98-5809. Baltimore Gas and Electric Company; Notice of Consideration of Issuance of Amendments To Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing  

  • [Federal Register Volume 63, Number 44 (Friday, March 6, 1998)]
    [Notices]
    [Pages 11312-11317]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-5809]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket Nos. 50-317 and 50-318]
    
    
    Baltimore Gas and Electric Company; Notice of Consideration of 
    Issuance of Amendments To Facility Operating Licenses, Proposed No 
    Significant Hazards Consideration Determination, and Opportunity for a 
    Hearing
    
        On Friday, January 31, 1997, a Federal Register Notice (62 FR 4816)
    
    [[Page 11313]]
    
    was published stating that the U.S. Nuclear Regulatory Commission (the 
    Commission) is considering issuance of an amendment to Facility 
    Operating License Nos. DPR-53 and DPR-69 issued to the Baltimore Gas 
    and Electric Company (BGE or the licensee) for operation of the Calvert 
    Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, located in Calvert 
    County, Maryland.
        The proposed amendments requested by the licensee in a letter dated 
    December 4, 1996, would represent a full conversion from the current 
    Technical Specifications (TSs) to a set of TS based on NUREG-1432, 
    Revision 1, ``Standard Technical Specifications, Combustion Engineering 
    Plants dated April 1995. Since that time, the Commission has received 
    supplements to the application dated March 27, June 9, June 18, July 
    21, August 19, September 10, October 6, October 20, October 23, 
    November 5, 1997, and January 12 and 28, 1998. Therefore, issues not 
    fully discussed in (62 FR 4816) are presented below.
        The proposed amendment includes the following:
        1. The licensee is proposing to add a new surveillance requirement 
    (SR) 3.4.9.2 to the Improved Technical Specifications (ITS) which will 
    require verification that the capacity of each required bank of 
    pressurizer heaters is equal to or greater than 150 kW every 24 months. 
    This is a more restrictive change.
        2. The licensee has proposed a change to the current TS 
    applicability for the pressurizer safety valves which require that both 
    safety valves be operable in Modes 1, 2, and 3 and that one safety 
    valve be operable in Modes 4 and 5. The ITS will modify these 
    applicability requirements for Mode 3 to specify that two safety valves 
    shall be operable with all reactor coolant system (RCS) cold leg 
    temperature >365  deg.F for Unit 1 and >301  deg.F for Unit 2. This is 
    a less restrictive change.
        3. The licensee proposes that the power-operated relief valve 
    (PORVs) be demonstrated operable by performance of a channel test once 
    per 92 days as part of the conversion to the ITS. The current TS 
    require that the PORVs be demonstrated operable by performance of a 
    Channel Function Test once per 31 days. This a less restrictive change.
        4. Current TS 3.4.6 2.C specifies that the RCS shall be limited to 
    ``1 gpm total primary--to secondary leakage through all steam 
    generators and 100 gallon-per-day through any one steam generator.'' 
    The proposed ITS LCO 3.4.1.3 eliminates the limit of 1 gpm total 
    primary-to-secondary leakage through all steam generators and thus will 
    only require a limit of 100 gallon per day through any one steam 
    generator. This is an administrative change.
        5. Current TS SR 4.5.2.f.2 requires verifying at least once per 
    Refueling Interval, during shutdown, that the high-pressure safety 
    injection pump and low-pressure safety injection pump (LPSI) start 
    automatically upon receipt of a safety injection actuation test signal. 
    Proposed ITS SR 3.5.2.6 retains this same requirement with a specified 
    frequency of 24 months, which is equivalent to the refueling interval. 
    The proposed ITS will add a new SR 3.5.2.7 which requires verification 
    that each LPSI pump stops on an actual or simulated actuation signal. 
    This a more restrictive change.
        6. The proposed amendment regarding the control room emergency 
    ventilation system (CREVS) changes the surveillance from 18 months to 
    24 months (each refueling cycle) for the following SR. Current TS SR 
    4.7.6.1.e.2 requires that each train of CREVS is demonstrated operable 
    at least once every 18 months by verifying that on a control room high 
    radiation test signal, the system automatically switches into a 
    recirculation mode of operation with flow through the HEPA filters and 
    charcoal adsorber banks and that both of the isolation valves in each 
    duct and common exhaust duct, and isolation valve in the toilet exhaust 
    area duct, close. The above change is less restrictive.
        7. The proposed amendment regarding the control room emergency 
    temperature system (CRETS) changes the surveillance interval from 62 
    days on a staggered basis (one train every 31 days) to 24 months (each 
    refueling interval) for the following SR:
    
        Current TS SR 4.7.6.1.a requires demonstrating that each CRETS 
    train is operable at least once every 62 days, on a staggered test 
    basis (one train every 31 days) by: (1) Deenergizing the backup 
    Control Room air conditioner; and (2) verifying that the emergency 
    Control Room air conditioners maintain the air temperature [less 
    than or equal to] 104  deg.F for at least 12 hours when in the 
    recirculation mode.
    
        SR 4.7.6.1.a changes to ITS SR 3.7.9.1 to require demonstrating 
    operability of CRETS at least every 24 months by verifying each CRETS 
    train has the capability to maintain control room temperature within 
    limits. The above changes are less restrictive.
        8. The proposed amendment regarding the spent fuel pool exhaust 
    ventilation system (SFPEVS) will change the surveillance interval from 
    18 months to 24 months (each refueling interval) for the following SR. 
    This is a less restrictive change.
        Current TS SR 4.9.12.d requires demonstrating that the SFPEVS is 
    operable at least once per 18 months by: (1) Verifying that the 
    pressure drop across the combined HEPA filters and charcoal adsorber 
    banks are <4 inches="" water="" gauge="" while="" operating="" the="" ventilation="" system="" at="" a="" flow="" rate="" of="" 32,000="" cfm="" plus="" or="" minus="" 10%;="" and="" (2)="" verifying="" that="" each="" exhaust="" fan="" maintains="" the="" spent="" fuel="" storage="" pool="" at="" a="" measurable="" negative="" pressure="" relative="" to="" the="" outside="" atmosphere="" during="" system="" operation.="" sr="" 4.9.12.d="" will="" change="" to="" its="" sr="" 3.7.11.3="" to="" require="" demonstrating="" that="" the="" sfpevs="" is="" operable="" at="" least="" once="" per="" 24="" months="" by="" verifying="" that="" each="" exhaust="" fan="" maintains="" the="" spent="" fuel="" pool="" at="" a="" measurable="" negative="" pressure="" relative="" to="" the="" outside="" atmosphere="" during="" system="" operation.="" 9.="" the="" proposed="" amendment="" regarding="" the="" penetration="" room="" exhaust="" ventilation="" system="" (prevs)="" changes="" the="" surveillance="" interval="" from="" 18="" months="" to="" 24="" months="" (each="" refueling="" interval="" for="" the="" following="" sr:="" current="" ts="" sr="" 4.6.6.1.d.2="" requires="" demonstrating="" that="" each="" prevs="" train="" is="" operable="" at="" least="" once="" per="" 18="" months="" by="" verifying="" that="" the="" filter="" train="" starts="" on="" a="" containment="" isolation="" test="" signal.="" sr="" 4.6.6.1.d.2="" changes="" to="" its="" sr="" 3.7.12.3="" to="" require="" demonstrating="" operability="" of="" the="" prevs="" at="" least="" once="" every="" 24="" months="" by="" verifying="" each="" prevs="" train="" starts="" on="" an="" actual="" or="" simulated="" actuation="" signal.="" the="" above="" change="" is="" less="" restrictive.="" before="" issuance="" of="" the="" proposed="" license="" amendment,="" the="" commission="" will="" have="" made="" findings="" required="" by="" the="" atomic="" energy="" act="" of="" 1954,="" as="" amended="" (the="" act)="" and="" the="" commission's="" regulations.="" the="" commission="" has="" made="" a="" proposed="" determination="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" under="" the="" commission's="" regulations="" in="" 10="" cfr="" 50.92,="" this="" means="" that="" operation="" of="" the="" facility="" in="" accordance="" with="" the="" proposed="" amendment="" would="" not="" (1)="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated;="" or="" (2)="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated;="" or="" (3)="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below.="" basis="" for="" proposed="" no="" significant="" hazards="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" [[page="" 11314]]="" significant="" hazards="" consideration="" which="" is="" presented="" below="" for="" the="" above="" items.="" item="" 1="" and="" item="" 5--more="" restrictive="" changes="" 1.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" changes="" provide="" more="" stringent="" requirements="" than="" previously="" existed="" in="" the="" technical="" specifications.="" each="" change="" was="" evaluated="" and="" it="" was="" determined="" that="" these="" more="" stringent="" requirements="" do="" not="" result="" in="" operation="" that="" will="" increase="" the="" probability="" of="" initiating="" an="" analyzed="" event.="" if="" anything,="" the="" new="" requirements="" may="" decrease="" the="" probability="" or="" consequences="" of="" an="" analyzed="" event="" by="" incorporating="" the="" more="" restrictive="" changes="" discussed="" above.="" the="" proposed="" changes="" do="" not="" alter="" assumptions="" relative="" to="" mitigation="" of="" an="" accident="" or="" transient.="" the="" more="" restrictive="" requirements="" continue="" to="" ensure="" process="" variables,="" structures,="" systems,="" and="" components="" are="" maintained="" consistent="" with="" the="" safety="" analyses="" and="" licensing="" basis.="" the="" proposed="" changes="" do="" not="" significantly="" affect="" initiators="" or="" mitigation="" of="" analyzed="" events,="" and="" therefore="" do="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" changes="" provide="" more="" stringent="" requirements="" than="" previously="" existed="" in="" the="" technical="" specifications.="" the="" changes="" will="" not="" involve="" a="" significant="" change="" in="" design="" or="" operation="" of="" the="" plant.="" no="" hardware="" is="" being="" added="" to="" the="" plant="" as="" part="" of="" the="" proposed="" changes.="" the="" proposed="" changes="" will="" not="" introduce="" any="" new="" accident="" initiators.="" the="" changes="" do="" impose="" different="" requirements.="" however,="" these="" changes="" are="" consistent="" with="" the="" assumptions="" in="" the="" safety="" analyses="" and="" licensing="" basis.="" therefore,="" the="" changes="" do="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" does="" this="" change="" involve="" a="" significant="" reduction="" in="" margin="" of="" safety?="" the="" proposed="" changes="" provide="" more="" stringent="" requirements="" than="" previously="" existed="" in="" the="" technical="" specifications.="" an="" evaluation="" of="" these="" changes="" concluded="" that="" adding="" these="" more="" restrictive="" requirements="" either="" increases="" or="" has="" no="" impact="" on="" the="" margin="" of="" safety.="" the="" changes="" provide="" additional="" restrictions="" which="" may="" enhance="" plant="" safety.="" the="" changes="" maintain="" requirements="" within="" the="" safety="" analyses="" and="" licensing="" basis.="" as="" such,="" no="" question="" of="" safety="" is="" involved.="" therefore,="" the="" changes="" do="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" item="" 2--less="" restrictive="" changes="" 1.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" deletes="" the="" mode="" 3="" with="" any="" cold="" leg="" temperature="" [less="" than="" or="" equal="" to]="" 365="" deg.f="" ([less="" than="" or="" equal="" to]="" 301="" deg.f="" for="" unit="" 2)="" and="" the="" mode="" 4="" and="" 5="" applicabilities="" from="" the="" modes="" of="" applicability="" for="" the="" pressurizer="" safety="" valves.="" the="" pressurizer="" safety="" valves="" are="" not="" initiators="" of="" any="" analyzed="" event.="" the="" pressurizer="" safety="" valves="" are="" not="" required="" to="" mitigate="" any="" accidents="" in="" mode="" 3="" with="" cold="" leg="" temperature="" [less="" than="" or="" equal="" to]="" 365="" deg.f="" ([less="" than="" or="" equal="" to]="" 301="" deg.f="" for="" unit="" 2),="" or="" in="" modes="" 4="" or="" 5.="" in="" mode="" 3="" with="" any="" cold="" leg="" temperature="" [less="" than="" or="" equal="" to]="" 365="" deg.f="" ([less="" than="" or="" equal="" to]="" 301="" deg.f="" for="" unit="" 2)="" overpressure="" protection="" is="" provided="" by="" the="" low="" temperature="" overpressure="" protection="" (ltop)="" system.="" the="" change="" will="" not="" alter="" assumptions="" relative="" to="" the="" mitigation="" of="" an="" accident="" or="" transient.="" the="" proposed="" changes="" do="" not="" significantly="" affect="" initiators="" or="" mitigation="" of="" analyzed="" events,="" and="" therefore="" do="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" previously="" evaluated?="" the="" proposed="" change="" deletes="" the="" mode="" 3="" with="" any="" cold="" leg="" temperature="" [less="" than="" or="" equal="" to]="" 365="" deg.f="" ([less="" than="" or="" equal="" to]="" 301="" deg.f="" for="" unit="" 2),="" and="" the="" mode="" 4="" and="" 5="" applicabilities="" from="" the="" modes="" of="" applicability="" for="" the="" pressurizer="" safety="" valves.="" the="" change="" will="" not="" involve="" a="" significant="" change="" in="" design="" or="" operation="" of="" the="" plant.="" no="" hardware="" is="" being="" added="" to="" the="" plant="" as="" part="" of="" the="" proposed="" change.="" the="" proposed="" change="" will="" not="" introduce="" any="" new="" accident="" initiators.="" therefore,="" the="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" does="" this="" change="" involve="" a="" significant="" reduction="" in="" margin="" of="" safety?="" the="" proposed="" change="" deletes="" the="" mode="" 3="" with="" any="" cold="" leg="" temperature="" [less="" than="" or="" equal="" to]="" 365="" deg.f="" ([less="" than="" or="" equal="" to]="" 301="" deg.f="" for="" unit="" 2),="" and="" mode="" 4="" and="" 5="" applicabilities="" from="" the="" modes="" of="" applicability="" for="" the="" pressurizer="" safety="" valves.="" the="" pressurizer="" safety="" valves="" are="" not="" required="" for="" overpressure="" protection="" in="" mode="" 3="" with="" any="" cold="" leg="" temperature="" [less="" than="" or="" equal="" to]="" 365="" deg.f="" ([less="" than="" or="" equal="" to]="" 301="" deg.f="" for="" unit="" 2),="" or="" in="" modes="" 4="" or="" 5.="" the="" overpressure="" protection="" in="" these="" modes="" are="" provided="" by="" the="" ltop="" system.="" therefore,="" the="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" item="" 3--less="" restrictive="" change="" 1.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" decreases="" the="" surveillance="" frequency="" for="" the="" porv="" special="" test="" exception="" from="" 31="" days="" to="" 92="" days.="" decreasing="" the="" porv="" special="" test="" exception="" frequency="" to="" 92="" days="" is="" not="" an="" initiator="" of="" any="" analyzed="" event.="" the="" porv="" shares="" the="" same="" instrumentation="" as="" the="" reactor="" protective="" system="" pressurizer="" high="" function,="" which="" was="" approved="" for="" quarterly="" channel="" functional="" testing="" in="" an="" nrc="" safety="" evaluation="" report,="" dated="" august="" 24,="" 1994.="" a="" plant-specific="" setpoint="" drift="" analysis="" demonstrated="" that="" the="" observed="" changes="" in="" instrument="" uncertainties="" for="" extended="" surveillance="" test="" intervals="" do="" not="" exceed="" the="" current="" 30-day="" setpoint="" assumptions.="" this="" provides="" confidence="" the="" 90-92="" day="" test="" interval="" will="" not="" impact="" the="" ability="" of="" the="" porv="" to="" perform="" its="" safety="" function.="" the="" change="" will="" not="" significantly="" alter="" assumptions="" relative="" to="" the="" mitigation="" of="" an="" accident="" or="" transient.="" the="" proposed="" changes="" do="" not="" significantly="" affect="" initiators="" or="" mitigation="" of="" analyzed="" events,="" and="" therefore="" do="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" previously="" evaluated?="" the="" proposed="" change="" decreases="" the="" surveillance="" frequency="" for="" the="" porv="" channel="" functional="" test="" from="" 31="" days="" to="" 92="" days.="" the="" change="" will="" not="" involve="" a="" significant="" change="" in="" design="" or="" operation="" of="" the="" plant.="" no="" hardware="" is="" being="" added="" to="" the="" plant="" as="" part="" of="" the="" proposed="" change.="" the="" proposed="" change="" will="" not="" introduce="" any="" new="" accident="" initiators.="" therefore,="" the="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" does="" this="" change="" involve="" a="" significant="" reduction="" in="" margin="" of="" safety?="" the="" proposed="" change="" decreases="" the="" surveillance="" frequency="" for="" the="" porv="" channel="" functional="" test="" from="" 31="" days="" to="" 92="" days.="" the="" porv="" shares="" the="" same="" instrumentation="" as="" the="" reactor="" protective="" system="" pressurizer="" pressure="" high="" function,="" which="" was="" approved="" for="" quarterly="" channel="" functional="" testing="" in="" an="" nrc="" safety="" evaluation="" report,="" dated="" august="" 24,="" 1994.="" this="" change="" makes="" the="" testing="" frequency="" for="" the="" porv="" consistent="" with="" the="" reactor="" protective="" system="" high="" pressurizer="" function,="" which="" shares="" the="" same="" instrumentation.="" the="" core="" melt="" frequency="" remains="" unchanged.="" also,="" the="" instrument="" drift="" resulting="" from="" the="" proposed="" surveillance="" interval="" is="" less="" than="" the="" instrument="" drift="" presently="" assumed="" for="" the="" current="" surveillance="" interval.="" therefore,="" the="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" item="" 4--administrative="" change="" 1.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" changes="" involve="" reformatting,="" renumbering,="" and="" rewording="" of="" the="" existing="" technical="" specifications,="" along="" with="" the="" incorporation="" of="" current="" plant="" practices="" and="" other="" changes,="" as="" discussed="" above,="" in="" order="" to="" be="" consistent="" with="" nureg-1432.="" these="" changes="" involve="" no="" technical="" changes="" to="" the="" existing="" technical="" specifications.="" specifically,="" there="" will="" be="" no="" change="" in="" the="" requirements="" imposed="" on="" calvert="" cliffs="" due="" to="" these="" changes.="" thus,="" the="" changes="" are="" administrative="" in="" nature="" and="" do="" not="" impact="" initiators="" of="" analyzed="" events.="" the="" proposed="" changes="" do="" not="" significantly="" affect="" initiators="" or="" mitigation="" of="" analyzed="" events,="" and="" therefore="" do="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" changes="" involve="" reformatting,="" renumbering,="" and="" rewording="" of="" the="" existing="" technical="" specifications,="" along="" with="" the="" incorporation="" of="" current="" plant="" [[page="" 11315]]="" practices="" and="" other="" changes,="" as="" discussed="" above,="" in="" order="" to="" be="" consistent="" with="" nureg-1432.="" the="" changes="" will="" not="" involve="" a="" significant="" change="" in="" design="" or="" operation="" of="" the="" plant.="" no="" hardware="" is="" being="" added="" to="" the="" plant="" as="" part="" of="" the="" proposed="" change.="" the="" proposed="" changes="" will="" not="" introduce="" any="" new="" accident="" initiators.="" therefore,="" the="" changes="" do="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" does="" this="" change="" involve="" a="" significant="" reduction="" in="" margin="" of="" safety?="" the="" proposed="" changes="" involve="" reformatting,="" renumbering,="" and="" rewording="" of="" the="" existing="" technical="" specifications,="" along="" with="" the="" incorporation="" of="" current="" plant="" practices="" and="" other="" changes,="" as="" discussed="" above,="" in="" order="" to="" be="" consistent="" with="" nureg-1432.="" the="" changes="" are="" administrative="" in="" nature="" and="" will="" not="" involve="" any="" technical="" changes.="" the="" changes="" will="" not="" reduce="" a="" margin="" of="" safety="" because="" it="" has="" no="" impact="" on="" any="" safety="" analysis="" assumptions.="" therefore,="" the="" changes="" do="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" item="" 6--less="" restrictive="" changes="" 1.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" decreases="" the="" surveillance="" frequency="" from="" 18="" to="" 24="" months="" for="" verifying="" that="" the="" control="" room="" emergency="" ventilation="" system="" (crevs)="" will="" actuate="" on="" an="" actual="" or="" simulated="" actuation="" signal.="" the="" crevs="" is="" not="" an="" initiator="" to="" any="" accident="" previously="" evaluated="" so="" there="" is="" no="" change="" in="" the="" probability="" of="" an="" accident.="" the="" 24-month="" test="" frequency="" is="" sufficient="" to="" verify="" that="" the="" equipment="" will="" actuate="" if="" needed,="" so="" the="" equipment="" will="" continue="" to="" be="" able="" to="" mitigate="" the="" consequences="" of="" accidents="" previously="" evaluated.="" therefore,="" this="" change="" will="" not="" involve="" an="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" change="" decreases="" the="" surveillance="" frequency="" from="" 18="" to="" 24="" months="" for="" verifying="" that="" the="" crevs="" will="" actuate="" on="" an="" actual="" or="" simulated="" actuation="" signal.="" this="" change="" will="" not="" physically="" alter="" the="" plant="" (no="" new="" or="" different="" types="" of="" equipment="" will="" be="" installed).="" the="" change="" does="" not="" require="" any="" new="" or="" unusual="" operator="" actions.="" therefore,="" the="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" does="" the="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" the="" proposed="" change="" decreased="" the="" surveillance="" frequency="" from="" 18="" to="" 24="" months="" for="" verifying="" that="" the="" crevs="" will="" actuate="" on="" an="" actual="" or="" simulated="" actuation="" signal.="" a="" review="" of="" previously="" performed="" surveillances="" determined="" that="" no="" failures="" have="" been="" found="" during="" the="" performance="" of="" this="" sr="" once="" per="" 18="" months.="" given="" the="" performance="" history,="" there="" is="" no="" reason="" to="" believe="" that="" a="" frequency="" of="" 24="" months="" would="" result="" in="" reduced="" reliability="" of="" the="" system.="" therefore,="" this="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" the="" margin="" of="" safety.="" item="" 7--less="" restrictive="" change="" 1.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" will="" decrease="" the="" frequency="" from="" 62="" days="" on="" a="" staggered="" test="" basis="" (one="" train="" every="" 31="" days)="" to="" 24="" months="" for="" verifying="" that="" the="" crets="" can="" maintain="" temperature="" in="" the="" control="" room="" at="" [less="" than="" or="" equal="" to]="" 104="" deg.f.="" this="" change="" will="" not="" significantly="" increase="" the="" possibility="" of="" an="" accident="" previously="" evaluated.="" the="" crets="" is="" not="" an="" initiator="" of="" any="" analyzed="" event.="" this="" change="" will="" not="" significantly="" increase="" the="" consequences="" of="" an="" accident.="" the="" crets="" will="" still="" be="" tested="" at="" a="" frequency="" that="" will="" show="" it="" can="" maintain="" control="" room="" temperature.="" review="" of="" the="" past="" 10="" years="" of="" data="" has="" shown="" that="" during="" this="" period="" the="" test="" has="" never="" failed.="" this="" change="" will="" not="" significantly="" affect="" the="" assumptions="" relative="" to="" the="" mitigation="" of="" accidents="" or="" transients.="" therefore,="" the="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" of="" consequence="" of="" an="" accident="" previously="" evaluated.="" 2.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" change="" will="" decrease="" the="" frequency="" from="" 62="" days="" on="" a="" staggered="" test="" basis="" (one="" train="" every="" 31="" days)="" to="" 24="" months="" for="" verifying="" that="" the="" crets="" can="" maintain="" temperature="" in="" the="" control="" room="" at="" [less="" than="" or="" equal="" to]="" 104="" deg.f.="" this="" change="" does="" not="" involve="" a="" significant="" change="" in="" the="" design="" or="" operation="" of="" the="" plant.="" no="" hardware="" is="" being="" added="" to="" the="" plant="" as="" part="" of="" the="" proposed="" change.="" the="" proposed="" change="" will="" not="" introduce="" any="" new="" accident="" initiators.="" therefore,="" the="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" does="" the="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" the="" proposed="" change="" will="" decrease="" the="" frequency="" from="" 62="" days="" on="" a="" staggered="" test="" basis="" (one="" train="" every="" 31="" days)="" to="" 24="" months="" for="" verifying="" that="" the="" crets="" can="" maintain="" temperature="" in="" the="" control="" room="" at="" [less="" than="" or="" equal="" to]="" 104="" deg.f.="" the="" margin="" of="" safety="" is="" not="" significantly="" affected="" by="" this="" change.="" the="" surveillance="" will="" still="" be="" performed="" at="" an="" interval="" which="" will="" prove="" the="" crets="" remains="" operable="" based="" on="" an="" evaluation="" of="" past="" surveillance="" history.="" also,="" increasing="" the="" surveillance="" interval="" will="" prevent="" inadvertent="" wear="" and="" tear="" on="" the="" system="" due="" to="" over="" testing,="" which="" can="" possibly="" lead="" to="" premature="" failures.="" therefore,="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" item="" 8--less="" restrictive="" change="" 1.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" decreases="" the="" surveillance="" frequency="" from="" 18="" months="" to="" 24="" months="" for="" verifying="" that="" the="" sfpevs="" can="" maintain="" a="" measurable="" negative="" pressure="" in="" the="" spent="" fuel="" pool="" area="" of="" the="" auxiliary="" building.="" this="" change="" will="" not="" affect="" the="" probability="" of="" an="" accident.="" the="" sfpevs="" is="" not="" an="" initiator="" of="" any="" analyzed="" event.="" the="" change="" will="" not="" affect="" the="" consequences="" of="" an="" accident.="" the="" 24-="" month="" frequency="" is="" sufficient="" to="" ensure="" that="" the="" sfpevs="" can="" maintain="" a="" measurable="" negative="" pressure="" in="" the="" spent="" fuel="" pool="" area.="" the="" change="" will="" not="" alter="" assumptions="" relative="" to="" the="" mitigation="" of="" an="" accident="" or="" transient.="" therefore,="" the="" change="" will="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequence="" of="" an="" accident="" previously="" evaluated.="" 2.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" change="" decreases="" the="" surveillance="" frequency="" from="" 18="" months="" to="" 24="" months="" for="" verifying="" that="" the="" sfpevs="" can="" maintain="" a="" measurable="" negative="" pressure="" in="" the="" spent="" fuel="" pool="" area="" of="" the="" auxiliary="" building.="" this="" change="" will="" not="" physically="" alter="" the="" plant="" (no="" new="" or="" different="" type="" of="" equipment="" will="" be="" installed).="" the="" change="" does="" not="" require="" any="" new="" or="" unusual="" operator="" actions.="" therefore,="" the="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" does="" the="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" the="" proposed="" change="" decreases="" the="" surveillance="" frequency="" from="" 18="" to="" 24="" months="" for="" verifying="" that="" the="" sfpevs="" can="" maintain="" a="" measurable="" negative="" pressure="" in="" the="" spent="" fuel="" pool="" area="" of="" the="" auxiliary="" building.="" the="" margin="" of="" safety="" is="" not="" significantly="" affected="" by="" this="" change.="" the="" failure="" history="" for="" this="" sr="" has="" shown="" that="" no="" failures="" have="" occurred="" in="" the="" previous="" ten="" years.="" the="" proposed="" frequency="" will="" continue="" to="" prove="" that="" the="" sfpevs="" will="" maintain="" a="" negative="" pressure="" in="" the="" spent="" fuel="" pool="" area.="" therefore,="" the="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" item="" 9--less="" restrictive="" change="" 1.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" decreases="" the="" surveillance="" frequency="" from="" 18="" to="" 24="" months="" for="" verifying="" that="" the="" penetration="" room="" emergency="" ventilation="" system="" (prevs)="" will="" actuate="" on="" an="" actual="" or="" simulated="" actuation="" signal.="" the="" prevs="" is="" not="" an="" initiator="" to="" any="" accident="" previously="" evaluated="" so="" there="" is="" no="" change="" in="" the="" probability="" of="" an="" accident.="" the="" 24-month="" test="" frequency="" is="" sufficient="" to="" verify="" that="" the="" equipment="" will="" actuate="" if="" needed="" so="" the="" equipment="" will="" continue="" to="" be="" able="" to="" mitigate="" the="" consequences="" of="" accidents="" previously="" evaluated.="" therefore,="" this="" change="" will="" not="" involve="" an="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" change="" decreases="" the="" surveillance="" frequency="" from="" 18="" to="" 24="" months="" for="" verifying="" that="" the="" prevs="" will="" actuate="" on="" an="" actual="" or="" simulated="" actuation="" signal.="" this="" change="" will="" not="" physically="" alter="" the="" plant="" (no="" new="" or="" different="" types="" of="" equipment="" will="" be="" installed).="" the="" change="" does="" not="" require="" any="" new="" or="" unusual="" operator="" actions.="" therefore,="" this="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" [[page="" 11316]]="" 3.="" does="" the="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" the="" proposed="" change="" decreases="" the="" surveillance="" frequency="" from="" 18="" to="" 24="" months="" for="" verifying="" that="" the="" prevs="" will="" actuate="" on="" an="" actual="" or="" simulated="" actuation="" signal.="" a="" review="" of="" previously="" performed="" surveillances="" determined="" that="" no="" failures="" have="" been="" found="" during="" the="" performance="" of="" this="" sr="" once="" per="" 18="" months.="" given="" the="" performance="" history,="" there="" is="" no="" reason="" to="" believe="" that="" a="" frequency="" of="" 24="" months="" would="" result="" in="" reduced="" reliability="" of="" the="" system.="" therefore,="" this="" change="" will="" not="" involve="" an="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analyses="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration,="" regarding="" the="" matters="" discussed="" above.="" the="" commission="" is="" seeking="" public="" comments="" on="" this="" proposed="" determination.="" any="" comments="" received="" within="" 30="" days="" after="" the="" date="" of="" publication="" of="" this="" notice="" will="" be="" considered="" in="" making="" any="" final="" determination.="" normally,="" the="" commission="" will="" not="" issue="" the="" amendment="" until="" the="" expiration="" of="" the="" 30-day="" notice="" period.="" however,="" should="" circumstances="" change="" during="" the="" notice="" period="" such="" that="" failure="" to="" act="" in="" a="" timely="" way="" would="" result,="" for="" example,="" in="" derating="" or="" shutdown="" of="" the="" facility,="" the="" commission="" may="" issue="" the="" license="" amendment="" before="" the="" expiration="" of="" the="" 30-day="" notice="" period,="" provided="" that="" its="" final="" determination="" is="" that="" the="" amendment="" involves="" no="" significant="" hazards="" consideration.="" the="" final="" determination="" will="" consider="" all="" public="" and="" state="" comments="" received.="" should="" the="" commission="" take="" this="" action,="" it="" will="" publish="" in="" the="" federal="" register="" a="" notice="" of="" issuance="" and="" provide="" for="" opportunity="" for="" a="" hearing="" after="" issuance.="" the="" commission="" expects="" that="" the="" need="" to="" take="" this="" action="" will="" occur="" very="" infrequently.="" written="" comments="" may="" be="" submitted="" by="" mail="" to="" the="" chief,="" rules="" and="" directives="" branch,="" division="" of="" administrative="" services,="" office="" of="" administration,="" u.s.="" nuclear="" regulatory="" commission,="" washington,="" dc="" 20555-0001,="" and="" should="" cite="" the="" publication="" date="" and="" page="" number="" of="" this="" federal="" register="" notice.="" written="" comments="" may="" also="" be="" delivered="" to="" room="" 6d59,="" two="" white="" flint="" north,="" 11545="" rockville="" pike,="" rockville,="" maryland,="" from="" 7:30="" a.m.="" to="" 4:15="" p.m.="" federal="" workdays.="" copies="" of="" written="" comments="" received="" may="" be="" examined="" at="" the="" nrc="" public="" document="" room,="" the="" gelman="" building,="" 2120="" l="" street,="" nw.,="" washington,="" dc.="" the="" filing="" of="" requests="" for="" hearing="" and="" petitions="" for="" leave="" to="" intervene="" is="" discussed="" below.="" by="" april="" 6,="" 1998,="" the="" licensee="" may="" file="" a="" request="" for="" a="" hearing="" with="" respect="" to="" issuance="" of="" the="" amendment="" to="" the="" subject="" facility="" operating="" license="" and="" any="" person="" whose="" interest="" may="" be="" affected="" by="" this="" proceeding="" and="" who="" wishes="" to="" participate="" as="" a="" party="" in="" the="" proceeding="" must="" file="" a="" written="" request="" for="" a="" hearing="" and="" a="" petition="" for="" leave="" to="" intervene.="" requests="" for="" a="" hearing="" and="" a="" petition="" for="" leave="" to="" intervene="" shall="" be="" filed="" in="" accordance="" with="" the="" commission's="" ``rules="" of="" practice="" for="" domestic="" licensing="" proceedings''="" in="" 10="" cfr="" part="" 2.="" interested="" persons="" should="" consult="" a="" current="" copy="" of="" 10="" cfr="" 2.714="" which="" is="" available="" at="" the="" commission's="" public="" document="" room,="" the="" gelman="" building,="" 2120="" l="" street,="" nw.,="" washington,="" dc,="" and="" at="" the="" local="" public="" document="" room="" located="" at="" the="" calvert="" county="" library,="" prince="" frederick,="" maryland="" 20678.="" if="" a="" request="" for="" a="" hearing="" or="" petition="" for="" leave="" to="" intervene="" is="" filed="" by="" the="" above="" date,="" the="" commission="" or="" an="" atomic="" safety="" and="" licensing="" board,="" designated="" by="" the="" commission="" or="" by="" the="" chairman="" of="" the="" atomic="" safety="" and="" licensing="" board="" panel,="" will="" rule="" on="" the="" request="" and/or="" petition;="" and="" the="" secretary="" or="" the="" designated="" atomic="" safety="" and="" licensing="" board="" will="" issue="" a="" notice="" of="" hearing="" or="" an="" appropriate="" order.="" as="" required="" by="" 10="" cfr="" 2.714,="" a="" petition="" for="" leave="" to="" intervene="" shall="" set="" forth="" with="" particularity="" the="" interest="" of="" the="" petitioner="" in="" the="" proceeding,="" and="" how="" that="" interest="" may="" be="" affected="" by="" the="" results="" of="" the="" proceeding.="" the="" petition="" should="" specifically="" explain="" the="" reasons="" why="" intervention="" should="" be="" permitted="" with="" particular="" reference="" to="" the="" following="" factors:="" (1)="" the="" nature="" of="" the="" petitioner's="" right="" under="" the="" act="" to="" be="" made="" party="" to="" the="" proceeding;="" (2)="" the="" nature="" and="" extent="" of="" the="" petitioner's="" property,="" financial,="" or="" other="" interest="" in="" the="" proceeding;="" and="" (3)="" the="" possible="" effect="" of="" any="" order="" which="" may="" be="" entered="" in="" the="" proceeding="" on="" the="" petitioner's="" interest.="" the="" petition="" should="" also="" identify="" the="" specific="" aspect(s)="" of="" the="" subject="" matter="" of="" the="" proceeding="" as="" to="" which="" petitioner="" wishes="" to="" intervene.="" any="" person="" who="" has="" filed="" a="" petition="" for="" leave="" to="" intervene="" or="" who="" has="" been="" admitted="" as="" a="" party="" may="" amend="" the="" petition="" without="" requesting="" leave="" of="" the="" board="" up="" to="" 15="" days="" prior="" to="" the="" first="" prehearing="" conference="" scheduled="" in="" the="" proceeding,="" but="" such="" an="" amended="" petition="" must="" satisfy="" the="" specificity="" requirements="" described="" above.="" not="" later="" than="" 15="" days="" prior="" to="" the="" first="" prehearing="" conference="" scheduled="" in="" the="" proceeding,="" a="" petitioner="" shall="" file="" a="" supplement="" to="" the="" petition="" to="" intervene="" which="" must="" include="" a="" list="" of="" the="" contentions="" which="" are="" sought="" to="" be="" litigated="" in="" the="" matter.="" each="" contention="" must="" consist="" of="" a="" specific="" statement="" of="" the="" issue="" of="" law="" or="" fact="" to="" be="" raised="" or="" controverted.="" in="" addition,="" the="" petitioner="" shall="" provide="" a="" brief="" explanation="" of="" the="" bases="" of="" the="" contention="" and="" a="" concise="" statement="" of="" the="" alleged="" facts="" or="" expert="" opinion="" which="" support="" the="" contention="" and="" on="" which="" the="" petitioner="" intends="" to="" rely="" in="" proving="" the="" contention="" at="" the="" hearing.="" the="" petitioner="" must="" also="" provide="" references="" to="" those="" specific="" sources="" and="" documents="" of="" which="" the="" petitioner="" is="" aware="" and="" on="" which="" the="" petitioner="" intends="" to="" rely="" to="" establish="" those="" facts="" or="" expert="" opinion.="" petitioner="" must="" provide="" sufficient="" information="" to="" show="" that="" a="" genuine="" dispute="" exists="" with="" the="" applicant="" on="" a="" material="" issue="" of="" law="" or="" fact.="" contentions="" shall="" be="" limited="" to="" matters="" within="" the="" scope="" of="" the="" amendment="" under="" consideration.="" the="" contention="" must="" be="" one="" which,="" if="" proven,="" would="" entitle="" the="" petitioner="" to="" relief.="" a="" petitioner="" who="" fails="" to="" file="" such="" a="" supplement="" which="" satisfies="" these="" requirements="" with="" respect="" to="" at="" least="" one="" contention="" will="" not="" be="" permitted="" to="" participate="" as="" a="" party.="" those="" permitted="" to="" intervene="" become="" parties="" to="" the="" proceeding,="" subject="" to="" any="" limitations="" in="" the="" order="" granting="" leave="" to="" intervene,="" and="" have="" the="" opportunity="" to="" participate="" fully="" in="" the="" conduct="" of="" the="" hearing,="" including="" the="" opportunity="" to="" present="" evidence="" and="" cross-="" examine="" witnesses.="" if="" a="" hearing="" is="" requested,="" the="" commission="" will="" make="" a="" final="" determination="" on="" the="" issue="" of="" no="" significant="" hazards="" consideration.="" the="" final="" determination="" will="" serve="" to="" decide="" when="" the="" hearing="" is="" held.="" if="" the="" final="" determination="" is="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration,="" the="" commission="" may="" issue="" the="" amendment="" and="" make="" it="" immediately="" effective,="" notwithstanding="" the="" request="" for="" a="" hearing.="" any="" hearing="" held="" would="" take="" place="" after="" issuance="" of="" the="" amendment.="" if="" the="" final="" determination="" is="" that="" the="" amendment="" request="" involves="" a="" significant="" hazards="" consideration,="" any="" hearing="" held="" would="" take="" place="" before="" the="" issuance="" of="" any="" amendment.="" a="" request="" for="" a="" hearing="" or="" a="" petition="" for="" leave="" to="" intervene="" must="" be="" filed="" with="" the="" secretary="" of="" the="" commission,="" u.s.="" nuclear="" regulatory="" commission,="" washington,="" dc="" 20555-0001,="" attention:="" rulemakings="" and="" adjudications="" staff,="" or="" may="" be="" delivered="" to="" the="" commission's="" [[page="" 11317]]="" public="" document="" room,="" the="" gelman="" building,="" 2120="" l="" street,="" nw.,="" washington,="" dc,="" by="" the="" above="" date.="" a="" copy="" of="" the="" petition="" should="" also="" be="" sent="" to="" the="" office="" of="" the="" general="" counsel,="" u.s.="" nuclear="" regulatory="" commission,="" washington,="" dc="" 20555-0001,="" and="" to="" jay="" e.="" silberg,="" esquire,="" shaw,="" pittman,="" potts="" and="" trowbridge,="" 2300="" n="" street,="" nw.,="" washington,="" dc="" 20037,="" attorney="" for="" the="" licensee.="" nontimely="" filings="" of="" petitions="" for="" leave="" to="" intervene,="" amended="" petitions,="" supplemental="" petitions="" and/or="" requests="" for="" hearing="" will="" not="" be="" entertained="" absent="" a="" determination="" by="" the="" commission,="" the="" presiding="" officer="" or="" the="" presiding="" atomic="" safety="" and="" licensing="" board="" that="" the="" petition="" and/or="" request="" should="" be="" granted="" based="" upon="" a="" balancing="" of="" the="" factors="" specified="" in="" 10="" cfr="" 2.714(a)(1)(i)-(v)="" and="" 2.714(d).="" for="" further="" details="" with="" respect="" to="" this="" action,="" see="" the="" application="" for="" amendment="" dated="" december="" 4,="" 1996,="" as="" supplemented="" march="" 27,="" june="" 9,="" june="" 18,="" july="" 21,="" august="" 14,="" august="" 19,="" september="" 10,="" october="" 6,="" october="" 20,="" october="" 23,="" november="" 5,="" 1997,="" and="" january="" 12="" and="" january="" 28,="" 1998,="" which="" is="" available="" for="" public="" inspection="" at="" the="" commission's="" public="" document="" room,="" the="" gelman="" building,="" 2120="" l="" street,="" nw.,="" washington,="" dc,="" and="" at="" the="" local="" public="" document="" room="" located="" at="" the="" calvert="" county="" library,="" prince="" frederick,="" maryland="" 20678.="" dated="" at="" rockville,="" maryland,="" this="" 2nd="" day="" of="" march="" 1998.="" for="" the="" nuclear="" regulatory="" commission.="" alexander="" w.="" dromerick,="" senior="" project="" manager,="" project="" directorate="" i-1,="" division="" of="" reactor="" projects--i/ii,="" office="" of="" nuclear="" reactor="" regulation.="" [fr="" doc.="" 98-5809="" filed="" 3-5-98;="" 8:45="" am]="" billing="" code="" 7590-01-p="">

Document Information

Published:
03/06/1998
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
98-5809
Pages:
11312-11317 (6 pages)
Docket Numbers:
Docket Nos. 50-317 and 50-318