Take notice that on February 20, 1996, Columbia Gas Transmission
Corporation (Columbia), 1700 MacCorkle Avenue, SE., Charleston, West
Virginia 25314, filed a prior notice request with the Commission in
Docket No. CP96-205-000 pursuant to Section 157.205 of the Commission's
Regulations under the Natural Gas Act (NGA) for authorization to
upgrade an existing delivery point to Cincinnati Gas and Electric
Company (Cincinnati) in Butler County, Ohio, under Columbia's blanket
certificate issued in Docket No. CP83-76-000 pursuant to Section 7 of
the NGA, all as more fully set forth in the request which is open to
the public for inspection.
Columbia proposes to upgrade its existing Millville/Menton Road
Measuring Station \1\ in Butler County, at which Texas Eastern
Transmission Corporation (TETCO) has agreed to install additional
measurement and regulation equipment and station piping. Columbia
states that the proposed modifications would increase the capacity of
the Millville/Menton Road Measuring Station from its current capacity
of 7,600 Dth/day to 14,000 Dth/day in order to deliver gas to
Cincinnati, who would then deliver the gas to Oxford Natural Gas
Company (Oxford) at their existing Butler County Interconnection.
Columbia also states
[[Page 8924]]
that it would pay the estimated construction cost of $146,640.
\1\ Columbia owns this facility which is located on TETCO's Line
1 and serves as a Columbia receipt point from TETCO, as well as a
Columbia delivery point to Cincinnati.
---------------------------------------------------------------------------
Columbia states that it would provide gas service to Oxford under
Rate Schedules FTS and ITS of its FERC Gas Tariff. Columbia also states
that the contracted natural gas volumes would be within certificated
volumes.
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Section 157.205 of the
Regulations under the NGA (18 CFR 157.205) a protest to the request. If
no protest is filed within the allowed time, the proposed activity
shall be deemed to be authorized effective the day after the time
allowed for filing a protest. If a protest is filed and not withdrawn
within 30 days after the time allowed for filing a protest, the instant
request shall be treated as an application for authorization pursuant
to Section 7 of the NGA.
Lois D. Cashell,
Secretary.
[FR Doc. 96-5169 Filed 3-5-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 03/06/1996
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 96-5169
- Pages:
- 8923-8924 (2 pages)
- Docket Numbers:
- Docket No. CP96-205-000
- PDF File:
-
96-5169.pdf