[Federal Register Volume 60, Number 43 (Monday, March 6, 1995)]
[Notices]
[Pages 12208-12210]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-5384]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EF95-5071-000 et al.]
Western Area Power Administration, et al.; Electric Rate and
Corporate Regulation Filings
February 27, 1995.
Take notice that the following filings have been made with the
Commission:
1. Western Area Power Administration
[Docket No. EF95-5071-000]
Take notice that on February 17, 1995, the Deputy Secretary of the
Department of Energy, by Rate Order No. WAPA-65, did confirm and
approve on an interim basis, the Western Area Power Administration's
(Western), formula for determining annual revenue requirements for
electric power sold from the Provo River Project (PRP), effective April
1, 1995.
The formula for revenue recovery will be in effect pending the
Federal Energy Regulatory Commission's (FERC) approval of these or of a
substitute procedure on a final basis, through March 31, 2000.
Comment date: March 15, 1995, in accordance with Standard Paragraph
E at the end of this notice.
2. Consolidated Edison Company of New York, Inc.
[Docket No. ER94-175-000]
Take notice that on February 14, 1995, Consolidated Edison Company
of New York, Inc. (``Con Edison''), tendered for filing an amendment to
its agreement with Long Island Lighting Company (``LILCO''), to provide
for the purchase and sale of energy and capacity subject to cost based
ceiling rates.
Con Edison states that a copy of this filing has been served by
mail upon LILCO.
Comment date: March 13, 1995, in accordance with Standard Paragraph
E at the end of this notice.
3. Eastern Power Distribution, Inc.
[Docket No. ER94-964-004]
Take notice that on February 9, 1995, Eastern Power Distribution,
Inc. (EPDI), filed certain information as required by the Commission's
April 5, 1994, letter order in Docket No. ER94-964-000. Copies of
EPDI's informational filing are on file with the Commission and are
available for public inspection.
4. Electric Clearinghouse, Inc.
[Docket No. ER94-968-004]
Take notice that on January 30, 1995, Electric Clearinghouse, Inc.
(ECI), filed certain information as required by the Commission's April
7, 1994, letter order in Docket No. ER94-968-000. Copies of ECI's
informational filing are on file with the Commission and are available
for public inspection.
5. Eclipse Energy, Inc.
[Docket No. ER94-1099-003]
Take notice that on January 26, 1995, Eclipse Energy, Inc.
(Eclipse), filed certain information as required by the Commission's
June 15, 1994, letter order in Docket No. ER94-1099-000. Copies of
Eclipse's informational filing are on file with the Commission and are
available for public inspection.
6. Vesta Energy Alternatives Company
[Docket No. ER94-1168-003]
Take notice that on February 3, 1995, Vesta Energy Alternatives
Company (Vesta), filed certain information as required by the
Commission's July 8, July 20, November 28 and December 7, 1994, letter
orders in Docket No. ER94-1168-000. Copies of Vesta's informational
filing are on file with the Commission and are available for public
inspection.
7. CMEX Energy, Inc.
[Docket No. ER94-1328-002]
Take notice that on January 23, 1995, CMEX Energy, Inc. (CMEX),
filed certain information as required by the Commission's July 12,
1994, letter order in Docket No. ER94-1328-000. Copies of CMEX's
informational filing are on file with the Commission and are available
for public inspection.
8. Texas-Ohio Power Marketing, Inc.
[Docket No. ER94-1676-001]
Take notice that on January 24, 1995, Texas-Ohio Power Marketing,
Inc. (Texas-Ohio), filed certain information as required by the
Commission's October 31, 1994, letter order in Docket No. ER94-1676-
000. Copies of Texas-Ohio's informational filing are on file with the
Commission and are available for public inspection.
9. Equitable Power Services Company
[Docket No. ER94-1539-002]
Take notice that on January 27, 1995, Equitable Power Services
Company (EPSC), filed certain information as required by the
Commission's September 8, 1994, letter order in Docket No. ER94-1539-
000. Copies of EPSC's informational filing are on file with the
Commission and are available for public inspection.
10. Hadson Electric, Inc.
[Docket No. ER94-1613-001]
Take notice that on January 27, 1995, Hadson Electric, Inc.
(Hadson), filed certain information as required by the Commission's
November 17, 1994, letter order in Docket No. ER94-1613-000. Copies of
Hadson's informational filing are on file with the Commission and are
available for public inspection.
11. St. Joseph Light & Power Company
[Docket No. ER95-294-000]
Take notice that on February 16, 1995, St. Joseph Light & Power
Company (SJLP), submitted for filing an Amendment to the Non-Firm
Transmission Service Agreement between SJLP and Rainbow Energy
Marketing Corporation filed previously with the Commission on December
19, 1994, in the above-referenced docket.
Comment date: March 13, 1995, in accordance with Standard Paragraph
E at the end of this notice.
12. Southern Indiana Gas and Electric Company
[Docket No. ER95-600-000]
Take notice that on February 14, 1995, Southern Indiana Gas and
Electric Company (Southern Indiana), tendered for filing Amendments to
Coordination [[Page 12209]] Rates in its Interconnection Agreement with
Alcoa Generating Corporation to Reflect the Costs of Emissions
Allowances for FERC Rate Schedule No. 0029. A copy of the filing has
been sent to Alcoa Generating Corporation.
The proposed Amendment to the Rate Schedule is being made by an
abbreviated filing under FPA Section 205 and pursuant to the
Commission's Interim Rate issued in Docket No. PL95-1-000, Regarding
Ratemaking Treatment of the Cost of Emissions Allowances in
Coordination Rates and provides for cost recovery of SO2 emissions
allowances in energy sales. These amendments are limited to
coordination sales tariffs contained in the Agreement.
Waiver of the Commission's Notice Requirement is requested to allow
for an effective date of January 1, 1995, and Southern Indiana agrees
to the refund condition for allowance related charges assessed between
January 1, 1995, and the date the Commission issues an order accepting
the filing.
Comment date: March 14, 1995, in accordance with Standard Paragraph
E at the end of this notice.
13. Jersey Central Power & Light Company
Metropolitan Edison Company
Pennsylvania Electric Company
[Docket No. ER95-601-000]
Take notice that on February 14, 1995, GPU Service Corporation
(GPU), on behalf of Jersey Central Power & Light Company, Metropolitan
Edison Company and Pennsylvania Electric Company (jointly referred to
as the ``GPU Operating Companies''), filed an executed Service
Agreement between GPU and Electric Clearinghouse, Inc. (Electric
Clearinghouse), dated January 21, 1995. This Service Agreement
specifies that Electric Clearinghouse has agreed to the rates, terms
and conditions of the GPU Operating Companies'' Operating Capacity and/
or Energy Sales Tariff (Sales Tariff) designated as FERC Electric
Tariff, Original Volume No. 1. The Sales Tariff was accepted by the
Commission by letter order issued on February 10, 1995 in Jersey
Central Power & Light Company, Metropolitan Edison Company and
Pennsylvania Electric Company, Docket No. ER95-276-000 and allows GPU
and Electric Clearinghouse to enter into separately scheduled
transactions under which the GPU Operating Companies will make
available for sale, surplus operating capacity and/or energy at
negotiated rates that are no higher than the GPU Operating Companies'
cost of service.
GPU requests a waiver of the Commission's notice requirements for
good cause shown and an effective date of January 21, 1995 for the
Service Agreement.
GPU has served copies of the filing on regulatory agencies in New
Jersey and Pennsylvania.
Comment date: March 14, 1995, in accordance with Standard Paragraph
E at the end of this notice.
14. Central Illinois Light Company
[Docket No. ER95-602-000]
Take notice that on February 15, 1995, Central Illinois Light
Company (CILCO), 300 Liberty Street, Peoria, Illinois 61202, tendered
for filing with the Commission a Coordination Sales Tariff. Under the
Coordination Sales Tariff, CILCO will make Limited Term Power, Short-
Term Power, General Purpose Energy and Emergency Energy available to
customers upon mutual agreement. CILCO requests an effective date of
April 3, 1995, and accordingly seeks waiver of the Commission's notice
requirements. Copies of this filing were served on the Illinois
Commerce Commission and are available for public inspection at CILCO's
offices in Peoria, Illinois.
Comment date: March 14, 1995, in accordance with Standard Paragraph
E at the end of this notice.
15. Northeast Utilities Service Company
[Docket No. ER95-620-000]
Take notice that Northeast Utilities Service Company (NUSCO) on
February 17, 1995, tendered for filing, a Service Agreement with
Pennsylvania Power & Light Company (PP&L) under the NU System
Companies' System Power Sales/Exchange Tariff No. 6.
NUSCO states that a copy of this filing has been mailed to PP&L.
NUSCO requests that the Service Agreement become effective on March
1, 1995.
Comment date: March 13, 1995, in accordance with Standard Paragraph
E at the end of this notice.
16. Arizona Public Service Company
[Docket No. ER95-621-000]
Take notice that on February 17, 1995, Arizona Public Service
Company (APS), tendered for filing the proposed Power Sale Agreement
(Agreement) between APS and Nevada Power Company (NPC) having a
proposed effective date of June 1, 1995.
The Agreement proposes that APS will make available to NPC, when
pre-scheduled by NPC, 50 MW of firm power and energy for the period
June 1, through September 30 for each of the calendar years 1995, 1996
and 1997. The rate for sales under the Agreement contains a Capacity
Charge component and an Energy Charge component.
A copy of this filing has been served on NPC, the Arizona
Corporation Commission and the Nevada Public Service Commission.
Comment date: March 13, 1995, in accordance with Standard Paragraph
E at the end of this notice.
17. Orange and Rockland Utilities, Inc.
[Docket No. ER95-622-000]
Take notice that on February 17, 1995, Orange and Rockland
Utilities, Inc. (Orange and Rockland), One Blue Hill Plaza, Pearl
River, New York 10965, submitted for filing proposed rates and other
changes applicable to future service contracts executed under Orange
and Rockland's FERC Electric Tariff Original Volume (Buyback Tariff).
The Buyback Tariff provides for Orange and Rockland to purchase
capacity and associated energy from certain Orange and Rockland
customers. In addition to the new rates, the filing would reduce the
maximum amount of loans available to participating customers and would
modify the number and duration of opportunities for qualifying
customers to sell to Orange and Rockland. Orange and Rockland has
requested that the proposed changes become effective as of the date of
the filing.
Comment date: March 13, 1995, in accordance with Standard Paragraph
E at the end of this notice.
18. Midwest Power Systems Inc.
[Docket No. ES95-22-000]
Take notice that on February 23, 1995, Midwest Power Systems Inc.
filed an application under Sec. 204 of the Federal Power Act seeking
authorization to issue up to $250 million of promissory notes during
the period commencing April 16, 1995 and ending April 15, 1997, with a
final maturity date not later than April 15, 1998.
Comment date: March 24, 1995, in accordance with Standard Paragraph
E at the end of this notice.
19. White Oak Energy Company L.L.C. (Lockport Project)
[Docket No. QF95-122-000]
On February 22, 1995, White Oak Energy Company L.L.C. (White Oak)
tendered for filing an amendment to its filing in this docket.
The amendment pertains to information relating to the ownership
structure and technical aspects of White Oak's small power production
facility. No determination has been made that the submittal constitutes
a complete filing. [[Page 12210]]
Comment date: March 16, 1995, in accordance with Standard Paragraph
E at the end of this notice.
20. White Oak Energy Company L.L.C. (Joliet Project)
[Docket No. QF95-123-000]
On February 22, 1995, White Oak Energy Company L.L.C. (White Oak)
tendered for filing an amendment to its filing in this docket.
The amendment pertains to information relating to the ownership
structure and technical aspects of White Oak's small power production
facility. No determination has been made that the submittal constitutes
a complete filing.
Comment date: March 16, 1995, in accordance with Standard Paragraph
E at the end of this notice.
21. Osceola Power Limited Partnership
[Docket Nos. QF95-30-000 and QF95-30-001]
On February 24, 1995, Osceola Power Limited Partnership tendered
for filing an amendment to its December 2, 1994, filing in this docket.
The amendment pertains to technical requirements and the ownership
structure of the cogeneration facility. No determination has been made
that the submittal constitutes a complete filing.
Comment date: March 17, 1995, in accordance with Standard Paragraph
E at the end of this notice.
22. Western Systems Power Pool
[Docket No. ER91-195-019]
Take notice that on February 16, 1995, Western Systems Power Pool
(WSPP), tendered for filing revised copies of its quarterly report for
the fourth quarter of 1994 in the above-referenced docket.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-5384 Filed 3-3-95; 8:45 am]
BILLING CODE 6717-01-P