97-8164. Airworthiness Directives; Pratt & Whitney JT8D Series Turbofan Engines  

  • [Federal Register Volume 62, Number 62 (Tuesday, April 1, 1997)]
    [Proposed Rules]
    [Pages 15437-15439]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-8164]
    
    
    -----------------------------------------------------------------------
    
    
    DEPARTMENT OF TRANSPORTATION
    14 CFR Part 39
    
    [Docket No. 97-ANE-07]
    RIN 2120-AA64
    
    
    Airworthiness Directives; Pratt & Whitney JT8D Series Turbofan 
    Engines
    
    AGENCY: Federal Aviation Administration, DOT.
    
    ACTION: Notice of proposed rulemaking (NPRM).
    
    -----------------------------------------------------------------------
    
    SUMMARY: This document proposes the supersedure of an existing 
    airworthiness directive (AD), applicable to certain Pratt & Whitney 
    JT8D series turbofan engines, that currently requires inspections of 
    low pressure turbine (LPT) blade sets for blade shroud crossnotch wear, 
    and removal, if necessary. In addition, the current AD requires, as a 
    terminating action to the inspections, installation of improved LPT 
    containment hardware, and installation of an improved No. 6 bearing 
    scavenge pump bracket bushing. This action would keep the compliance 
    actions of the current AD intact but change the compliance time for 
    full compliance from the current calendar end-date to December 31, 
    1998. This proposal is prompted by a report of a fourth stage hub 
    manufacturing defect that led to the failure of the hub and subsequent 
    release of LPT blades. The actions specified by the proposed AD are 
    intended to prevent damage to the aircraft resulting from engine debris 
    following an LPT blade, shaft, or hub failure.
    
    DATES: Comments must be received by May 1, 1997.
    
    ADDRESSES: Submit comments in triplicate to the Federal Aviation 
    Administration (FAA), New England Region, Office of the Assistant Chief 
    Counsel, Attention: Rules Docket No. 97-ANE-07, 12 New England 
    Executive Park, Burlington, MA 01803-5299. Comments may also be sent 
    via the Internet using the following address: ``engineprop@faa.dot.gov''. Comments sent via the Internet must contain 
    the docket number in the subject line. Comments may be inspected at 
    this location between 8:00 a.m. and 4:30 p.m., Monday through Friday, 
    except Federal holidays.
        The service information referenced in the proposed rule may be 
    obtained from Pratt & Whitney, 400 Main St., East Hartford, CT 06108; 
    telephone (860) 565-6600, fax (860) 565-4503. This information may be 
    examined at the FAA, New England Region, Office of the Assistant Chief 
    Counsel, 12 New England Executive Park, Burlington, MA.
    
    FOR FURTHER INFORMATION CONTACT: Christopher Spinney, Aerospace 
    Engineer, Engine Certification Office, FAA, Engine and Propeller 
    Directorate, 12 New England Executive Park, Burlington, MA 01803-5299; 
    telephone (617) 238-7175, fax (617) 238-7199.
    
    SUPPLEMENTARY INFORMATION:
    
    Comments Invited
    
        Interested persons are invited to participate in the making of the 
    proposed rule by submitting such written data, views, or arguments as 
    they may desire. Communications should identify the Rules Docket number 
    and be submitted in triplicate to the address specified above. All 
    communications received on or before the closing date for comments, 
    specified above, will be considered before taking action on the 
    proposed rule. The proposals contained in this notice may be changed in 
    light of the comments received.
        Comments are specifically invited on the overall regulatory, 
    economic, environmental, and energy aspects of the proposed rule. All 
    comments submitted will be available, both before and after the closing 
    date for comments, in the Rules Docket for examination by interested 
    persons. A report summarizing each FAA-public contact concerned with 
    the substance of this proposal will be filed in the Rules Docket.
        Commenters wishing the FAA to acknowledge receipt of their comments 
    submitted in response to this notice must submit a self-addressed, 
    stamped postcard on which the following statement is made: ``Comments 
    to Docket Number 97-ANE-07.'' The postcard will be date stamped and 
    returned to the commenter.
    
    Availability of NPRMs
    
        Any person may obtain a copy of this NPRM by submitting a request 
    to the FAA, New England Region, Office of the Assistant Chief Counsel, 
    Attention: Rules Docket No. 97-ANE-07, 12 New England Executive Park, 
    Burlington, MA 01803-5299.
    
    Discussion
    
        On September 22, 1994, the Federal Aviation Administration (FAA) 
    issued airworthiness directive AD 94-20-08, Amendment 39-9036 (59 FR 
    51842, October 15, 1994), applicable to Pratt & Whitney (PW) JT8D-1, -
    1A, -1B, -7, -7A, -7B, -9, -9A, -11, -15, -17, and -17R series turbofan 
    engines, to require inspections of low pressure turbine (LPT) blade 
    sets for blade shroud crossnotch wear, and removal, if necessary. In 
    addition, the current AD requires, as a terminating action to the 
    inspections, installation of improved LPT containment hardware, and 
    installation of an improved No. 6 bearing scavenge pump bracket 
    bushing. That action was prompted by reports of uncontained engine 
    failures. That condition, if not corrected, could result in damage to 
    the aircraft resulting from engine debris following an LPT blade, 
    shaft, or hub failure.
        Since the issuance of that AD, the FAA has developed a two-part 
    risk management plan intended to address the threat of blade release 
    due to fourth stage LPT hub failure. One part of the management plan is 
    a proposed rule, Docket No. 96-ANE-32 (62 FR 1299, January 9, 1997), 
    which proposes the initial and repetitive inspections and removal from 
    service of defective disks in a suspect population. The other part of 
    the risk management plan is this proposed AD, which reduces the threat 
    of uncontainment by changing the compliance date of the current AD, 94-
    20-08. The current AD addresses two threats to uncontainment in a blade 
    failure and a shaft fracture by requiring initial and repetitive 
    inspections of worn shroud crossnotches on third and fourth stage LPT 
    blades until improved containment hardware can be installed. To address 
    the threat of shaft fracture, the improved containment hardware 
    installation is required, as well as an improved No. 6 bearing scavenge 
    pump bracket bushing to provide for better rotor meshing. The 
    compliance deadline for incorporating the improved containment hardware 
    and the bearing bracket bushing is currently December 31, 1999, or 
    7,000 cycles since November 14, 1994, or 8,000 hours since November 14, 
    1994, whichever occurs later. To address the additional threat of 
    uncontainment in the form of a fourth stage LPT hub fracture, which 
    results in a blade release, the calendar end-date for completing 
    compliance to the requirements of the superseded AD is changed to 
    December 31, 1998, or 7,000 cycles since November 14, 1994, or 8,000 
    hours since November 14, 1994, whichever occurs first.
        The FAA has reviewed and approved the technical contents of the 
    following service documents: PW ASB No. A5913, Revision 6, dated 
    October 15, 1993, that
    
    [[Page 15438]]
    
    describes the third and fourth stage LPT blade set inspection 
    procedures and replacement requirements; PW ASB No. A6110, Revision 1, 
    dated October 15, 1993, that describes procedures for installation of 
    improved LPT containment hardware; PW ASB No. A6131, dated August 24, 
    1993, that describes procedures for installation of an improved No. 6 
    bearing scavenge pump bracket bushing; and PW SB No. 5748, Revision 5, 
    dated August 3, 1993, that describes procedures for removing material 
    from the inner platform leading edge on third and fourth stage LPT vane 
    and vane cluster assemblies, and remarking these modified vanes with 
    new identification numbers.
        Since an unsafe condition has been identified that is likely to 
    exist or develop on other products of this same type design, the 
    proposed AD would supersede AD 94-20-08 to keep the compliance actions 
    of the current AD intact but change the compliance time for full 
    compliance from the current calendar end-date to December 31, 1998.
        The FAA has determined that the changes to the AD would neither 
    increase the scope of the required actions over the current AD, nor 
    increase the economic burden on operators over the costs of complying 
    with the current AD. While the proposed new AD would alter the 
    compliance times, operators should still be able to perform the 
    required actions at scheduled maintenance. Therefore the FAA has 
    determined that this new AD would result in no additional economic 
    impact.
        The regulations proposed herein would not have substantial direct 
    effects on the States, on the relationship between the national 
    government and the States, or on the distribution of power and 
    responsibilities among the various levels of government. Therefore, in 
    accordance with Executive Order 12612, it is determined that this 
    proposal would not have sufficient federalism implications to warrant 
    the preparation of a Federalism Assessment.
        For the reasons discussed above, I certify that this proposed 
    regulation (1) is not a ``significant regulatory action'' under 
    Executive Order 12866; (2) is not a ``significant rule'' under the DOT 
    Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); 
    and (3) if promulgated, will not have a significant economic impact, 
    positive or negative, on a substantial number of small entities under 
    the criteria of the Regulatory Flexibility Act. A copy of the draft 
    regulatory evaluation prepared for this action is contained in the 
    Rules Docket. A copy of it may be obtained by contacting the Rules 
    Docket at the location provided under the caption ADDRESSES.
    
    List of Subjects in 14 CFR Part 39
    
        Air transportation, Aircraft, Aviation safety, Safety.
    
    The Proposed Amendment
    
        Accordingly, pursuant to the authority delegated to me by the 
    Administrator, the Federal Aviation Administration proposes to amend 
    part 39 of the Federal Aviation Regulations (14 CFR part 39) as 
    follows:
    
    PART 39--AIRWORTHINESS DIRECTIVES
    
        1. The authority citation for part 39 continues to read as follows:
    
        Authority: 49 U.S.C. 106(g), 40113, 44701.
    
    
    Sec. 39.13  [Amended]
    
        2. Section 39.13 is amended by removing amendment 39-9036 (59 FR 
    51842, October 15, 1994) and by adding a new airworthiness directive to 
    read as follows:
    
    Pratt & Whitney: Docket No. 97-ANE-07. Supersedes AD 94-20-08, 
    Amendment 39-9036.
    
        Applicability: Pratt & Whitney (PW) JT8D-1, -1A, -1B, -7, -7A, -
    7B, -9, -9A, -11, -15, -17, and -17R turbofan engines, installed on 
    but not limited to Boeing 737 and 727 series aircraft, and McDonnell 
    Douglas DC-9 series aircraft.
    
        Note 1: This airworthiness directive (AD) applies to each engine 
    identified in the preceding applicability provision, regardless of 
    whether it has been modified, altered, or repaired in the area 
    subject to the requirements of this AD. For engines that have been 
    modified, altered, or repaired so that the performance of the 
    requirements of this AD is affected, the owner/operator must request 
    approval for an alternative method of compliance in accordance with 
    paragraph (d) of this AD. The request should include an assessment 
    of the effect of the modification, alteration, or repair on the 
    unsafe condition addressed by this AD; and, if the unsafe condition 
    has not been eliminated, the request should include specific 
    proposed actions to address it.
    
        Compliance: Required as indicated, unless accomplished 
    previously.
        To prevent damage to the aircraft resulting from engine debris 
    following a low pressure turbine (LPT) blade, shaft, or hub failure, 
    accomplish the following:
        (a) For engines that do not contain fan exhaust inner front duct 
    segment assemblies that are installed in accordance with PW Alert 
    Service Bulletin (ASB) No. 6039, Revision 3, dated October 15, 1993, 
    or earlier revisions of PW ASB No. 6039, and either PW honeycomb 
    third stage outer airseal Part Number (P/N) 801931, 802097, 797594, 
    or 798279; or Pyromet Industries, Inc., honeycomb third stage outer 
    airseal P/N PI9336; or McClain International, Inc., honeycomb third 
    stage outer airseal P/N M2433; or a turbine case shield assembly 
    installed in accordance with PW ASB No. 6039, Revision 3, dated 
    October 15, 1993, or earlier revisions of PW ASB No. 6039; or a 
    third stage blade set that has third stage turbine blades that were 
    installed in accordance with PW SB No. 5331, dated October 27, 1982, 
    accomplish the following:
        (1) Conduct initial and repetitive inspections on installed 
    third and fourth stage LPT blade sets, and remove and replace with 
    serviceable blade sets, as necessary, in accordance with Part 1 of 
    the Accomplishment Instructions of PW ASB No. A5913, Revision 6, 
    dated October 15, 1993; or PW ASB No. 5913, Revision 5, dated August 
    10, 1992; or PW ASB No. 5913, Revision 4, dated February 20, 1992, 
    as follows:
        (i) Initially inspect the blade shroud crossnotches of the third 
    stage LPT blade set when specified in paragraphs (a)(1)(i)(A) or 
    (a)(1)(i)(B) of this AD, whichever occurs later. Engines that 
    contain a third stage blade set that have third stage turbine blades 
    that were installed per the requirements specified in PW Service 
    Bulletin No. 5331, dated October 27, 1982, do not require the third 
    stage blade set inspection.
        (A) Inspect within 6,000 cycles or 6,000 hours time in service, 
    whichever occurs first, since new, since the last blade shroud 
    crossnotch inspection specified in Section 72-53-12 of PW JT8D 
    Engine Manual P/N 481672, or since last blade shroud crossnotch 
    repair that was accomplished per the requirements specified in 
    Section 72-53-12 of PW JT8D Engine Manual P/N 481672; or
        (B) Inspect within 1,000 cycles or 1,000 hours time in service 
    since November 14, 1994, whichever occurs first.
        (ii) Initially inspect the blade shroud crossnotches of the 
    fourth stage LPT blade set when specified in paragraph (a)(1)(ii)(A) 
    or (a)(1)(ii)(B) of this AD, whichever occurs later. Engines that 
    contain fan exhaust inner front duct segment assemblies that were 
    installed per the requirements of PW ASB No. 6039, Revision 3, dated 
    October 15, 1993, or earlier revisions of PW ASB No. 6039, do not 
    require the fourth stage blade set inspection.
        (A) Inspect within 6,000 cycles or 6,000 hours time in service, 
    whichever occurs first, since new, since the last blade shroud 
    crossnotch inspection specified in Section 72-53-13 of PW JT8D 
    Engine Manual P/N 481672, or since last blade shroud crossnotch 
    repair that was accomplished per the requirements specified in 
    Section 72-53-13 of PW JT8D Engine Manual P/N 481672; or
        (B) Inspect within 1,000 cycles or 1,000 hours time in service 
    since November 14, 1994, whichever occurs first.
        (iii) Thereafter, inspect the third and fourth stage LPT blade 
    sets in accordance with the procedures and intervals specified in PW 
    ASB No. A5913, Revision 6, dated October 15, 1993;
        (2) At the next shop visit after November 14, 1994; but not 
    later than December 31, 1998, or 8,000 hours time in service since 
    November 14, 1994, or 7,000 cycles since November 14, 1994, 
    whichever occurs first, install the improved inner front fan exhaust 
    duct and associated hardware in accordance
    
    [[Page 15439]]
    
    with Part A of the Accomplishment Instructions of PW ASB No. A6110, 
    Revision 1, dated October 15, 1993.
    
        (3) At the next access to the third stage turbine air sealing 
    ring after November 14, 1994, but not later than December 31, 1998, 
    or 8,000 hours time in service since November 14, 1994, or 7,000 
    cycles since November 14, 1994, whichever occurs first, install the 
    improved third stage turbine air sealing ring and associated 
    hardware in accordance with Part B of the Accomplishment 
    Instructions of PW ASB No. A6110, Revision 1, dated October 15, 
    1993.
    
        Note 2: Third stage turbine outer air seal, P/N M2533, is an 
    acceptable alternative to PW P/N 811962 for compliance with this 
    paragraph.
    
        (4) At the next shop visit after November 14, 1994, but not 
    later than December 31, 1998, or 8,000 hours time in service since 
    November 14, 1994, or 7,000 cycles since November 14, 1994, 
    whichever occurs first, install the improved No. 6 bearing scavenge 
    pump bracket bushing in accordance with the Accomplishment 
    Instructions of PW ASB No. A6131, dated August 24, 1993.
        (5) Accomplishment of the installations required by paragraphs 
    (a)(2), (a)(3), and (a)(4) of this AD constitutes terminating action 
    to the repetitive inspections required by paragraph (a)(1) of this 
    AD.
        (b) For engines that do contain fan exhaust inner front duct 
    segment assemblies that are installed in accordance with PW ASB No. 
    6039, Revision 3, dated October 15, 1993, or earlier revisions of PW 
    ASB No. 6039, and either PW honeycomb third stage outer airseal P/N 
    801931, 802097, 797594, or 798279; or Pyromet Industries, Inc., 
    honeycomb third stage outer airseal P/N PI9336; or McClain 
    International, Inc., honeycomb third stage outer airseal P/N M2433; 
    or a turbine case shield assembly installed in accordance with PW 
    ASB No. 6039, Revision 3, dated October 15, 1993, or earlier 
    revisions of PW ASB No. 6039; or a third stage blade set that has 
    third stage turbine blades that were installed in accordance with PW 
    SB No. 5331, dated October 27, 1982, perform the installations 
    required by paragraphs (a)(2), (a)(3), and (a)(4) of this AD, at the 
    times specified in those respective paragraphs.
        (c) For the purpose of this AD, a shop visit is defined as an 
    engine removal, where engine maintenance entails separation of pairs 
    of major mating engine flanges or the removal of a disk, hub, or 
    spool at a maintenance facility that is capable of compliance with 
    the instructions of this AD, regardless of other planned 
    maintenance, except for field maintenance type activities performed 
    at this maintenance facility in lieu of performing them on-wing or 
    at another peripheral facility.
        (d) An alternative method of compliance or adjustment of the 
    compliance time that provides an acceptable level of safety may be 
    used if approved by the Manager, Engine Certification Office. The 
    request should be forwarded through an appropriate FAA Principal 
    Maintenance Inspector, who may add comments and then send it to the 
    Manager, Engine Certification Office.
    
        Note 3: Information concerning the existence of approved 
    alternative methods of compliance with this airworthiness directive, 
    if any, may be obtained from the Engine Certification Office.
    
        (e) Special flight permits may be issued in accordance with 
    sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
    CFR 21.197 and 21.199) to operate the aircraft to a location where 
    the requirements of this AD can be accomplished.
    
        Issued in Burlington, Massachusetts, on March 24, 1997.
    James C. Jones,
    Acting Manager, Engine and Propeller Directorate, Aircraft 
    Certification Service.
    [FR Doc. 97-8164 Filed 3-31-97; 8:45 am]
    BILLING CODE 4910-13-U
    
    
    

Document Information

Published:
04/01/1997
Department:
Transportation Department
Entry Type:
Proposed Rule
Action:
Notice of proposed rulemaking (NPRM).
Document Number:
97-8164
Dates:
Comments must be received by May 1, 1997.
Pages:
15437-15439 (3 pages)
Docket Numbers:
Docket No. 97-ANE-07
RINs:
2120-AA64: Airworthiness Directives
RIN Links:
https://www.federalregister.gov/regulations/2120-AA64/airworthiness-directives
PDF File:
97-8164.pdf
CFR: (1)
14 CFR 39.13