99-7984. Tristate Pipeline, L.L.C.; Notice of Site Visit
[Federal Register Volume 64, Number 62 (Thursday, April 1, 1999)]
[Notices]
[Pages 15739-15740]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-7984]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP99-61-000 and CP99-64-000]
Tristate Pipeline, L.L.C.; Notice of Site Visit
March 26, 1999.
From April 19 to 22, 1999, the Office of Pipeline Regulation (OPR)
staff will conduct an inspection of the route proposed by TriState
Pipeline, L.L.C. (TriState) for its pipeline project. The
[[Page 15740]]
proposed route and route alternatives, crossing portions of Illinois,
Indiana, and Michigan, will be inspected by helicopter and automobile.
The current itinerary is to conduct a ground and aerial inspection
between Joliet, Illinois, and Valparaiso, Indiana on April 19; a ground
and aerial inspection between Valparaiso, Indiana and White Pigeon,
Michigan and April 20; a ground and aerial inspection in Oakland County
and Macomb County, Michigan on April 21, and a ground inspection in
Macomb County, Michigan on April 22. If weather conditions preclude an
overflight, the inspection will be conducted by automobile only from a
location to be determined. Representatives of TriState will accompany
the OPR staff.
All parties may attend, although those planing to attend must
provide their own transportation.
For further information, please contact Paul McKee of the
Commission's Office of External Affairs at (202) 208-1088.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-7984 Filed 3-31-99; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 04/01/1999
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 99-7984
- Pages:
- 15739-15740 (2 pages)
- Docket Numbers:
- Docket Nos. CP99-61-000 and CP99-64-000
- PDF File:
-
99-7984.pdf