2015-05234. Drawbridge Operation Regulations; Cheesequake Creek, Morgan, NJ  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of deviation from drawbridge regulation.

    SUMMARY:

    The Coast Guard has issued a temporary deviation from the operating schedule that governs the operation of the New Jersey Transit Rail Operations (NJTRO) railroad bridge across Cheesequake Creek, mile 0.2, at Morgan, New Jersey. This deviation is necessary to allow the bridge owner to perform structural repairs at the bridge. This deviation allows the bridge to remain closed on three consecutive weekends.

    DATES:

    This deviation is effective from 6 a.m. on March 14, 2015 through 7 p.m. on March 28, 2015.

    ADDRESSES:

    The docket for this deviation, [USCG-2015-0085] is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12-140, on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC, 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this temporary deviation, call or email Mr. Joe M. Arca, Project Officer, First Coast Guard District, telephone (212) 514-4336, joe.m.arca@uscg.mil. If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone (202) 366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The NJTRO railroad bridge across Cheesequake Creek, mile 0.2, at Morgan, New Jersey, has a vertical clearance in the closed position of 3 feet at mean high water and 8 feet at mean low water. The existing bridge operating regulations are found at 33 CFR 117.709(b).

    The waterway is transited by seasonal recreational vessels of various sizes.

    The bridge owner, NJTRO, requested a temporary deviation from the normal operating schedule to facilitate structural repairs at the bridge.

    Under this temporary deviation the NJTRO railroad bridge shall remain in the closed position for three consecutive weekends from 6 a.m. on Saturday through 7 p.m. on Sunday on the following dates: March 14 and 15, March 21 and 22, and March 28 and 29, 2015.

    The draw shall maintain its normal operating schedule at all other times.

    There are no alternate routes for vessel traffic; however, vessels that can pass under the closed draw during this closure may do so at all times. The bridge may be opened in the event of an emergency.

    The Coast Guard will inform the users of the waterways through our Local and Broadcast Notice to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation.

    In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: February 23, 2015.

    C.J. Bisignano,

    Supervisory Bridge Management Specialist, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2015-05234 Filed 3-5-15; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
3/14/2015
Published:
03/06/2015
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of deviation from drawbridge regulation.
Document Number:
2015-05234
Dates:
This deviation is effective from 6 a.m. on March 14, 2015 through 7 p.m. on March 28, 2015.
Pages:
12083-12083 (1 pages)
Docket Numbers:
Docket No. USCG-2015-0085
PDF File:
2015-05234.pdf
CFR: (1)
33 CFR 117