2023-04857. Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utility Company Status  

  • Start Preamble
    Docket Nos.
    Moss Landing Energy Storage 3, LLCEG23-29-000
    Chesapeake Solar Project, LLCEG23-30-000
    East Point Energy Center, LLCEG23-31-000
    Diversion Wind Energy Holdings LLCEG23-32-000
    Wagon Wheel Wind Project Holdings LLCEG23-33-000
    Wagon Wheel Wind Project, LLCEG23-34-000
    Diversion Wind Energy LLCEG23-35-000
    Start Printed Page 14614
    Paris Farm Solar, LLCEG23-36-000
    Waco Solar, LLCEG23-37-000
    Rodeo Ranch Energy Storage, LLCEG23-38-000
    Hecate Energy Albany 2 LLCEG23-39-000
    Hecate Energy Albany 1 LLCEG23-40-000
    GRP TE Lessee, LLCEG23-41-000
    Kapolei Energy Storage I, LLCEG23-42-000
    Remy Jade Generating, LLCEG23-43-000
    PGR 2022 Lessee 2, LLCEG23-44-000
    Cathcart Solar, LLCEG23-45-000
    Fresh Air Energy XXXVII, LLCEG23-46-000
    Thigpen Farms Solar, LLCEG23-47-000
    Fresh Air Energy XXIII, LLCEG23-48-000
    Diablo Winds, LLCEG23-49-000
    Carson Hybrid Energy Center LLCEG23-50-000
    Enery Holdings LLCEG23-51-000
    Gambit Energy Storage LLCEG23-52-000
    Parc du Banc de Guérande SASFC23-2-000

    Take notice that during the month of February 2023, the status of the above-captioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission's regulations. 18 CFR 366.7(a) (2021).

    Start Signature

    Dated: March 3, 2023.

    Debbie-Anne A. Reese,

    Deputy Secretary.

    End Signature End Preamble

    [FR Doc. 2023-04857 Filed 3-8-23; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
03/09/2023
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2023-04857
Pages:
14613-14614 (2 pages)
PDF File:
2023-04857.pdf