96-5575. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 61, Number 47 (Friday, March 8, 1996)]
    [Notices]
    [Pages 9449-9450]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-5575]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    [[Page 9450]]
    
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-5414-1]
    
    
    Environmental Impact Statements; Notice of Availability
    
        Responsible Agency: Office of Federal Activities, General 
    Information (202) 564-7167 OR (202) 564-7153.
        Weekly receipt of Environmental Impact Statements Filed February 
    26, 1996 Through March 1, 1996 Pursuant to 40 CFR 1506.9.
    
    EIS No. 960094, FINAL EIS, BOP, HI, Honolulu, Hawaii Detention 
    Facility, Construction and Operation, Site Selection, Fort Armstrong, 
    Ualena Street, Lagoon Drive, Elliott Street, HI, Due: April 8, 1996, 
    Contact: David J. Dorworth (202) 514-6470.
    EIS No. 960095, FINAL EIS, FAA, NJ, Newark International Airport Ground 
    Access Monorail-Northeast Corridor Connection Project, Funding, 
    Construction, Operation, Airport Layout Plant and Approval, Essex and 
    Union Counties, NJ, Due: April 8, 1996, Contact: Larry Schafer (718) 
    553-3340.
    EIS No. 960096, DRAFT EIS, FHW, IA, NB, US 34 Roadway and Bridge 
    Improvements, I-29 in Mills County, IA to US 75 in Cass or Sarpy 
    Counties, NB, COE Section 404 and US Coast Guard Permits, Mills County, 
    Iowa and Cass & Sarpy Counties, Nebraska, Due: April 22, 1996, Contact: 
    Phil Barnes (402) 437-5521.
    EIS No. 960097, DRAFT EIS, BIA, NM, Jemez Mountains Electric 
    Cooperative, Construction, Operation and Maintence, El Rancho 
    Substation, Sante Fe County, NM, Due: April 22, 1996, Contact: Charles 
    Tippeconnic (505) 766-3374.
    EIS No. 960098, DRAFT EIS, FRC, VT, MA, Deefield River Hydroelectric 
    Project (FERC. 2323), Issuing New License (Relicense), Bear Swamp 
    Pumped Storage Project (FERC. No. 2669) and Gardners Falls Project 
    (FERC. No. 2334), VT and MA, Due: April 22, 1996, Contact: CarLisa M. 
    Linton (202) 219-2802.
    EIS No. 960099, DRAFT EIS, AFS, OR, Red Mountain Project, 
    Implementation, Three Timber Sales: Twin, Muddy Creek and Gee, Wallowa-
    Whitman National Forest, Baker Ranger District, Baker County, OR, Due: 
    April 22, 1996, Contact: Barry Hansen (503) 523-6391.
    EIS No. 960100, FINAL EIS, SFW, CO, Rocky Mountain Arsenal National 
    Wildlife Refuge Establishment and Operation, Implementation, Adam 
    County, CO, Due: April 8, 1996, Contact: Dave Shaffer (303) 289-0232.
    EIS No. 960101, DRAFT EIS, DOE, TN, GA, TX, SC, MO, Programmatic EIS--
    Stockpile Stewardship and Management Project, Reduced Nuclear Weapons 
    Stockpile in the Absence of Undergound Testing, Eight Sites: Oak Ridge 
    Reservation (ORR), Savannah River Site (SRS), Kansas City Plant (KCP) 
    Pantex Plant, Los Alamos National Laboratory, Lawrence Livermore 
    National Laboratory, Sandia National and Nevada Test Site, Due: May 7, 
    1996, Contact: Jay Rose (202) 586-5484.
    EIS No. 960102, DRAFT EIS, FRC, ME, Eel Weir Hydroelectric Project 
    (FERC. No. 2984) Implementation, Water Level Management Plan, Sebago 
    Lake, Cumberland County, ME, Due: April 22, 1996, Contact: Thomas J. 
    LoVallo (202) 219-1168.
    EIS No. 960103, FINAL SUPPLEMENT, COE, CA, American River Watershed 
    Flood Plain Protection Project, Construction, Operation and Maintence, 
    Updated and Additional Information, Sacramento, Placer and Sutter 
    Counties, CA, Due: April 8, 1996, Contact: Mike Welsh (916) 557-6718. 
    EIS No. 960104, DRAFT EIS, AFS, ID, Targhee National Forest, 
    Implementation, Forest Plan Revisions, Bonneville, Butte, Clark, 
    Fremont, Jefferson, Lemhi, Madison and Teton Counties, ID, Due: June 7, 
    1996, Contact: Jerry Reese (208) 624-3151.
    EIS No. 960105, FINAL EIS, AFS, MT, Helena National Forest and Elkhorn 
    Mountain portion of the Deerlodge National Forest Land and Resources 
    Management Plan, Oil and Gas Leasing, Implementation, several counties, 
    MT, Due: April 8, 1996, Contact: Thomas Andersen (406) 449-5201.
    EIS No. 960106, DRAFT EIS, DOE, Programmatic EIS--Storage and 
    Disposition of Weapon-Usable Fissile Materials, Implementation, Storage 
    of all Plutonium and Highly Enriched Uranium and the Disposition of 
    Surplus Plutonium, Sites Considered: Hanford Site, Idaho National 
    Engineering Laboratory, Nevada Test Site, Oak Ridge Reservation, Pantex 
    Plant and Savannah River Site, Due: May 7, 1996, Contact: J. David 
    Nulton (202) 586-4513.
    
        Dated: March 5, 1996.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 96-5575 Filed 3-7-96; 8:45 am]
    BILLING CODE 6560-50-U
    
    

Document Information

Published:
03/08/1996
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
96-5575
Pages:
9449-9450 (2 pages)
Docket Numbers:
ER-FRL-5414-1
PDF File:
96-5575.pdf