2024-04546. Issuance of Multiple Exemptions Regarding Security Notifications, Reports, and Recording Keeping
-
Start Preamble
AGENCY:
Nuclear Regulatory Commission.
ACTION:
Exemptions; issuance.
SUMMARY:
The U.S. Nuclear Regulatory Commission (NRC) is issuing a single notice to announce the issuance of 22 exemptions in response to requests from eight licensees in response to a change to NRC's regulations published in the Federal Register on March 14, 2023.
DATES:
During the period from January 1, 2024, to January 31, 2024, the NRC granted 22 exemptions in response to requests submitted by eight licensees from October 13, 2023, to January 24, 2024.
ADDRESSES:
Please refer to Docket ID NRC–2024–0047 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods:
• Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2024–0047. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301–415–0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the For Further Information Contact section of this document.
• NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1–800–397–4209, at 301–415–4737, or by email to PDR.Resource@nrc.gov. For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the “Availability of Documents” section.
• NRC's PDR: The PDR, where you may examine and order copies of publicly available documents, is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1–800–397–4209 or 301–415–4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ed Miller, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415–2481, email: Ed.Miller@nrc.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
I. Introduction
During the period from January 1, 2024, to January 31, 2024, the NRC granted 22 exemptions in response to requests submitted by the following licensees: Constellation Energy Generation, LLC; Duke Energy; NextEra Energy Point Beach, LLC and NextEra Energy Seabrook, LLC; Indiana Michigan Power Company; PSEG Nuclear LLC; Northern States Power Company, a Minesota Corporation, doing business as Xcel Energy; Entergy Operations, Inc.; and Southern Nuclear Operating Company.
These exemptions temporarily allow the licensees to deviate from certain requirements of part 73 of title 10 of the Code of Federal Regulations (10 CFR), “Physical Protection of Plants and Materials,” subpart T, “Security Notifications, Reports, and Recordkeeping.” In support of its exemption requests, the licensees agreed to effect site-specific administrative controls that maintain the approach to complying with 10 CFR part 73 in effect prior to the NRC's issuance of a final rule, “Enhanced Weapons, Firearms Background Checks, and Security Event Notifications,” which was published in the Federal Register on March 14, 2023, and became effective on April 13, 2023 (88 FR 15864).
II. Availability of Documents
The tables in this notice provide transparency regarding the number and type of exemptions the NRC has issued and provides the licensee name, facility name, docket number, document description, document date, and ADAMS accession number for each exemption issued. Additional details on each exemption issued, including the exemption request submitted by the respective licensee and the NRC's decision, are provided in each exemption approval listed in the following tables. For additional directions on accessing information in ADAMS, see the ADDRESSES section of this document.
Start SignatureDocument description ADAMS accession No. Document date Constellation Energy Generation, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Docket Nos. 50–317, 50–318, 72–008, and 72–078 Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23289A120 October 16, 2023. Calvert Cliffs Nuclear Power Plant, Units 1 and 2—Supplemental Information Letter for Part 73 Exemption Request—Responses to Request for Confirmatory Information ML23317A103 November 10, 2023. Calvert Cliffs Nuclear Power Plant, Units 1 and 2—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0033 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML24003A887 January 19, 2024. Start Printed Page 15900 Constellation Energy Generation, LLC; Clinton Power Station, Unit No. 1 Docket Nos. 50–461 and 72–1046 Clinton Power Station, Unit 1—Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23321A137 November 17, 2023. Clinton Power Station, Unit No. 1—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0041 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML24004A079 January 18, 2024. Constellation Energy Generation, LLC; Dresden Nuclear Power Station, Units 1, 2, and 3 Docket Nos. 50–10, 50–237, 50–249, and 72–037 Dresden Nuclear Power Station, Unit 1, 2, and 3—Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23289A100 October 16, 2023. Dresden Nuclear Power Station, Unit 1, 2 and 3—Supplemental Information Letter for Part 73 Exemption Request—Responses to Request for Confirmatory Information ML23317A104 November 10, 2023. Dresden Nuclear Power Station, Units 1, 2, and 3—Supplement—Dresden Security Rule Exemption Request—ISFSI Docket No. Reference (EPID L–2023–LLE–0031) (Email) ML23328A009 November 22, 2023. Dresden Nuclear Power Station, Units 1, 2, And 3—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0031 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML23354A281 January 4, 2024 Constellation Energy Generation, LLC; James A. FitzPatrick Nuclear Power Plant Docket Nos. 50–333 and 72–012 James A. FitzPatrick Nuclear Power Plant and Independent Spent Fuel Storage Installation—Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23326A008 November 22, 2023. James A. FitzPatrick Nuclear Power Plant—Supplemental Response to Part 73 Exemption Request—Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23341A127 December 7, 2023. James A FitzPatrick Nuclear Power Plant—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0058 [Security Notifications, Reports, And Recordkeeping and Suspicious Activity Reporting]) ML23356A083 January 4, 2024. Constellation Energy Generation, LLC; LaSalle County Station, Units 1 and 2 Docket Nos. 50–373, 50–374, and 72–070 LaSalle County Station, Units 1 and 2—Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23286A042 October 13, 2023. LaSalle County Station, Units 1 and 2—Supplemental Information Letter for Part 73 Exemption Request—Responses to Request for Confirmatory Information ML23317A106 November 10, 2023. [LaSalle County Station, Units 1 and 2]—Supplement—Security Rule Exemption Request—ISFSI Docket No. Reference (L-2023–LLE–0028) (Email) ML23328A013 November 22, 2023. LaSalle County Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0028 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)] ML23354A290 January 5, 2024. Constellation Energy Generation, LLC; Limerick Generating Station, Units 1 and 2 Docket Nos. 50–352, 50–353, and 72–065 Limerick Generating Station, Units 1 and 2, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23286A035 October 13, 2023. Limerick Generating Station, Units 1 and 2—Supplemental Information Letter for Part 73 Exemption Request—Responses to Request for Confirmatory Information ML23317A107 November 10, 2023. [Limerick Generating Station, Units 1 and 2] Supplement—Limerick Security Rule Exemption Request—ISFSI Docket No. Reference (EPID L–2023–LLE–0026) (Email) ML23331A006 November 22, 2023. Limerick Generating Station, Units Nos. 1 and 2—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0026 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML24004A034 January 17, 2024. Constellation Energy Generation, LLC; Nine Mile Point Nuclear Station, Units 1 and 2 Docket Nos. 50–220, 50–410, and 72–1036 Nine Mile Point [Nuclear Station], Unit Nos. 1 and 2—Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23326A009 November 22, 2023. Start Printed Page 15901 Nine Mile Point Nuclear Station, Units 1 and 2—Supplemental Response to Part 73 Exemption Request—Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23341A131 December 7, 2023. Nine Mile Point [Nuclear Station], Units 1 and 2—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0059 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML23354A001 January 4, 2024. Constellation Energy Generation, LLC; Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos. 50–277, 50–278, and 72–029 Peach Bottom Atomic Power Station, Unit[s] 2 and 3, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23289A121 October 16, 2023. Peach Bottom Atomic Power Station, Units 2 and 3—Supplemental Information Letter for Part 73 Exemption Request—Responses to Request for Confirmatory Information ML23317A108 November 10, 2023. [Peach Bottom Atomic Power Station, Units 2 and 3]—Supplement—Peach Bottom Security Rule Exemption Request—ISFSI Docket No. Reference (EPID L–2023–LLE–0032) (Email) ML23331A911 November 22, 2023. Peach Bottom Atomic Power Station, Units 2 and 3—Supplement—Peach Bottom Security Rule Exemption Request—ISFSI Docket No. Reference (EPID L–2023–LLE–0032) (Updated) (Email) ML24002A713 December 29, 2023. Peach Bottom Atomic Power Station, Units 2 and 3—Exemption from Select Requirements of 10 CFR [Part] 73 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting] (EPID L–2023–LLE 0032) ML23354A192 January 5, 2024. Constellation Energy Generation, LLC; Quad Cities Nuclear Power Station, Units 1 and 2 Docket Nos. 50–254, 50–265, and 72–053 Quad Cities Nuclear Power Station, Units 1 & 2—Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23321A141 November 17, 2023. Quad Cities Nuclear Power Station, Unit No. 1 And 2—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0042 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML24004A005 January 17, 2024. Duke Energy; Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50–413, 50–414, and 72–45 [Catawba Nuclear Station, Units 1 and 2]—RA–23–0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23320A283 November 16, 2023. [Catawba Nuclear Station, Units 1 and 2]—Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A344 December 4, 2023. Catawba Nuclear Station, Units 1 and 2, Re: Exemption from Select Requirements of 10 CFR Part 73—Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting (EPID L–2023–LLE–0050) ML24005A251 January 26, 2024. Duke Energy; H.B. Robinson Steam Electric Plant, Unit No. 2 Docket Nos. 50–261, 72–3, and 72–60 [H.B. Robinson Steam Electric Plant, Unit No. 2]- RA–23–0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23320A283 November 16, 2023. [H.B. Robinson Steam Electric Plant, Unit No. 2]—Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A344 December 4, 2023. H.B. Robinson Steam Electric Plant, Unit No. 2—Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE 0047 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML24009A243 January 25, 2024. Duke Energy; Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50–269, 50–270, 50–287, 72–04, and 72–40 [Oconee Nuclear Station, Units 1, 2, and 3]—RA–23–0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23320A283 November 16, 2023. [Oconee Nuclear Station, Units 1, 2, and 3]—Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A344 December 4, 2023. Oconee Nuclear Station, Units 1, 2, and 3—Re: Exemption from Select Requirements of 10 CFR part 73 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting] (EPID L–2023–LLE–0049) ML24005A249 January 24, 2024. Start Printed Page 15902 NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Units 1 and 2 Docket Nos. 50–266, 50–301, and 72–005 Point Beach Nuclear Plant, Units 1 and 2—Part [7]3 exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule ML23320A265 November 16, 2023. [Point Beach Nuclear Plant], Units 1 and 2—Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23334A073 November 29, 2023. Point Beach Nuclear Plant, Units 1 and 2—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0040 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML24005A324 January 24, 2024. NextEra Energy Seabrook, LLC; Seabrook Station, Unit No. 1 Docket Nos. 50–443 and 72–63 [Seabrook Station, Unit No. 1]—Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23320A269 November 16, 2023. [Seabrook Station, Unit No.1]—Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23334A074 November 29, 2023. Seabrook Station, Unit No. 1—Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE–0043 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML24009A115 January 29, 2024. Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 Docket Nos. 50–315, 50–316, and 72–072 Donald C. Cook Nuclear Plant, Unit 1 and Unit 2—Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation ML23320A233 November 16,2023. Donald C. Cook Nuclear Plant, Units 1 and 2—Security Rule Exemption Request—ISFSI Docket No. Reference (Email) ML23361A102 December 21, 2023. Donald C. Cook Nuclear Plant Unit Nos. 1 and 2—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0039 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML24004A158 January 19, 2024. PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2, and Hope Creek Generating Station Docket Nos. 50–354, 50–272, 50–311, and 72–48 Salem Nuclear Generating Station, Units 1 and 2, [and] Hope Creek Generating Station—Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23324A306 (Package) November 17, 2023. Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station—Exemption from Select Requirements Of 10 CFR Part 73 (EPID L–2023–LLE–0045 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML24009A102 January 26, 2024. Northern States Power Company, a Minesota Corporation (NSPM), doing business as Xcel Energy; Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50–282, 50–306, and 72–010 [Prairie Island Nuclear Generating Plant, Units 1 and 2]—Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23319A318 November 15, 2023. [Prairie Island Nuclear Generating Plant, Units 1 and 2]—Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24024A072 January 24, 2024. Prairie Island Nuclear Generating Plant, Units 1 and 2—Exemption from Select Requirements Of 10 CFR Part 73 [Security Notifications, Reports, And Recordkeeping and Suspicious Activity Reporting] (EPID L–2023–LLE–0056) ML23356A123 January 29, 2024. Northern States Power Company, a Minesota Corporation (NSPM), doing business as Xcel Energy; Monticello Nuclear Generating Plant, Unit 1 Docket No. 50–263 [Monticello Nuclear Generating Plant]- Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23319A318 November 15, 2023. [Monticello Nuclear Generating Plant]—Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24024A072 January 24, 2024. Monticello Nuclear Generating Plant—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0055 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML24025A936 January 31, 2024. Start Printed Page 15903 Entergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1 Docket Nos. 50–416 and 72–50 Grand Gulf Nuclear Station, Unit 1—Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A142 November 21, 2023. [Grand Gulf Nuclear Station, Unit 1—] Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23333A136 November 29, 2023. Grand Gulf Nuclear Station, Unit 1—Exemption from Select Requirements of 10 CFR Part 73 (EPID L–2023–LLE–0051 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting]) ML24012A142 January 31, 2024. Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 Docket Nos. 50–424, 50–425, 52–025, 52–026 and 72–1039 Vogtle Electric Generating Plant, Units 1, 2, 3, and 4—Request for Exemption from Security Event Notification Implementation ML23333A855 November 29, 2023. [Vogtle Electric Generating Plant,] Units 1, 2, 3, and 4—Exemption from Select Requirements of 10 CFR [part] 73 [Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting] (EPID L–2023–LLE–0067) ML24010A071 January 31, 2024. Southern Nuclear Operating Company; Edwin I. Hatch Nuclear Plant, Units 1 and 2 Docket Nos. 50–321, 50–366 and 72–36 Edwin I. Hatch Nuclear Plant—Request for Exemption from Security Event Notification Implementation ML23333A861 November 29, 2023. Edwin I. Hatch Nuclear Plant—Exemption from Select Requirements of 10 CFR Part 73 [Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting] (EPID L–2023–LLE–0068) ML24012A065 January 30, 2024. Southern Nuclear Operating Company; Joseph M. Farley Nuclear Plant, Units 1 and 2 50–348, 50–364 and 72–42 Joseph M. Farley Nuclear Plant—Request for Exemption from Security Event Notification Implementation ML23333A847 November 29, 2023. Joseph M. Farley Nuclear Plant—Exemption from Select Requirements Of 10 CFR Part 73—Security Notifications, Reports, And Recordkeeping And Suspicious Activity Reporting (EPID L–2023–LLE–0066) ML24010A003 January 30, 2024. For the Nuclear Regulatory Commission.
Dated: February 28, 2024.
Jeffrey A. Whited,
Chief, Plant Licensing Branch 3, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2024–04546 Filed 3–4–24; 8:45 am]
BILLING CODE 7590–01–P
Document Information
- Published:
- 03/05/2024
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Notice
- Action:
- Exemptions; issuance.
- Document Number:
- 2024-04546
- Dates:
- During the period from January 1, 2024, to January 31, 2024, the NRC granted 22 exemptions in response to requests submitted by eight licensees from October 13, 2023, to January 24, 2024.
- Pages:
- 15899-15903 (5 pages)
- Docket Numbers:
- Docket Nos. 50-317, 50-318, 72-008, 72-078, 50-461, 72-1046, 50-10, 50-237, 50-249, 72-037, 50-333, 72-012, 50-373, 50-374, 72-070, 50-352, 50-353, 72-065, 50-220, 50-410, 72-1036, 50-277, 50-278, 72-029, 50-254, 50-265, 72-053, 50-413, 50-414, 72-45, 50-, NRC-2024-0047
- PDF File:
- 2024-04546.pdf