2023-04857. Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utility Company Status
-
Start Preamble
Docket Nos. Moss Landing Energy Storage 3, LLC EG23-29-000 Chesapeake Solar Project, LLC EG23-30-000 East Point Energy Center, LLC EG23-31-000 Diversion Wind Energy Holdings LLC EG23-32-000 Wagon Wheel Wind Project Holdings LLC EG23-33-000 Wagon Wheel Wind Project, LLC EG23-34-000 Diversion Wind Energy LLC EG23-35-000 Start Printed Page 14614 Paris Farm Solar, LLC EG23-36-000 Waco Solar, LLC EG23-37-000 Rodeo Ranch Energy Storage, LLC EG23-38-000 Hecate Energy Albany 2 LLC EG23-39-000 Hecate Energy Albany 1 LLC EG23-40-000 GRP TE Lessee, LLC EG23-41-000 Kapolei Energy Storage I, LLC EG23-42-000 Remy Jade Generating, LLC EG23-43-000 PGR 2022 Lessee 2, LLC EG23-44-000 Cathcart Solar, LLC EG23-45-000 Fresh Air Energy XXXVII, LLC EG23-46-000 Thigpen Farms Solar, LLC EG23-47-000 Fresh Air Energy XXIII, LLC EG23-48-000 Diablo Winds, LLC EG23-49-000 Carson Hybrid Energy Center LLC EG23-50-000 Enery Holdings LLC EG23-51-000 Gambit Energy Storage LLC EG23-52-000 Parc du Banc de Guérande SAS FC23-2-000 Take notice that during the month of February 2023, the status of the above-captioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission's regulations. 18 CFR 366.7(a) (2021).
Start SignatureDated: March 3, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-04857 Filed 3-8-23; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 03/09/2023
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2023-04857
- Pages:
- 14613-14614 (2 pages)
- PDF File:
- 2023-04857.pdf