06-2256. Drawbridge Operation Regulations: Oceanport Creek, Oceanport, NJ  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the New Jersey Transit Rail Operations (NJTRO) Bridge across Oceanport Creek at mile 8.4, at Oceanport, New Jersey. This temporary deviation allows the NJTRO Bridge to remain in the closed position for two weekends from 6 a.m. on Saturday through 6 p.m. on Sunday. This deviation is necessary in order to facilitate scheduled bridge maintenance.

    DATES:

    This deviation is effective from March 25, 2006 through April 23, 2006.

    ADDRESSES:

    Materials referred to in this document are available for inspection or copying at the First Coast Guard District, Bridge Branch Office, 408 Atlantic Avenue, Boston, Massachusetts 02110, between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays. The telephone number is (617) 223-8364. The First Coast Guard District Bridge Branch Office maintains the public docket for this temporary deviation.

    Start Further Info Start Printed Page 12136

    FOR FURTHER INFORMATION CONTACT:

    Joe Arca, Project Officer, First Coast Guard District, at (212) 668-7165.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The NJTRO Bridge at mile 8.4, across Oceanport Creek has a vertical clearance in the closed position of 4 feet at mean high water and 6 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.736.

    The owner of the bridge, New Jersey Transit Rail Operations (NJTRO), requested a temporary deviation from the drawbridge operating regulations to facilitate scheduled mechanical bridge repairs to be implemented during two weekend closure periods with a third weekend to be used as a rain date.

    In order to perform the above repairs the bridge must remain in the closed position. Vessels that can pass under the bridge without a bridge opening may do so at all times.

    This temporary deviation from the drawbridge operation regulations allows the NJTRO Bridge to remain in the closed position for two weekend closures as follows:

    From 6 a.m. on Saturday, March 25, 2006 through 6 p.m. on Sunday, March 26, 2006, and from 6 a.m. on Saturday, April 8, 2006 through 6 p.m. on Sunday, April 9, 2006.

    In the event inclement weather requires the cancellation of either of the two weekend closures listed above, the bridge may remain closed on an alternate weekend from 6 a.m. on Saturday, April 22, 2006 through 6 p.m. on Sunday, April 23, 2006.

    In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: March 2, 2006.

    Gary Kassof,

    Bridge Program Manager, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 06-2256 Filed 3-8-06; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
3/25/2006
Published:
03/09/2006
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
06-2256
Dates:
This deviation is effective from March 25, 2006 through April 23, 2006.
Pages:
12135-12136 (2 pages)
Docket Numbers:
CGD01-06-013
PDF File:
06-2256.pdf
CFR: (1)
33 CFR 117