E5-912. Elsinore Municipal Water District and the Nevada Hydro Company, Inc.; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions  

  • Start Preamble February 28, 2005.

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

    a. Type of Application: Major unconstructed project.

    b. Project No.: 11858-002.

    c. Date Filed: February 2, 2004.

    d. Applicant: Elsinore Municipal Water District and the Nevada Hydro Company, Inc.

    e. Name of Project: Lake Elsinore Advanced Pumped Storage Project.

    f. Location: On Lake Elsinore and San Juan Creek, in the Town of Lake Elsinore, Riverside County, California. The project would occupy Federal lands, including lands managed by the Forest Service (Cleveland National Forest), Bureau of Land Management, and the Department of Defense (Camp Pendleton).

    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).

    h. Applicant Contact: Rexford Wait, The Nevada Hydro Company, 2416 Cades Way, Vista, California 92083, (760) 599-0086.

    i. FERC Contact: Jim Fargo at (202) 502-6095; e-mail james.fargo@ferc.gov.

    j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions is 60 days from the issuance of this notice; reply comments are due 105 days from the issuance date of this notice.

    All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

    The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    Comments, recommendations, terms and conditions, and prescriptions may Start Printed Page 11009be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov) under the “e-Filing” link.

    k. This application has been accepted and is now ready for environmental analysis.

    l. The proposed project would consist of: (1) A new upper reservoir (Morrell Canyon) having a 180-foot-high main dam and a gross storage volume of 5,750 feet, at a normal reservoir surface elevation of 2,880 feet above mean sea level (msl); (2) a powerhouse with two reversible pump-turbine units with a total installed capacity of 500 megawatts; (3) the existing Lake Elsinore to be used as a lower reservoir; (4) about 30 miles of 500 kV transmission line connecting the project to an existing transmission line owned by Southern California Edison located north of the proposed project and to an existing San Diego Gas & Electric Company transmission line located to the south.

    m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h above.

    All filings must (1) bear in all capital letters the title “COMMENTS”, “REPLY COMMENTS”, “RECOMMENDATIONS,” “TERMS AND CONDITIONS,” or “PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010.

    You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    n. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission's regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice.

    Start Signature

    Magalie R. Salas,

    Secretary.

    End Signature End Preamble

    [FR Doc. E5-912 Filed 3-4-05; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
03/07/2005
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E5-912
Pages:
11008-11009 (2 pages)
Docket Numbers:
Project No. 11858-002
EOCitation:
of 2005-02-28
PDF File:
e5-912.pdf