98-5842. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 63, Number 44 (Friday, March 6, 1998)]
    [Notices]
    [Pages 11234-11235]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-5842]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-5489-6]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared February 16, 1998 Through 
    February 20, 1998 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 564-7167. An explanation of the ratings assigned to draft 
    environmental impact statements (EISs) was published in FR dated April 
    11, 1998 (62 FR 16154).
    
    Draft EISs
    
        ERP No. D-AFS-L61216-WA Rating LO, White Pass Ski Area Expansion, 
    Special-Use-Permit, Pigtail Basin and Hogback Basin, Wenatchee and 
    Gifford, Pinchot National Forests, Yakima and Lewis Counties, WA.
        Summary: EPA Region 10 used a screening tool to conduct a limited 
    review of the White Pass Ski Area. Based upon the screen, EPA does not 
    foresee having any environmental objections to the proposed project. 
    Therefore, EPA will not be conducting a detailed review.
        ERP No. D-FAA-B51025-NH Rating EC2, Manchester (New Hampshire) 
    Airport Master Plan Update, Improvements to Airside and Landside 
    Facilities, Airport Layout Plan, Permits and Approvals, Manchester, NH.
        Summary: EPA expressed environmental concerns regarding wetland and 
    air quality impact. EPA requested additional wetland mitigation and air 
    conformity analysis.
        ERP No. D-FHW-L40203-AK Rating EO2, Juneau Access Transportation 
    Project, Improvements in the Lynn Canal/Taiya Inlet Corridor between 
    Juneau and Haines/Skagway, Special-Use-Permit and COE Section 10 and 
    404 Permits, Tongass National Forest, Klondike Gold Rush National 
    Historic Park, Haines State Forest, City and Borough of Juneau, Haines 
    Borough, Cities Haines and Skagway, AK.
        Summary: EPA expressed environmental objections to the East Lynn 
    Canal Highway alternative due to potentially significant impacts to 
    Berners Bay, an area containing high resource and recreational values. 
    EPA also identified the need for additional cumulative/indirect induced 
    impact analyses, further discussion and analyses of project economics, 
    and numerous technical analyses be conducted and presented in the final 
    EIS.
        ERP No. D-FTA-J40143-UT Rating EC2, University-Downtown-Airport 
    Transportation Corridor, Major Investment Study, Construction and 
    Operation of the East-West Corridor Light Rail Transit (LRT), 
    Transportation System Management (TSM) and Central Business District 
    (CBD), Funding, Salt Lake County, UT.
        Summary: EPA expressed environmental concerns regarding air quality 
    and construction impact and requested that these issues be clarified in 
    the Final EIS.
        ERP No. D-USA-J11014-CO Rating LO, United States Army Garrison, 
    Fitzsimons (Formerly Fitzsimons Army Medical Center) Disposal and Reuse 
    for BRAC-95, Implementation, City of Aurora, Denver County, CO.
        Summary: EPA had no objections to the action as proposed.
        ERP No. D-USN-E11041-00 Rating EC2, Cecil Field Naval Air Station, 
    Realignment of F/A-18 Aircraft and Operational Functions, to Other East 
    Coast Installations; NAS Oceana, VA; MCAS Beaufort, SC and MCAS Cherry 
    Point, NC, Implementation, COE Section 404 Permit, FL, SC, NC and VA.
        Summary: EPA expressed environmental concern regarding the noise, 
    transportation, air and water quality, environmental contamination, and 
    terrestrial environmental impacts associated with proposed realignment.
        ERP No. D-USN-K11084-CA Rating EC2, Miramar Naval Air Station 
    Realignment of E-2 Aircraft Squadrons, Three Installations are 
    consider: Point Muga Naval Air Weapons Station, Lemoore Naval Air 
    Station and El Centro, Ventura, Fresno, King and Imperial Counties, CA.
        Summary: EPA requested additional information on project 
    description, biological resources, and land use noise compatibility. In 
    particular, EPA is concerned by the analysis of the no action 
    alternative.
    
    Final EISs
    
        ERP No. F-FRC-L05207-WA Nooksack River Basin Hydroelectric 
    Projects, Seven Projects--(FERC No. 4628) (FERC No. 4738) (FERC No. 
    4270) (FERC No. 4282) (FERC No. 9231) (FERC No. 4312) and (FERC No. 
    3721) Construction and Operation, Licensing, Whatcom County, WA.
        Summary: EPA Region 10 used a screening tool to conduct a limited 
    review of this action. Based upon the screen, EPA does not foresee 
    having any environmental objections to the proposed project. Therefore, 
    EPA will not be conducting a detailed review.
        ERP No. F-GSA-J81009-CO Denver Federal Center Master Site Plan, 
    implementation, City of Lakewood, Jefferson County, CO.
        Summary: EPA continues to have concern regarding this project and 
    its relationship to the RCRA Consent Decree. In addition EPA believes 
    additional information on groundwater sites and impacts to those sites 
    should have been provided.
        ERP No. F-IBR-K64016-CA Hamilton City Pumping Plant, Fish Screen 
    Improvement Project, COE Section 10 and 404 Permits, Central Valley, 
    Butte, Colusa, Glenn and Tehama Counties, CA.
        Summary: Review of the Final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
        ERP No. F-AF-J11012-00 Colorado Airspace Initiative, Modifications 
    to the National Airspace System, such as the
    
    [[Page 11235]]
    
    F-16 Aircraft and Aircrews of the 140th Wing of the Colorado Air 
    National Guard, also existing Military Operations Areas (MOAs) and 
    Military Training Routes (MTRs), CO, NM, KS, NB and WY.
        Summary: Based on the disclosures of impacts and further mitigation 
    proposed in the FEIS, the EPA believes the preferred alternative can be 
    implemented without significant impacts to the environment.
        ERP No. F-UMC-K36048-CA Santa Margarita River Flood Control Project 
    (MILCON P-010) and Basilone Road Bridge Replacement Project (MILCON P-
    030), Construction and Operation, COE Section 404 Permit, Camp 
    Pendleton, CA.
        Summary: EPA continues to expressed environmental concerns related 
    to Clean Water Act 404 (b)(1) Guidelines; particularly. EPA believes 
    that additional analysis is required to address less-damaging off-site 
    alternatives sufficient mitigation measures is recommended.
    
        Dated: March 3, 1998.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 98-5842 Filed 3-5-98; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
03/06/1998
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
98-5842
Pages:
11234-11235 (2 pages)
Docket Numbers:
ER-FRL-5489-6
PDF File:
98-5842.pdf