2016-04994. Drawbridge Operation Regulation; Hackensack River, Jersey City, NJ  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of deviation from drawbridge regulation.

    SUMMARY:

    The Coast Guard has issued a temporary deviation from the operating schedule that governs the PATH Bridge across the Hackensack River, mile 3.0, at Jersey City, New Jersey. This deviation is necessary to allow the bridge owner to replace rails and ties at the bridge. This deviation allows the bridge to remain closed on Saturdays through Mondays for twenty-six consecutive weekends.

    DATES:

    This deviation is effective from 12:01 a.m. on March 19, 2016 to 12:01 a.m. on September 12, 2016.

    ADDRESSES:

    The docket for this deviation, [USCG-2016-0150] is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH”. Click on Open Docket Folder on the line associated with this deviation.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this temporary deviation, call or email Joe M. Arca, Project Officer, First Coast Guard District, telephone (212) 514-4336, email joe.m.arca@uscg.mil.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The PATH railroad bridge across the Hackensack River, mile 3.0, at Jersey City, New Jersey, has a vertical clearance in the closed position of 40 feet at mean high water and 45 feet at mean low water. The existing bridge operating regulations are found at 33 CFR 117.723.

    The waterway is transited by seasonal recreational vessels and commercial vessels of various sizes.

    The bridge owner, Port Authority Trans-Hudson (PATH), requested a temporary deviation from the normal operating schedule to facilitate replacement of the rails and ties at the bridge.

    Under this temporary deviation, the PATH railroad bridge may remain in the closed position for twenty-six weekends, between 12:01 a.m. on Saturdays through 12:01 a.m. on Mondays from March 19, 2016 through September 12, 2016.

    Vessels able to pass under the bridge in the closed position may do so at anytime. The bridge will not be able to open for emergencies and there is no immediate alternate route for vessels to pass.

    The Coast Guard will inform the users of the waterways through our Local Notice and Broadcast to Mariners of the change in operating schedule for the bridge so that vessel operations can arrange their transits to minimize any impact caused by the temporary deviation.

    In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: March 2, 2016.

    C.J. Bisignano,

    Supervisory Bridge Management Specialist, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2016-04994 Filed 3-4-16; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
3/19/2016
Published:
03/07/2016
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of deviation from drawbridge regulation.
Document Number:
2016-04994
Dates:
This deviation is effective from 12:01 a.m. on March 19, 2016 to 12:01 a.m. on September 12, 2016.
Pages:
11668-11668 (1 pages)
Docket Numbers:
Docket No. USCG-2016-0150
PDF File:
2016-04994.pdf
CFR: (1)
33 CFR 117