESA) and NPDE's permits, US Canada 
    border at Woodland (Burleyville) Maine and Westbrook Maine.
        Summary: EPA expressed environmental concerns about the incomplete 
    analysis of direct and secondary impacts and tie-ins to the pipeline, 
    impacts to vernal pools, and elements of contingency plans developed 
    for directional drilling applications.
        ERP No. F-FTA-E40774-FL, Central Florida Light Rail Transit System 
    Transportation Improvement to the
    
    [[Page 10662]]
    
    North/South Corridor Project, Locally Preferred Alternative (LPA) and 
    Minimum Operable Segment (MOS), Orange and Seminole Counties, FL.
        Summary: EPA's review found that concerns raised on the Draft EIS 
    were adequately addressed in the Final EIS document.
        ERP No. F-USN-K11064-CA, Mare Island Naval Shipyard Disposal and 
    Reuse, Implementation, City of Valley, Solano County, CA.
        Summary: EPA had a lack of objections to this project.
        ERP No. F-USN-K11087-CA, Long Beach Complex Disposal and Reuse, 
    Implementation, COE Section 10 and 404 Permits, NPDES Permit, in the 
    City of Long Beach and Los Angeles County, CA.
        Summary: EPA had no objection to this project.
    
        Dated: March 2, 1999.
    B. Katherine Biggs,
    Associate Director, NEPA Compliance Division, Office of Federal 
    Activities.
    [FR Doc. 99-5503 Filed 3-4-99; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
03/05/1999
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
99-5503
Pages:
10661-10662 (2 pages)
Docket Numbers:
ER-FRL-6240-5
PDF File:
99-5503.pdf